Text
Proprietary Information - Withhold Under 10 CFR 2.390 to this letter contains Proprietary Information that should be withheld from public disclosure per 10 CFR 2.390. When Separated from Enclosure 3 there are no applicable withholding criteria.
James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Timothy C. Peter Site Vice President - JAF JAFP-23-0014 April 5, 2023 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket No. 50-333
Subject:
2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal
Dear Sir or Madam:
The changes to the Final Safety Analysis Report (FSAR) for the James A. FitzPatrick Nuclear Power Plant (JAF) are being submitted as required by 10 CFR 50.71(e).
This submittal also includes the changes made to the JAF Technical Specifications Bases and the Technical Requirements Manual (TRM), which are controlled under 10 CFR 50.59, and submitted to the NRC biennially with the changes to the FSAR.
The changes and their bases are summarized in Attachment 1, 2, and 3. The changed pages are included in Enclosures 1, 2, and 3 respectively. contains proprietary information, specifically the TRM Appendix F, Pressure and Temperature Limits Report. The Electric Power Research Institute (EPRI), as the owner of the proprietary information, has executed the enclosed affidavit within Enclosure 3. It identifies which information should be handled as proprietary. Enclosure 3 is requested to be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390 and 9.17. A non-proprietary version of the documentation is provided in Enclosure 4.
There are no new regulatory commitments contained in this letter. If you have any questions, please contact Mr. Mark R. Hawes, Regulatory Assurance Manager (Acting), at 315-349-6659.
Proprietary Information - Withhold Under 10 CFR 2.390 JAFP-23-0014 Page 2of2 As required by 10 CFR 50.71(e)(2)(i), I certify that the information accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement.
Tim Site TCP/mh Attachments 1:
Table of Final Safety Analysis Report (FSAR) 2023 Changes 2:
Table of Technical Specification (TS) Bases 2023 Changes 3:
Table of Technical Requirements Manual (TRM) 2023 Changes Enclosures 1:
Final Safety Analysis Report (FSAR) 2023 2:
Technical Specification (TS) Bases Revision 58 3:
Technical Requirements Manual (TRM) Revision 109 (Proprietary) 4:
Technical Requirements Manual (TRM) Revision 109 (Non-Proprietary) cc: (w/out enclosures)
NRC Region 1 Administrator NRC Resident Inspector NRC Project Manager NYPSC NYSE RDA to this letter contains Proprietary Information that should be withheld from public disclosure per 10 CFR 2.390. When Separated from Enclosure 3 there are no applicable withholding criteria.
JAFP-23-0014 ATTACHMENT 1 Table of Final Safety Analysis Report (FSAR) 2023 Changes (3 Pages)
JAFP-23-0014 Table of Final Safety Analysis Report (FSAR) 2023 Changes Page 1 of 3 FSAR Section /
