2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal
ML23095A372
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/05/2023
From: Timothy Peter
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML23095A371 List:
References
JAFP-23-0014
Download: ML23095A372 (1)


Text

Proprietary Information - Withhold Under 10 CFR 2.390 James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Timothy C. Peter Site Vice President - JAF JAFP-23-0014 April 5, 2023 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket No. 50-333

Subject:

2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal

Dear Sir or Madam:

The changes to the Final Safety Analysis Report (FSAR) for the James A. FitzPatrick Nuclear Power Plant (JAF) are being submitted as required by 10 CFR 50.71(e).

This submittal also includes the changes made to the JAF Technical Specifications Bases and the Technical Requirements Manual (TRM), which are controlled under 10 CFR 50.59, and submitted to the NRC biennially with the changes to the FSAR.

The changes and their bases are summarized in Attachment 1, 2, and 3. The changed pages are included in Enclosures 1, 2, and 3 respectively. contains proprietary information, specifically the TRM Appendix F, Pressure and Temperature Limits Report. The Electric Power Research Institute (EPRI), as the owner of the proprietary information, has executed the enclosed affidavit within Enclosure 3. It identifies which information should be handled as proprietary. Enclosure 3 is requested to be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390 and 9.17. A non-proprietary version of the documentation is provided in Enclosure 4.

There are no new regulatory commitments contained in this letter. If you have any questions, please contact Mr. Mark R. Hawes, Regulatory Assurance Manager (Acting), at 315-349-6659. to this letter contains Proprietary Information that should be withheld from public disclosure per 10 CFR 2.390. When Separated from Enclosure 3 there are no applicable withholding criteria.

Proprietary Information - Withhold Under 10 CFR 2.390 JAFP-23-0014 Page 2of2 As required by 10 CFR 50.71(e)(2)(i), I certify that the information accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement.

Tim Site TCP/mh Attachments 1: Table of Final Safety Analysis Report (FSAR) 2023 Changes 2: Table of Technical Specification (TS) Bases 2023 Changes 3: Table of Technical Requirements Manual (TRM) 2023 Changes Enclosures 1: Final Safety Analysis Report (FSAR) 2023 2: Technical Specification (TS) Bases Revision 58 3: Technical Requirements Manual (TRM) Revision 109 (Proprietary) 4: Technical Requirements Manual (TRM) Revision 109 (Non-Proprietary) cc: (w/out enclosures)

NRC Region 1 Administrator NRC Resident Inspector NRC Project Manager NYPSC NYSE RDA Enclosure 3 to this letter contains Proprietary Information that should be withheld from public disclosure per 10 CFR 2.390. When Separated from Enclosure 3 there are no applicable withholding criteria.

JAFP-23-0014 ATTACHMENT 1 Table of Final Safety Analysis Report (FSAR) 2023 Changes (3 Pages)

JAFP-23-0014 Attachment 1 Table of Final Safety Analysis Report (FSAR) 2023 Changes FSAR Section /

