ML17321A847

From kanterella
Revision as of 08:42, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
NPDES Noncompliance Notification:On 850804,low Ph Found on Heating Boiler Blowdown Prior to Mixing W/Cooling Water. Probably Caused by Inadequate Ph Control
ML17321A847
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/15/1985
From: SMITH W G
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8508270224
Download: ML17321A847 (4)


Text

&PIC&ll~I&&tria~INDINABrMICHIGANElECTRICCOMPANYDONALDC.COOKNUCLEARPLANTP.O.Box458,Bridgman, Michigan49106(616)465.5901August15,l985UBSSS)>.iGUUTItiGECMr.J.G.Keppler,RegionalAdministrator UnitedStatesNuclearRegulatory Commission RegionIII799Roosevelt RoadGlenEllyn,IL60137Operating LicenseDPR-58/74 DocketNos.50-315/50-316

DearMr.Keppler:

Pursuanttotherequirements ofAppendixB,PartII,Nonradiological, Environmental Protection Plan,Section3.2,acopyofthereporttotheMichiganWaterResources Commission notifying themofalowpHontheHeatingBoilerblowdownpriortomixingwithcoolingwateronAugust,4,1985,isattached.

ThisreportisrequiredbyAmendment No.54toFacilityOperating LicenseNo.DPR-58andAmendment No.40toFacilityOperating LicenseNo.DPR-74datedMay6,1982.Sincerely, PlantManager/babAttachment cc:JohnE.DolanM.P.AlexichR.F.KroegerH.B.BruggerR.W.Jurgensen NRCResidentInspector R.C.Callen,MPSCG.Charnoff, Esq.J.M.HenniganH.R.Denton,NRCJ.F.StietzelDottieSherman,ANILibraryINPOPNSRCA.A.Blindi8508270224,850815 PDRADOCK050003158PDR9$985~(r~+V fWWlhI,IWIP~~~IIID9I' R.W.Jurgensen T.A.Kriesel~R.W.Reeves/C.

E.HawkK.D.MackgLItlOl400n

/E,'loacrka INDIANA&MICHIGANEIECTRICCOMPANYONESUMMITSQUARE.P.O.8OX60.FORTWAYNE.IN.46601TeIephone (219)4252111August9,1985(Corrected

~CO)RICHARDC.hIEhiGEVicePresident PaulD.Zugger,Executive Secretary MichiganWaterResources Commission StevensD.MasonBuilding, Box30026Lansing,Michigan48909

DearMr.Zugger:

RE:DonaldC.CookNuclearPlantNPDESPermitNo.MI0005827BoilerBlowdownpHTheheatingboilerwhichhadbeenlastusedonFebruary26,1985wasstartedonJuly16,1985.AsampletakenonAugust4,1985fromtheblowdownpriortomixingwithcoolingwater,hadapHof5.56.ThehighpHforthedaywas9.57.TheaverageofthreepHsamplesduringthedaywas7.87.ThelowpHvaluewaslikelytheresultofinadequate pHcontrol.Verytrulyyours,C'.RichardC.MengeVicePresident RCM/dfc:W.G.SmithIcertifyunderpenaltyoflawthatIhavepersonally examinedandamfamiliarwiththeinformation submitted onthisandallattacheddocuments; andbasedonmy'inquiryofthoseindividuals immediately responsible forobtaining theinformation, Ibelievethesubmitted information istrue,accurateandcomplete.

Iamaware,thattherearesignificant penalties forsubmitting falseinformation, including thepossibility offineandimprisonment.

c'.RichardC.Menge Jt