Table / Figure Description of Change Justification for Change 5.2, 13.8, 14.6 Implementation of Emergency Procedure Guidelines / Severe Accident Guidelines Revision 4; along with procedure identification changes Engineering Change EC 631287 8.3, 8.7, 10.2, F8.3-1, F8.7-1 sh 2 of 5, F8.7-1 sh 4 of 5 Replace Existing GE Alterrex Automatic Voltage Regulator (AVR) with Digital ABB Unitrol Model Engineering Change EC 621773 7.2, 17.16, T7.16-1 sh 1 of 2, T7.16-1 sh 2 of 2, F7.16-1, F7.16-2 EPIC System Upgrade Engineering Change EC 622768, EC 722769 9.3 Typo correction Editorial 13.10 Update Nuclear Safety Review Board (NSRB) procedure Non-Regulatory Change 2.3, 12.3, 16.1, F12.3-27, F16.1-7 Removal of Remaining Intake Structure Bar-Racks Engineering Change EC 628429 8.9, F8.2-1, F8.5-1 71T-4 and 71T-6 Transformer Replacement Engineering Change EC 629002 3.2, 3.10, 9.2, 9.3, T3.2-1, F3.2-6 GNF3 Fuel Introduction and Receipt for Placement in Fuel Storage Racks Engineering Change EC 636173, and Non-Regulatory Change 3.2, 3.3 3.4, 3.7, 3.10, 4.4, 5.2, 6.5, 6.7, 8.11, 14.5, 14.6, 14.9, 16.9, 16.10, T3.3-2, T4.2-3, T6.5-1, T14.4-3, F3.4-6, F14.5-10, F14.5-10a GNF3 New Fuel Introduction for Irradiation and Operation and Cycle 26 Reload Engineering Change EC 629266, EC 635427 F9.9-5 sh 4 Replacement of Battery Room temperature controller 72TIC-122B Engineering Change EC 634574 F8.2-1, F8.5-1, F8.5-4 71T-6 Transformer Replacement Engineering Change EC 629001, EC 623067 F3.7-1 Power Flow update for Cycle 25 analysis Engineering Change EC 636604 1.8, 14.8, 14.9, T14.8-4, T14.8-8, T14.8-9, T14.8-10, T14.8-11 Increased Core Average Exposure (CAVEX)
Engineering Change EC 631688
JAFP-23-0014 Table of Final Safety Analysis Report (FSAR) 2023 Changes Page 2 of 3 FSAR Section /
Table / Figure Description of Change Justification for Change 1.1, 1.2, 1.9, 1.10, 2.1, 7.1, 7.19, 8.1, 8.6, 8.11, 9.8, 9.15, 12.5, 13.1, 13.2, 13.8, 13.10, 16.5, 16.7, 16.8, 16.9, 16.10, 16.11, 17.1, T2.1-4, T16.5-1 sh 1 of 2, F8.1-1 Exelon to Constellation name change per TSA-347 ownership change Technical Specification Amendment 347 8.5 Conductor Temperature Failure Threshold 10 CFR 50.59 Screen JAF-SCN-22-048 7.2, 7.3, T7.2-5, T7.3-12 Reactor Protection System (RPS) /
Primary Containment Isolation System (PCIS) Response Time Testing (RTT)
Technical Specification Amendment 351 T7.2-1 Alarm Setting for the Primary Containment High Pressure function Engineering Change EC 628149 8.4, 8.5, 9.22, F8.5-1, F8.5-4 New Power Feeds for the Decay Heat Removal (DHR) System.
Engineering Change EC 634221 7.11, 10.2 Temporary Configuration Change for Lifting Leads to Fast Acting Solenoid Valves (FASV) to Turbine Intercept Valves Engineering Change EC 632655 F10.8-2 sh 1 of 2 Feedwater injection line cut and cap to 1st and 2nd stage Moisture Separator Reheater (MSR) drain tanks Engineering Change EC 633776 8.4, F8.3-1 NERC Relay Replacement Engineering Change EC 632375 7.11, F7.11-1 Removal of Loss of Stator Water Cooling automatic main turbine trip Engineering Change EC 635985 14.5, 14.9, T14.4-3 TRACG Anticipated Transient Without Scram (ATWS)
Overpressure Analysis Implementation Engineering Change EC 638106 2.6 Retirement of Drywell Seismic Monitor 09VD-2 Engineering Change EC 633347 F10.8-3 Condensate Pump (33P-8B)
Replacement with upgrades Engineering Change EC 632362
JAFP-23-0014 Table of Final Safety Analysis Report (FSAR) 2023 Changes Page 3 of 3 FSAR Section /
Table / Figure Description of Change Justification for Change 16.10 Update Bolted Cables Connection Aging Management Program for completed one-time inspection 10 CFR 50.59 Screen JAF-SCN-23-009 16.10 Update Aging Management Program status for Boiling Water Reactor (BWR) Vessel Internals Program, Containment Inservice Inspection (CII) Program, Inservice Inspection (ISI) Program, and Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel.