Description of Change Justification for Change Table / Figure 5.2, 13.8, 14.6 Implementation of Emergency Engineering Change Procedure Guidelines / Severe EC 631287 Accident Guidelines Revision 4; along with procedure identification changes 8.3, 8.7, 10.2, F8.3-1, Replace Existing GE Alterrex Engineering Change F8.7-1 sh 2 of 5, Automatic Voltage Regulator (AVR) EC 621773 F8.7-1 sh 4 of 5 with Digital ABB Unitrol Model 7.2, 17.16, T7.16-1 EPIC System Upgrade Engineering Change sh 1 of 2, T7.16-1 sh EC 622768, EC 722769 2 of 2, F7.16-1, F7.16-2 9.3 Typo correction Editorial 13.10 Update Nuclear Safety Review Non-Regulatory Change Board (NSRB) procedure 2.3, 12.3, 16.1, Removal of Remaining Intake Engineering Change F12.3-27, F16.1-7 Structure Bar-Racks EC 628429 8.9, F8.2-1, F8.5-1 71T-4 and 71T-6 Transformer Engineering Change Replacement EC 629002 3.2, 3.10, 9.2, 9.3, GNF3 Fuel Introduction and Engineering Change T3.2-1, F3.2-6 Receipt for Placement in Fuel EC 636173, and Storage Racks Non-Regulatory Change 3.2, 3.3 3.4, 3.7, 3.10, GNF3 New Fuel Introduction for Engineering Change 4.4, 5.2, 6.5, 6.7, Irradiation and Operation and Cycle EC 629266, EC 635427 8.11, 14.5, 14.6, 14.9, 26 Reload 16.9, 16.10, T3.3-2, T4.2-3, T6.5-1, T14.4-3, F3.4-6, F14.5-10, F14.5-10a F9.9-5 sh 4 Replacement of Battery Room Engineering Change temperature controller 72TIC-122B EC 634574 F8.2-1, F8.5-1, 71T-6 Transformer Replacement Engineering Change F8.5-4 EC 629001, EC 623067 F3.7-1 Power Flow update for Cycle 25 Engineering Change analysis EC 636604 1.8, 14.8, 14.9, Increased Core Average Exposure Engineering Change T14.8-4, T14.8-8, (CAVEX) EC 631688 T14.8-9, T14.8-10, T14.8-11 Page 1 of 3

JAFP-23-0014 Attachment 1 Table of Final Safety Analysis Report (FSAR) 2023 Changes FSAR Section /

Description of Change Justification for Change Table / Figure 1.1, 1.2, 1.9, 1.10, Exelon to Constellation name Technical Specification 2.1, 7.1, 7.19, 8.1, change per TSA-347 ownership Amendment 347 8.6, 8.11, 9.8, 9.15, change 12.5, 13.1, 13.2, 13.8, 13.10, 16.5, 16.7, 16.8, 16.9, 16.10, 16.11, 17.1, T2.1-4, T16.5-1 sh 1 of 2, F8.1-1 8.5 Conductor Temperature Failure 10 CFR 50.59 Screen Threshold JAF-SCN-22-048 7.2, 7.3, T7.2-5, Reactor Protection System (RPS) / Technical Specification T7.3-12 Primary Containment Isolation Amendment 351 System (PCIS) Response Time Testing (RTT)

T7.2-1 Alarm Setting for the Primary Engineering Change Containment High Pressure EC 628149 function 8.4, 8.5, 9.22, F8.5-1, New Power Feeds for the Decay Engineering Change F8.5-4 Heat Removal (DHR) System. EC 634221 7.11, 10.2 Temporary Configuration Change Engineering Change for Lifting Leads to Fast Acting EC 632655 Solenoid Valves (FASV) to Turbine Intercept Valves F10.8-2 sh 1 of 2 Feedwater injection line cut and Engineering Change cap to 1st and 2nd stage Moisture EC 633776 Separator Reheater (MSR) drain tanks 8.4, F8.3-1 NERC Relay Replacement Engineering Change EC 632375 7.11, F7.11-1 Removal of Loss of Stator Water Engineering Change Cooling automatic main turbine trip EC 635985 14.5, 14.9, T14.4-3 TRACG Anticipated Transient Engineering Change Without Scram (ATWS) EC 638106 Overpressure Analysis Implementation 2.6 Retirement of Drywell Seismic Engineering Change Monitor 09VD-2 EC 633347 F10.8-3 Condensate Pump (33P-8B) Engineering Change Replacement with upgrades EC 632362 Page 2 of 3

JAFP-23-0014 Attachment 1 Table of Final Safety Analysis Report (FSAR) 2023 Changes FSAR Section /

Description of Change Justification for Change Table / Figure 16.10 Update Bolted Cables Connection 10 CFR 50.59 Screen Aging Management Program for JAF-SCN-23-009 completed one-time inspection 16.10 Update Aging Management Non-regulatory change Program status for Boiling Water Reactor (BWR) Vessel Internals Program, Containment Inservice Inspection (CII) Program, Inservice Inspection (ISI) Program, and Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel.

