AGCELBRA~ED DI UTION DEMONS TION SYSTEM-REGULATO INFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBR:9211240001 DOC.DATE: 92/11/12 NOTARIZED: NO DOCKET FACIL:50+15 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION MENGE,R.C.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MORLEY,F.
Michigan, State of
SUBJECT:
NPDES noncompliance notification:on 921109,review of records determined that First Quarter 1992 samples for stormwater outfall 001S not collected. Quarterly sampling requirement added to computerized tracking sys.
DISTRIBUTION CODE:
C001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Licensing Submittal: Environmental Rept Amdt 6 Related Correspondence S
NOTES:
RECIPIENT ID CODE/NAME PD3-1 LA STANGiJ COPIES LTTR ENCL 3
1 RECIPIENT ID CODE/NAME PD3-1 PD COPIES LTTR ENCL D
INTERNAL: NRR/DET/ESGB SD OGC/HDS2 RGN3 DRSS/RPB EXTERNAL EGQG S IMPSON g F NSIC OC/L B
gt G:.F.-I-I~i NRC PDR 1
01 S
D NOTE TO ALL "RIDS RECIPIENTS:
A D
D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL
h II
InSana Michigan Power Company One Summit Square P.O. Box 60 Flirt Wayne, IN 46801 219 425 2111 Mr. Fred Morley, District Supervisor Surface Water Quality Division Michigan Department of Natural Resources 621 North 10th Street P. 0.
Box 355 Plainwell, MI 49080 INWANA NECHIGAM POWER Richard G. Menge President 219 425 2103 November 12, 1992
Dear Mr. Morley:
RE:
Cook Nuclear Plant NPDES Permit No. MI 0005827 On November 9,
- 1992, an internal review of our records revealed that the first quarter 1992 samples for Stormwater Outfall 001S had not been collected.
Part I, Section A.
5.
of the permit requires that samples be collected quarterly, for Total Copper and Total Zinc analyses.
In 'rder to prevent recurrences of this event, the quarterly sampling requirement has been added to our tracking system used for other NPDES analyses.
This computerized tracking system alerts the user that the sample is due to be collected, and will continue to appear as due until the records are signed off as completed.
This event will also
. be documented in our annual submittal of Stormwater monitoring results, due to the MDNR on March 1, 1993.
- Second, third and fourth quarter 1992 samples were collected per the permit requirements.
By copy of this
- letter, the Nuclear Regulatory Commission is notified pursuant to the requirements of Appendix B, Part IIg Nonradiological, Environmental Protection
- Plan, Section 3.2.
Very truly yours, R. C.
Men President.
RCM/sdb/050 230i04 c':
A. B. Davis - NRC Region III NRC Resident Inspector Dr. T. E. Murley NRC Document Control WRR Document Control maaaeO001
~~>lie PDR ADCIC~ 050003l5 S
PDR oO
November 12, 1992 Mr. Pred Morley, District Supervisor Page Two certify under penalty of law that I have personally examined and am familiar with the information submitted on this and all attached documents; and based on my inquiry of those individuals immediately responsible for obtaining the information, I
believe the submitted information is
- true, accurate and complete.
I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
R. C.
Me e