Annual Assessment Letter - James A. Fitzpatrick, (IR 05000333-10-001)
ML100621422
Person / Time
Site: FitzPatrick 
Issue date: 03/03/2010
From: Mel Gray
Reactor Projects Branch 2
To: Peter Dietrich
Entergy Nuclear Northeast
Shared Package
ML100541669 List:
References
IR-10-001
Download: ML100621422 (5)


See also: IR 05000333/2010001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD

KING OF PRUSSIA, PENNSYLVANIA 19406-1415

March 3, 2010

Mr. Peter T. Dietrich

Site Vice President

Entergy Nuclear Northeast

James A. FitzPatrick Nuclear Power Plant

Post Office Box 110

Lycoming, NY 13093

SUBJECT:

ANNUAL ASSESSMENT LETTER - JAMES A. FITZPATRICK NUCLEAR

POWER PLANT (REPORT 05000333/2010001 )

Dear Mr. Dietrich,

On February 9, 2010, the NRC staff completed its performance review of the

James A. FitzPatrick Nuclear Power Plant (FitzPatrick). Our technical staff reviewed

performance indicators (Pis) for the most recent quarter and inspection results for the period

from January 1 through December 31,2009. The purpose of this letter is to inform you of our

assessment of your safety performance during this period and our plans for future inspections

at your facility.

This performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked as "Official Use Only - Security Information" will include

the security cornerstone review and resultant inspection plan.

Overall, FitzPatrick operated in a manner that preserved public health and safety and fully met

all cornerstone objectives. Plant performance for the most recent quarter, as we" as for the

first three quarters of the assessment cycle, was within the Licensee Response column of the

NRC's Action Matrix, based on a" inspection findings being classified as having very low safety

significance (Green) and a" Pis indicating performance at a level requiring no additional NRC

oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline

inspections at your facility. We also plan to conduct an inspection of your independent spent

fuel storage installation.

The enclosed inspection plan details the inspections, less those related to physical protection,

scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of

any scheduling conflicts and personnel availability issues well in advance of inspector arrival

onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised

at the mid-cycle review.

P. Dietrich

2

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at 610-337-5209 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

?o/~fir

Mel Gray, Chie

Projects Branc 2

Division of Reactor Projects

Docket No. 50-333

License No. DPR-59

Enclosure: FitzPatrick Inspection/ Activity Plan

cc w/encl:

Distribution via ListServ

P. Dietrich

2

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, H a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly AVailable Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at 610-337-5209 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

IRA!

Mel Gray, Chief

Projects Branch 2

Division of Reactor Projects

Docket No. 50-333

License No. DPR-59

Enclosure: FitzPatrick Inspectionl Activity Plan

Distribution w/encl: (VIA E-MAIL)

S, Collins, RA

(R10RAMAIL RESOURCE)

S. RUlenkroger, DRP, RI

M. Oapas, DRA (R10RAMAIL RESOURCE)

K. Kolek, Resident OA

D. Lew, DRP

(R1DRPMAIL RESOURCE)

RidsNrrPMFitzpalrick Resource

J. Clifford. DRP (R1DRPMAIL RESOURCE)

RidsNrrDorlLpl1-1 Resource

D. Roberts. DRS (R1DRSMall Resource)

ROPreports 'Resource@nrc,gov

P. Wilson, DRS (R1DRSMaii Resource)

DRS Branch Chiefs (6)

L. Scholl, DRS

L. Trocine, RI OEOO

S.Barr,DRS

M. Gray. ORP

D. Silk, DRS

B. Bickett, DRP

J. Heinly, DRP

J. Trapp, DRS

D. Scrend, PAO

E. Keighley, DRP

N. Sheehan, PAO

S. McCarver, DRP

R. Barkley, ORA

G. Hunegs, DRP, SRI

SUNSI Review Complete: __.:::.B:::,B__ (Reviewer's Initials)

ML100621422

DOCUMENT NAME: G:\\DRP\\BRANCH2\\ROP\\ROP 1 O\\Annual Assessment Letters\\FitzPatrick

2010 Annual Assessment Letter draft,doc

After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" =Copy without attachmenUenclo5ure "E" =Copy with

attachment!