13.8 Security Plan Revision 23 10 CFR 50.54(p)

Page 3 of 3

JAFP-23-0014 ATTACHMENT 2 Table of Technical Specification (TS) Bases 2023 Changes (2 Page)

JAFP-23-0014 Attachment 2 Table of Technical Specification (TS) Bases 2023 Changes TS Bases Description of Change Justification for Change Section 3.4.7, 3.4.8, TSTF-566 Revise Actions Technical Specification Amendment 340 3.9.7, 3.9.8 for Inoperable RHR-Shutdown Cooling Subsystems 3.6.3.2 TSTF-478 Delete Technical Specification Amendment 341 Containment Atmosphere Dilution (CAD) System 3.3.1.1 TSTF-573 Reactor 10 CFR 50.59 Screen Protection System (RPS) JAF-SCN-21-026 for Main Steam Isolation Valve (MSIV) and Turbine Stop Valve (TSV)

Functions Clarification 3.7.2 Removal of remaining Bar Engineering Change Racks from Intake EC 628429 structure 3.6.1.3 Revise the containment Technical Specification Amendment 343 venting flow path as described in Surveillance Requirement (SR) 3.6.1.3.1.

3.0 TSTF-565 Revise the LCO 10 CFR 50.59 Screen 3.0.2 and LCO 3.0.3 Bases JAF-SCN-21-053 3.0, 3.1.7, TSTF-545 IST program Technical Specification Amendment 344 3.1.8, 3.4.3, definition 3.5.1, 3.6.1.3, 3.6.1.6, 3.6.1.7, 3.6.1.9, 3.6.2.3 3.3.5.2, TSTF-582 Reactor Technical Specification Amendment 345 3.3.8.1, Pressure Vessel Water 3.5.2, Inventory Control 3.6.1.3, 3.8.2 (RPVWIC) Enhancements 3.4.4 TSTF-554 Revise Reactor Technical Specification Amendment 346 Coolant Leakage Requirements 3.5.1 Emergency Core Cooling Technical Specification Amendment 348 System - Operating surveillance SR 3.5.1.6 frequency change Page 1 of 2

JAFP-23-0014 Attachment 2 Table of Technical Specification (TS) Bases 2023 Changes TS Bases Description of Change Justification for Change Section 3.5.1, 3.5.2, TSTF-541 Exceptions for Technical Specification Amendment 349 3.5.3, valve and dampers locked 3.6.4.3, 3.7.2 in actuated position 3.3.1.1, TSTF-264 Delete Flux Technical Specification Amendment 350 3.3.1.2 Monitors Specific Overlap Requirement Surveillances 3.3.1.1, Response time testing Technical Specification Amendment 351 3.3.6.1 deletion based on NEDO-32291-A Supplement 2.1.1, 3.2.1, Nuclear Fuel Transition to 10 CFR 50.59 Screen 3.2.2, 3.2.3 GNF3 at FitzPatrick JAF-SCN-22-011 3.1.7, TSTF-505 Risk-Informed Technical Specification Amendment 353 3.3.1.1, Extended Completion 3.3.2.2, Times (RICT) 3.3.4.1, 3.3.5.1, 3.3.5.3, 3.3.6.1, 3.5.1, 3.5.3, 3.6.1.2, 3.6.1.3, 3.6.1.6, 3.6.1.7, 3.6.1.9, 3.6.2.3, 3.7.1, 3.7.2, 3.7.6, 3.8.1, 3.8.4, 3.8.7 Page 2 of 2

JAFP-23-0014 ATTACHMENT 3 Table of Technical Requirements Manual (TRM) 2023 Changes (3 Pages)

JAFP-23-0014 Attachment 3 Table of Technical Requirements Manual (TRM) 2023 Changes TRM Description of Change Justification for Change Page / Table Appendix I Surveillance Frequency Control Program Change Request Numbers:

(SFCP) changes JF-18-010 Rev 1 JF-18-006 Rev 1 JF-17-011 JF-17-012 JF-18-014 JF-19-003 JF-17-003 Rev 3 JF-20-009 JF-21-005 JF-21-004 JF-17-008 Phase 2 JF-21-006 JF-22-001 JF-19-012 JF-21-008 JF-21-009 JF-21-006 Phase 2 JF-21-007 JF-22-002 JF-22-004 JF-22-005 JF-18-008 JF-22-001 Phase 2 JF-22-009 JF-18-016 JF-19-002 JF-22-008 JF-19-005 JF-21-003 JF-18-007 JF-19-001 JF-19-012 Phase 2 JF-23-003 3.3.I-1, 3.3.I-2, Change frequency from 184 days to 24 Engineering Change B3.3.I-1 months for TRS 3.3.I.1 and TRS 3.3.I.2. EC 633897 Operable to Functional vocabulary change.