Non-regulatory change 13.8 Security Plan Revision 23 10 CFR 50.54(p)
JAFP-23-0014 ATTACHMENT 2 Table of Technical Specification (TS) Bases 2023 Changes (2 Page)
JAFP-23-0014 Table of Technical Specification (TS) Bases 2023 Changes Page 1 of 2 TS Bases Section Description of Change Justification for Change 3.4.7, 3.4.8, 3.9.7, 3.9.8 TSTF-566 Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Technical Specification Amendment 340 3.6.3.2 TSTF-478 Delete Containment Atmosphere Dilution (CAD) System Technical Specification Amendment 341 3.3.1.1 TSTF-573 Reactor Protection System (RPS) for Main Steam Isolation Valve (MSIV) and Turbine Stop Valve (TSV)
Functions Clarification 10 CFR 50.59 Screen JAF-SCN-21-026 3.7.2 Removal of remaining Bar Racks from Intake structure Engineering Change EC 628429 3.6.1.3 Revise the containment venting flow path as described in Surveillance Requirement (SR) 3.6.1.3.1.
Technical Specification Amendment 343 3.0 TSTF-565 Revise the LCO 3.0.2 and LCO 3.0.3 Bases 10 CFR 50.59 Screen JAF-SCN-21-053 3.0, 3.1.7, 3.1.8, 3.4.3, 3.5.1, 3.6.1.3, 3.6.1.6, 3.6.1.7, 3.6.1.9, 3.6.2.3 TSTF-545 IST program definition Technical Specification Amendment 344 3.3.5.2, 3.3.8.1, 3.5.2, 3.6.1.3, 3.8.2 TSTF-582 Reactor Pressure Vessel Water Inventory Control (RPVWIC) Enhancements Technical Specification Amendment 345 3.4.4 TSTF-554 Revise Reactor Coolant Leakage Requirements Technical Specification Amendment 346 3.5.1 Emergency Core Cooling System - Operating surveillance SR 3.5.1.6 frequency change Technical Specification Amendment 348
JAFP-23-0014 Table of Technical Specification (TS) Bases 2023 Changes Page 2 of 2 TS Bases Section Description of Change Justification for Change 3.5.1, 3.5.2, 3.5.3, 3.6.4.3, 3.7.2 TSTF-541 Exceptions for valve and dampers locked in actuated position Technical Specification Amendment 349 3.3.1.1, 3.3.1.2 TSTF-264 Delete Flux Monitors Specific Overlap Requirement Surveillances Technical Specification Amendment 350 3.3.1.1, 3.3.6.1 Response time testing deletion based on NEDO-32291-A Supplement Technical Specification Amendment 351 2.1.1, 3.2.1, 3.2.2, 3.2.3 Nuclear Fuel Transition to GNF3 at FitzPatrick 10 CFR 50.59 Screen JAF-SCN-22-011 3.1.7, 3.3.1.1, 3.3.2.2, 3.3.4.1, 3.3.5.1, 3.3.5.3, 3.3.6.1, 3.5.1, 3.5.3, 3.6.1.2, 3.6.1.3, 3.6.1.6, 3.6.1.7, 3.6.1.9, 3.6.2.3, 3.7.1, 3.7.2, 3.7.6, 3.8.1, 3.8.4, 3.8.7 TSTF-505 Risk-Informed Extended Completion Times (RICT)
Technical Specification Amendment 353
JAFP-23-0014 ATTACHMENT 3 Table of Technical Requirements Manual (TRM) 2023 Changes (3 Pages)
JAFP-23-0014 Table of Technical Requirements Manual (TRM) 2023 Changes Page 1 of 3 TRM Page / Table Description of Change Justification for Change Appendix I Surveillance Frequency Control Program (SFCP) changes Change Request Numbers:
JF-18-010 Rev 1 JF-18-006 Rev 1 JF-17-011 JF-17-012 JF-18-014 JF-19-003 JF-17-003 Rev 3 JF-20-009 JF-21-005 JF-21-004 JF-17-008 Phase 2 JF-21-006 JF-22-001 JF-19-012 JF-21-008 JF-21-009 JF-21-006 Phase 2 JF-21-007 JF-22-002 JF-22-004 JF-22-005 JF-18-008 JF-22-001 Phase 2 JF-22-009 JF-18-016 JF-19-002 JF-22-008 JF-19-005 JF-21-003 JF-18-007 JF-19-001 JF-19-012 Phase 2 JF-23-003 3.3.I-1, 3.3.I-2, B3.3.I-1 Change frequency from 184 days to 24 months for TRS 3.3.I.1 and TRS 3.3.I.2.
