2003 - Annual Assessment Letter - Fitzpatrick Nuclear Power Plant (50-333/2003-001)
ML030580728
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/03/2003
From: Meyer G
Reactor Projects Branch 3
To: Ted Sullivan
Entergy Nuclear Northeast
References
IR-03-001
Download: ML030580728 (4)


See also: IR 05000333/2003001

Text

March 3, 2003

Mr. Theodore Sullivan

Vice President - Operations

Entergy Nuclear Northeast

James A. FitzPatrick Nuclear Power Plant

Post Office Box 110

Lycoming, NY 13093

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT

LETTER 50-333/2003-001

Dear Mr. Sullivan:

On February 11, 2003, the NRC staff completed its end-of-cycle plant performance assessment of

the James A. FitzPatrick Nuclear Power Plant. The end-of-cycle review for FitzPatrick involved

the participation of all technical divisions in evaluating performance indicators (PIs) for the most

recent quarter and inspection results for the period from January 1 through December 31, 2002.

The purpose of this letter is to inform you of our assessment of your safety performance during

this period and our plans for future inspections at your facility so that you will have an opportunity

to prepare for these inspections and to inform us of any planned inspections that may conflict with

your plant activities.

Overall, FitzPatrick operated in a manner that preserved public health and safety, and fully met all

cornerstone objectives. Plant performance for the most recent quarter and during the previous

three quarters was within the Licensee Response Column of the NRCs Action Matrix, based on all

inspection findings being classified as having very low safety significance (Green) and all PIs

indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we

plan to perform only baseline inspections at your facility through March 31, 2004.

As you are aware, since the terrorist attacks on September 11, 2001, the NRC has issued several

Orders and threat advisories to enhance security capabilities and improve guard force readiness.

We have conducted inspections to review your implementation of these requirements and have

monitored your actions in response to changing threat conditions. For calendar year 2003, we

plan to continue these inspections, conduct portions of the security baseline inspection program,

as well as perform additional inspections to evaluate your compliance with new requirements that

may be ordered. Based on our final determinations in this regard, we will notify you of any

inspection plan changes.

The enclosed inspection plan details the inspections scheduled through March 31, 2004. The

inspection plan is provided to minimize the resource impact on your staff and to allow for

scheduling conflicts and personnel availability to be resolved in advance of inspector arrival

2

Mr. Theodore Sullivan

onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last six months of the inspection plan are tentative and may be revised at

the mid-cycle review meeting.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at 610-337-5211 with any questions

you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Glenn Meyer, Chief

Projects Branch 3

Division of Reactor Projects, Region 1

Docket No.

50-333

License No.:

DPR-59

Enclosure:

FitzPatrick Nuclear Power Plant Inspection/Activity Plan

cc w/encl:

J. Yelverton, CEO, Entergy Operations

B. OGrady, General Manager, Entergy Nuclear Operations

J. Knubel, VP Operations Support

H. Salmon, Director of Oversight

A. Halliday, Licensing Manager

M. Kansler, Chief Operating Officer, Entergy

D. Pace, VP Engineering

J. Fulton, Assistant General Counsel

Supervisor, Town of Scriba

J. Tierney, Oswego County Administrator

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

P. Eddy, Electric Division, Department of Public Service, State of New York

W. Flynn, President, New York State Energy Research and Development Authority

S. Lousteau, Treasury Department

T. Judson, Central New York Citizens Awareness Network

3

Mr. Theodore Sullivan

Distribution w/encl:

Region I Docket Room (with concurrences)

L. Cline, DRP - NRC Senior Resident Inspector

D. Dempsey, Resident Inspector

H. Miller, RA

J. Wiggins, DRA

G. Meyer, DRP

S. Barber, DRP

T. McGinty, EDO Coordinator

R. Laufer, NRR

J. Andersen, NRR

G. Vissing, PM, NRR

R. Clark, Backup PM, NRR

T. Frye, NRR

C. See, NRR

RidsNrrDipmIipb

Institute of Nuclear Power Operations (INPO)

DOCUMENT NAME: G:\\BRANCH3\\ROP3 EOC Information\\Fitz ROP-3 EOC Letter .wpd

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with

attachment/enclosure "N" = No copy

OFFICE

RI/DRP

N

R1/DRP

N R1/DRP

R1/DRP

NAME

SBarber/GSB

LCline/LMC

GMeyer/GWM

ABlough/ARB

DATE

02/26/03

02/26/03

02/26/03

02/27/03

OFFICIAL RECORD COPY

FitzPatrick

Inspection / Activity Plan

12/29/2002 - 03/27/2004

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 1 of 1

02/25/2003

10:46:21

Report 22

1

7112201

- PUB RAD SAFETY - RETS

Baseline Inspections

03/17/2003

03/21/2003

Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems

IP 7112201

1

1

71122.02

- RADWASTE

Baseline Inspections

04/07/2003

04/11/2003

Radioactive Material Processing and Transportation

IP 7112202

1

1

71151

- EP PI VERIFICATION

Baseline Inspections

05/05/2003

05/09/2003

Performance Indicator Verification

IP 71151

1

1

71121.01

- OCC RAD SAFETY - ACCESS

Baseline Inspections

05/12/2003

05/16/2003

Access Control to Radiologically Significant Areas

IP 7112101

1

6

TI148BC

- SEC ICM

Safety Issues

05/19/2003

05/23/2003

Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures

IP 2515/148

1

1

7111107B

- HEAT SINK

Baseline Inspections

06/02/2003

06/06/2003

Heat Sink Performance

IP 7111107B

1

4

7111401

- EP EXERCISE & PI VERIFICATION

Baseline Inspections

06/02/2003

06/06/2003

Exercise Evaluation

IP 7111401

1

Baseline Inspections

06/02/2003

06/06/2003

Performance Indicator Verification

IP 71151

1

3

7/21EXM

- OPERATOR LICENSING INITIAL EXAMS

Not Applicable

06/23/2003

06/27/2003

FITZPATRICK INITIAL EXAM (5/5/03)

U01497

1

Not Applicable

07/21/2003

07/25/2003

FITZPATRICK INITIAL EXAM (5/5/03)

U01497

1

1

71122.03

- REMP

Baseline Inspections

08/11/2003

08/15/2003

Radiological Environmental Monitoring Program

IP 7112203

1

5

7111121

- SSDI

Baseline Inspections

09/15/2003

09/19/2003

Safety System Design and Performance Capability

IP 7111121

1

Baseline Inspections

09/29/2003

10/03/2003

Safety System Design and Performance Capability

IP 7111121

1

1

71121.02

- OCC RAD SAFETY - ALARA

Baseline Inspections

12/08/2003

12/12/2003

ALARA Planning and Controls

IP 7112102

1

1

7111112B

- MAINTENANCE RULE

Baseline Inspections

12/15/2003

12/19/2003

Maintenance Effectiveness

IP 7111112B

1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.