I-14, BI-17 Delete Containment Atmosphere Dilution Technical Specification (CAD) System surveillances from SFCP. Amendment 341 3.7.H-2, 3.7.H- Fire Protection System Components Engineering Change 3, 3.7.Q-2 Test/Inspection Performance Based EC 634375 Evaluation Update.

Appendix H Offsite Dose Calculation Manual Revision 10 CFR 50.59 Applicability 2.

Page 1 of 3

JAFP-23-0014 Attachment 3 Table of Technical Requirements Manual (TRM) 2023 Changes TRM Description of Change Justification for Change Page / Table 3.3.B-2 Change frequency from 184 days to 12 10 CFR 50.59 Screen months for TRS 3.3.B.4, Control Rod JAF-SCN-21-046 Block Instrumentation Channel Calibration.

3.8.A-1, Change frequency to 30 Months- Engineering Change B3.8.A-1 Staggered Test Basis for TRS 3.8.A.3, EC 633810 Low Pressure Coolant Injection (LPCI)

Motor Operated Valve (MOV) Independent Power Supple (IPS) performance based test 5.0-14 Procedure change AP-15.12 to CY-JF- 10 CFR 50.59 Applicability 150-350 in TRM 5.5.J, Diesel Fuel Oil Testing Program I-13, BI-14 Reactor Pressure Vessel Water Inventory Technical Specification Control (RPVWIC) Enhancements, update Amendment 345 to surveillances in SFCP.

3.3.A-2 Correct administrative error in TRM Editorial Section 3.3.A surveillance table.

Appendix G Core Operating Limits Report (COLR) Engineering Change Revision 2 during mid-cycle 25. feedwater EC 636604 heater mid-cycle to add Feedwater Heater Out of Service (FWHOOS).

I-4, BI-3 Delete flux monitor surveillances from the Technical Specification SFCP. Amendment 350 3.8.A-1, 3.8.B- Change frequency from 7 days to 31 days Engineering Change 1 for Low Pressure Coolant Injection (LPCI) EC 637213 Motor Operated Valve (MOV) Independent Power Supple (IPS) Visual Inspection TRS 3.8.A.1, Inverter and TRS 3.8.A.2, Battery; and, 125 VDC Battery Chargers Visual Inspection TRS 3.8.B.1.

I-9, BI-5, BI-11 Delete response time testing surveillance Technical Specification from SFCP. Amendment 351 Appendix G COLR Revision 3 for Cycle 26. Engineering Change EC 635427 3.3.H-1, Change frequency from 24 months to 48 Engineering Change 3.3.H-2, months for TRS 3.3.H.4, Core and EC 636135 B3.3.H-1 Containment Cooling Systems Initiation and Control Instrumentation Channel Functional Test, Table 3.3.H-1 Function 7, LPCI Cross-Connect Valve Position (ST-2T).

Page 2 of 3

JAFP-23-0014 Attachment 3 Table of Technical Requirements Manual (TRM) 2023 Changes TRM Description of Change Justification for Change Page / Table 3.3.A-1, Change frequency from 24 months to 24 Engineering Change B3.3.A-1 months-Staggered for TRS 3.3.A.1, RHR EC 636644 Shutdown Cooling Channel Calibration (ISP-200).

3.3.I-2, Change frequency from 24 months to 24 Engineering Change B3.3.I-1 months-Staggered for TRS 3.3.I.3, S/RV EC 636645 Electric Lift Instrumentation Channel Calibration (ISP-275A, ISP-275B).

Page 3 of 3