I

"N"

No copy

encosure

OFFICE

RI/DRP

I

RIIDRP

I

RI/DRP

I

NAME

BBickettiBB

MGray

DATE

2/26/2010

3/112010

OFFICIAL RECORD COPY

Page 1012

FitzPatrick

0212412010

11 ;08:48

Inspection / Activity Plan

Report 22

01/01/2010 - 06/30/2011

Planned Dates

Start

End

Title

03/1512010

0410512010

05/03/2010

0412612010

0012212010

0411212010

04/1212010

05/2312010

05/23/2010

1

05/23/2010

05/2312010

05/2312010

1

05/23/2010

1

05/23/2010

06107/2010

06/21/2010

06114/2010

0912012010

09/27/2010

09/27/2010

09127/2010

09/2712010

09/27/2010

11/15/2010

11/29/2010

03/1912010

04/09/2010

0511412010

04/3012010

0312412010

04/1612010

04/16/2010

05/2812010

05/2812010

05/28/2010

05/28/2010

05/2812010

05/2812010

05/2812010

0611112010

07/0212010

0611812010

09/2412010

10/01/2010

10/01/2010

10101/2010

10/01/2010

10/0112010

11/1912010

12/03/2010

5103EXAM

- INITIAL OPERATOR LICENSING EXAM

5

U01786

FY10 - FITZPATRICK INITIAL OPERATOR LICENSING EXAM

U01786

FY10 - FITZPATRICK INITIAL OPERATOR LICENSING EXAM

U01786

FY10 - FITZPATRICK INITIAL OPERATOR LICENSING EXAM

71111118

- REQUAL INSP WITH P/F RESULTS

3

IP 71111118

Licensed Operator Requalification Program

TI-180

- PROCEDURES & PROCESSES- MANAGING FATIGUE

1

IP 25151180

Inspection of Procedures and Processes for Managing Fatigue

71124

- RW TRANSPORTATION & ISFSI

IP 60855

Operation Of An ISFSI

IP 71124.08

Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

EP PROG

- EP PRPGRAM INSPECTION

IP 7111402

Radiological Environmental Monitoring Program

IP 7111403

Emergency Response Organization Augmentation Testing

IP 7111404

Emergency Action Level and Emergency Plan Changes

IP 7111405

Correction of Emergency Preparedness Weaknesses and Deficiencies

IP 71151-EP01

DrilllExercise Performance

IP 71151*EP02

ERO Drill PartiCipation

IP 71151-EP03

Alert & Notification System

CDBI

- COMPONENT DESIGN BASES INSPECTION

6

IP 7111121

Component Design Basas Inspection

IP7111121

Component Design Bases Inspection

71124

- HP-ACCESS

1

IP 71124.01

Radiological Hazard Assessment and Exposure Controls

7111108G

- INSERVICE INSPECTION

IP 7111108G

Inservice Inspection Activities - BWR

71124

- HP OUTAGE INSPECTION ACCESSIALARAlAIRIPI

IP 71124.01

Radiological Hazard Assessment and Exposure Controls

IP 71124.02

Occupational ALARA Planning and Controls

IP 71124.03

In-Plant Airborne Radioactivity Control and Mitigation

IP 71151..QR01

Occupational Exposure Control Effectiveness

IP 71151*PR01

RETS/ODCM Radiological Effluent

711528

- Pl&R

4

IP 711528

Identification and Resolution of Problems

IP 711526

Identification and Resolution of Problems

is report does not indude INPOand OUTAGE actiVities.

This report shows only on-site and announced inspection procedures.

Page 2 of2

FitzPatrick

0212412010

11:08:48

lnspection 1Activity Plan

Report 22

01/01/2010 - 0613012011

Planned Dates

Start

End

TItle

71124

- HP-INSTRUMENTS

03/07/2011

0311112011

IP 71124.05

Radiation Monitoring instrumentation

71124

  • Hp*EFFLUENTS

04/11/2011

04/15/2011

IP 71124.06

Radioactive Gaseous and Uquid Effluent Treatment

71124

  • HP*DOSE I REMP IISFSI

05/09/2011

05/1312011

IP 60855

Operation Of An ISFSI

05/09/2011

05/1312011

IP 71124.04

Occupational Dose Assessment

05/0912011

05/1312011

IP 71; 24.07

Public Radiation Safety

TI-177

2

05/1612011

05/2012011

IP 2515/177

Managing Gas Accumulation In Emergency Core Cooling. Decay Heat Removal & Containment Spray System

EP EX

- EP EXERCISE INSPECTION

4

06120/2011

0612412011

IP 7111401

Exercise Evaluation

0012012011

06124/2011

IP 7111404

Emergency Action Level and Emergency Plan Changes

0612012011

0612412011

IP 71151-EP01

DrilllExercise Performance

06120/2011

0612412011

IP 71151-EP02

ERO Drill Participation

06/2012011

06124/2011

IP 71151*EP03

Alert & Notification System

his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.