UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 Renaissance Boulevard KING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 4, 2012 Mr. Michael Colomb Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2012006)
Dear Mr. Colomb:
On August 15, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment program governed by IMC 0305, Operating Reactor Assessment Program.
The NRC determined the performance at FitzPatrick during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. Furthermore, the NRC will perform Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal and IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
M. Colomb 2
On January 25, 2012, the NRC issued a Confirmatory Order which included a severity level III traditional enforcement violation associated with willfulness. Therefore, the NRC plans to conduct IP 92702, Follow-up on Traditional Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders and Alternate Dispute Resolution Confirmatory Orders" to follow-up on actions as documented in the Confirmatory Order.
From June 2011 to April 2012, the NRC also issued three severity level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct IP 92723, Follow-Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow-up on these violations.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mel Gray, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-333 License No. DPR-59
Enclosure:
James A. FitzPatrick Inspection/Activity Plan cc w/encl:
Distribution via ListServ
ML12244A341 SUNSI Review Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP NAME BBickett MGray DATE 08/28/12 09/04/12
Page 1 of 2 08/31/2012 07:18:41 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 07/01/2012 - 12/31/2013 9/10 EXM
- FITZPATRICK 2ND INITIAL OL EXAM 3
1 FY12-FITZ INITIAL OPERATOR LICENSING EXAM (2ND)
U01879 08/06/2012 08/10/2012 1
FY12-FITZ INITIAL OPERATOR LICENSING EXAM (2ND)
U01879 09/10/2012 09/14/2012 71124.05
- RAD INSTRUMENTS INSPECTION 1
1 IP Radiation Monitoring Instrumentation 71124.05 07/09/2012 07/13/2012 60855
- ISFSI OPERATIONAL INSPECTION 1
1 IP Operation Of An ISFSI 60855 07/23/2012 07/23/2012 1
IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/23/2012 07/23/2012 71124.06
- RETS INSPECTION 1
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/06/2012 08/10/2012 1
IP RETS/ODCM Radiological Effluent 71151-PR01 08/06/2012 08/10/2012 TI-185
- VOLUNTARY GROUND WATER INITIATIVE FOLLOW 1
1 IP Follow-up on the Industry's Ground Water Protection Initiative 2515/185 08/06/2012 08/10/2012 TI-187
- TI-187 FLOODING WALKDOWNS 1
1 IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 09/01/2012 11/30/2012 TI-188
- TI -188 SEISMIC WALKDOWNS 1
1 IP Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 2515/188 09/01/2012 11/30/2012 7111108G
- INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - BWR 7111108G 09/24/2012 09/28/2012 71124
- HP-EXPOSURE CONTROLS & DOSE ASSESSMENT 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/24/2012 09/28/2012 1
IP Occupational ALARA Planning and Controls 71124.02 09/24/2012 09/28/2012 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/24/2012 09/28/2012 1
IP Occupational Dose Assessment 71124.04 09/24/2012 09/28/2012 1
IP Occupational Exposure Control Effectiveness 71151-OR01 09/24/2012 09/28/2012 71003
- LR COMMITMENTS INSP - PHASE I 2
1 IP Post-Approval Site Inspection for License Renewal 71003 10/01/2012 10/05/2012 92702
- CONF. ORDER FOLLOWUP RIVERBEND ADR QA/QC 1
1 IP Followup On Corrective Actions For Violations And Deviations 92702 10/01/2012 12/31/2012 92702
- CONF. ORDER FOLLOWUP FITZ ADR ACTION A-D 1
1 IP Followup On Corrective Actions For Violations And Deviations 92702 10/01/2012 12/31/2012 92723
- FOLLOWUP FOR THREE SL IV TE VIOLATIONS 2
1 IP Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S 92723 10/01/2012 12/31/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 08/31/2012 07:18:41 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 07/01/2012 - 12/31/2013 92702
- CONF. ORDER FOLLOWUP FITZ ADR ACTION E-F 1
1 IP Followup On Corrective Actions For Violations And Deviations 92702 01/01/2013 03/31/2013 60855
- ISFSI LOADING INSPECTION 2
1 IP Operation Of An ISFSI 60855 03/01/2013 06/30/2013 1
IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 03/01/2013 06/30/2013 71124
- RADIATION SAFETY INSPECTION 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/25/2013 03/29/2013 1
IP Occupational ALARA Planning and Controls 71124.02 03/25/2013 03/29/2013 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/25/2013 03/29/2013 1
IP Occupational Dose Assessment 71124.04 03/25/2013 03/29/2013 EX INSP
- EP EXERCISE INSPECTION 1
1 IP Exercise Evaluation 7111401 05/13/2013 05/17/2013 9/16 EXM
- FITZPATRICK INITIAL EXAM 4
1 FY13-FITZ INITIAL OPERATOR LICENSING EXAM U01873 08/19/2013 08/23/2013 1
FY13-FITZ INITIAL OPERATOR LICENSING EXAM U01873 09/16/2013 09/27/2013 7111121
- CDBI 6
1 IP Component Design Bases Inspection 7111121 06/10/2013 06/14/2013 1
IP Component Design Bases Inspection 7111121 06/24/2013 06/28/2013 1
IP Component Design Bases Inspection 7111121 07/08/2013 07/12/2013 71124
- RADIATION SAFETY INSPECTION 1
1 IP Radiological Environmental Monitoring Program 71124.07 06/03/2013 06/07/2013 1
IP Performance Indicator Verification 71151 06/03/2013 06/07/2013 71124
- RADIATION SAFETY INSPECTION 1
1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/12/2013 08/16/2013 1
IP Occupational Dose Assessment 71124.04 08/12/2013 08/16/2013 71124
- RADIATION SAFETY INSPECTION 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/21/2013 10/25/2013 1
IP Occupational ALARA Planning and Controls 71124.02 10/21/2013 10/25/2013 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/21/2013 10/25/2013 1
IP Occupational Dose Assessment 71124.04 10/21/2013 10/25/2013 1
IP Performance Indicator Verification 71151 10/21/2013 10/25/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.