Operable to Functional vocabulary change.
Engineering Change EC 633897 I-14, BI-17 Delete Containment Atmosphere Dilution (CAD) System surveillances from SFCP.
Technical Specification Amendment 341 3.7.H-2, 3.7.H-3, 3.7.Q-2 Fire Protection System Components Test/Inspection Performance Based Evaluation Update.
Engineering Change EC 634375 Appendix H Offsite Dose Calculation Manual Revision
- 2.
10 CFR 50.59 Applicability
JAFP-23-0014 Table of Technical Requirements Manual (TRM) 2023 Changes Page 2 of 3 TRM Page / Table Description of Change Justification for Change 3.3.B-2 Change frequency from 184 days to 12 months for TRS 3.3.B.4, Control Rod Block Instrumentation Channel Calibration.
10 CFR 50.59 Screen JAF-SCN-21-046 3.8.A-1, B3.8.A-1 Change frequency to 30 Months-Staggered Test Basis for TRS 3.8.A.3, Low Pressure Coolant Injection (LPCI)
Motor Operated Valve (MOV) Independent Power Supple (IPS) performance based test Engineering Change EC 633810 5.0-14 Procedure change AP-15.12 to CY-JF-150-350 in TRM 5.5.J, Diesel Fuel Oil Testing Program 10 CFR 50.59 Applicability I-13, BI-14 Reactor Pressure Vessel Water Inventory Control (RPVWIC) Enhancements, update to surveillances in SFCP.
Technical Specification Amendment 345 3.3.A-2 Correct administrative error in TRM Section 3.3.A surveillance table.
Editorial Appendix G Core Operating Limits Report (COLR)
Revision 2 during mid-cycle 25. feedwater heater mid-cycle to add Feedwater Heater Out of Service (FWHOOS).
Engineering Change EC 636604 I-4, BI-3 Delete flux monitor surveillances from the SFCP.
Technical Specification Amendment 350 3.8.A-1, 3.8.B-1 Change frequency from 7 days to 31 days for Low Pressure Coolant Injection (LPCI)
Motor Operated Valve (MOV) Independent Power Supple (IPS) Visual Inspection TRS 3.8.A.1, Inverter and TRS 3.8.A.2, Battery; and, 125 VDC Battery Chargers Visual Inspection TRS 3.8.B.1.
Engineering Change EC 637213 I-9, BI-5, BI-11 Delete response time testing surveillance from SFCP.
Technical Specification Amendment 351 Appendix G COLR Revision 3 for Cycle 26.
Engineering Change EC 635427 3.3.H-1, 3.3.H-2, B3.3.H-1 Change frequency from 24 months to 48 months for TRS 3.3.H.4, Core and Containment Cooling Systems Initiation and Control Instrumentation Channel Functional Test, Table 3.3.H-1 Function 7, LPCI Cross-Connect Valve Position (ST-2T).
Engineering Change EC 636135
JAFP-23-0014 Table of Technical Requirements Manual (TRM) 2023 Changes Page 3 of 3 TRM Page / Table Description of Change Justification for Change 3.3.A-1, B3.3.A-1 Change frequency from 24 months to 24 months-Staggered for TRS 3.3.A.1, RHR Shutdown Cooling Channel Calibration (ISP-200).
Engineering Change EC 636644 3.3.I-2, B3.3.I-1 Change frequency from 24 months to 24 months-Staggered for TRS 3.3.I.3, S/RV Electric Lift Instrumentation Channel Calibration (ISP-275A, ISP-275B).
Engineering Change EC 636645