UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2012001)

Dear Mr. Colomb:

On February 13, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, FitzPatrick operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at FitzPatrick during the most recent quarter was within the Regulatory Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (Green) and one performance indicator was of low to moderate safety significance (White) in the Initiating Events cornerstone. Specifically, the Unplanned Power Changes per 7,000 Critical Hours performance indicator exceeded the Green/White threshold value in the fourth quarter of the assessment period.

Consistent with the graded approach in the NRCs ROP, this change in performance from the Licensee Response Column to the Regulatory Response Column results in a corresponding increase in the NRCs inspection and assessment oversight. Therefore, in addition to ROP baseline inspections, the NRC plans to schedule and conduct a supplemental inspection in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," after your staff has notified us of your readiness for this inspection. This inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition and cause were identified, and the corrective actions are sufficient to prevent recurrence.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to the baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, and TI-182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan, should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

On January 25, 2012, the NRC issued a Confirmatory Order which included a severity level III traditional enforcement violation associated with willfulness. Therefore, the NRC also plans to conduct IP 92702, Follow-up on Traditional Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders and Alternate Dispute Resolution Confirmatory Orders" to follow-up on actions as documented in the Confirmatory Order.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Art Burritt at 610-337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Darrell J. Roberts, Director Division of Reactor Projects Docket Nos. 50-333 License Nos. DPR-59 Enclosure: James A. FitzPatrick Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML13060A336 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME BBickett EKnutson via email ABurritt DRoberts DATE 02/25/13 02/25/13 02/26/13 03/04/13 Distribution w/encl: (via email)

W. Dean, RA D. Lew, DRA D. Roberts, DRP M. Layton, DRP C. Miller, DRS J. Clifford, DRS A. Burritt, DRP B. Bickett, DRP S. McCarver, DRP E. Knutson, DRP, SRI B. Sienel, DRP, RI M. Rose, DRP, AA J. Cassidy, RI OEDO DRS Branch Chiefs (6)

D. Screnci, PAO, N. Sheehan, PAO N. McNamara, SLO D. Tifft, SLO D RidsNrrPMFitzPatrick Resource RidsNrrDorlLpl1-1 Resource ROPassessment Resource RidsNrrDirslpabResource

Page 1 of 2 FitzPatrick 02/25/2013 09:04:03 Inspection / Activity Plan Report 22 01/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 92702 - CONF. ORDER FOLLOWUP FITZ ADR ACTION E-F 1 1 01/01/2013 03/31/2013 IP 92702 Followup On Corrective Actions For Violations And Deviations 71124 - RADIATION SAFETY INSPECTION 1 1 04/08/2013 04/12/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/08/2013 04/12/2013 IP 71124.02 Occupational ALARA Planning and Controls 1 04/08/2013 04/12/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/08/2013 04/12/2013 IP 71124.04 Occupational Dose Assessment 7111121 - CDBI 6 1 06/10/2013 06/14/2013 IP 7111121 Component Design Bases Inspection 1 06/24/2013 06/28/2013 IP 7111121 Component Design Bases Inspection 1 07/08/2013 07/12/2013 IP 7111121 Component Design Bases Inspection 71124 - RADIATION SAFETY INSPECTION 1 1 06/03/2013 06/07/2013 IP 71124.07 Radiological Environmental Monitoring Program 1 06/03/2013 06/07/2013 IP 71151 Performance Indicator Verification 60855 - ISFSI LOADING INSPECTION 2 1 06/01/2013 08/31/2013 IP 60855 Operation Of An ISFSI 1 06/01/2013 08/31/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants EX INSP - EP EXERCISE INSPECTION 2 1 08/12/2013 08/16/2013 IP 7111401 Exercise Evaluation 71124 - RADIATION SAFETY INSPECTION 1 1 08/12/2013 08/16/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 08/12/2013 08/16/2013 IP 71124.04 Occupational Dose Assessment TI 182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1 1 09/09/2013 09/13/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 71124 - RADIATION SAFETY INSPECTION 1 1 10/21/2013 10/25/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/21/2013 10/25/2013 IP 71124.02 Occupational ALARA Planning and Controls 1 10/21/2013 10/25/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/21/2013 10/25/2013 IP 71124.04 Occupational Dose Assessment 1 10/21/2013 10/25/2013 IP 71151 Performance Indicator Verification 4/14EXAM - FITZPATRICK INITIAL EXAM 3 1 03/10/2014 03/14/2014 U01887 FY14-FITZPATRICK INITIAL OPERATOR LICENSING EXAM 1 04/07/2014 04/11/2014 U01887 FY14-FITZPATRICK INITIAL OPERATOR LICENSING EXAM This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 FitzPatrick 02/25/2013 09:04:03 Inspection / Activity Plan Report 22 01/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71152B - PI&R BIENNIAL 4 1 04/14/2014 04/19/2014 IP 71152B Problem Identification and Resolution 1 04/28/2014 05/03/2014 IP 71152B Problem Identification and Resolution 71124 - RADIATION SAFETY INSPECTION 1 1 04/07/2014 04/11/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/07/2014 04/11/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 04/07/2014 04/11/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/07/2014 04/11/2014 IP 71124.04 Occupational Dose Assessment 71124.08 - RADWASTE 1 1 05/05/2014 05/09/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - RADIATION SAFETY INSPECTION 1 1 05/19/2014 05/23/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 05/19/2014 05/23/2014 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.