NPDES Noncompliance Notification:On 850716,plant Heating Boiler Started While Both NSSS Out of Svc.Blowdown Sample Taken on 851022,contained Suspended Solids Concentration of 169 Ppm.On 851023,sample Contained 195 Ppm
ML20138N627
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/24/1985
From: Menge R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Zugger P
MICHIGAN, STATE OF
References
NUDOCS 8511050260
Download: ML20138N627 (4)


Text

c

< ga n l

/ , t ,& ,

Gymm_ INDIANA &_MLCHIGAN_E ECTRIC_ COMP -

ONE SUMMIT SoVARE. P.O. box 60. FORT WAYNE. IN 1 J .

'l / ,

Telephone (219) 425 2111 .

. W

/ RICHARD C MENGE October 24, 1985  ?

i Vice President

/ ,

/

Paul D. Zugger, Executive Secretary Michigan Water Resources Commission Stevens D. Mason Building, Bo'x 30026 Lansing, Michigan 48909

Dear Mr. Zugger:

RE: Donald C. Cook Nuclear Plant NPDES Permit No. MI 0005827 Boiler Blowdown With both nuclear steam supply systems out of service, the plant heating boiler was started on July 16, 1985.

A blowdown sample taken at 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> on October 22, 1985 contained a suspended solids concentration of 169 PPM. Another sample taken at 0910 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.46255e-4 months <br /> October 23, 1985 had a concentration of 195 PPM.

Since chemical treatment is made by batch addition, we believe the elevated solids level is due to chemical shock.

By copy of this letter, the Nuclear Regulatory Commission is notified pursuant to the requirements of Appendix B, Part II, Nonradiological, Environmental Protection Plan, Section 3.2.

Very truly yours, l.

Richard C. Menge (p

Vice President RCM/df c: J. G. Keppler - NRS, Region III W. G. Smith, Jr.

I certify under penalty of law that I have personally examined and am familiar with the information submitted on this and all attached documents; and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

bL aD [.

B51024 1k Richard C. Menge 10 O DSO S S

o o j-

-g; c: M. P. Alexich - Columbus H. B. Brugger - Columbus J. E. Dolan - Columbus.

R. W. Jurgensen - Columbus

~

R. F. Kroeger - Columbus

'K. D. Mack - Columbus I .R. W. Reeves /C. E. Hawk - Columbus A. A. Blind - Cook Plant T. A. Kriesel - Cook Plant NRC Resident Inspector -- Cook Plant PNSRC - Cook Plant J. F. Stietzel - Cook Plant G. Charnoff, Esq.-- Shaw, Pittman, Potts & Trowbridge R. E. Zahler, Esq. - Shaw, Pittman, Potts & Trowbridge R. C. Callen - Michigan Public Service Commission D. R. Hahn - Michigan Department of Public Health ,

H. R. Denton - Nuclear Reactor Regulations "'"

Dottle Sherman - ANI Library '

INPO - Records Center O

F l

1 i

t

't .

nQ Q :'//9",",,u/NDIANA_& MICHIGAN _ ELECTRIC _ COMPANY ONE SUMMIT SOUARE. P.O. BOX 60 FORT WAYNE, IN. 46801 Totopnone (219) 425 2111 RICHARD C. MENGE October 24, 1985 Vice President Paul D. Zugger Executive Secretary Michigan Water Resources Commission Stevens D. Mason Building, Box 30026 Lansing, Michigan 48909

Dear Mr. Zugger:

RE: Donald C. Cook Nuclear Plant NPDES Permit No. MI 0005827 Steam Generator Blowdown While in the process of returning Unit 2 to service, a steam generator blow-down sample taken at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on October 19, 1985 had a suspended solids concentration of 2442 PPM.

The elevated solids level is most likely the result of the recent cleaning of the Unit 2 steam generators. The unit has been idle since August 24, 1985.

By copy of this letter, the Nuclear Regulatory Commission is notiified pursuant to the requirements of Appendix B, Part II, Nonradiological, Environmental Protection Plan, Section 3.2.

Very truly yours, Richard C. Menge Vice President RCM/df c: J. G. Keppler - NRS, Region III W. G. Smith, Jr.

I certify under penalty of law that I have personally examined and am f amiliar with the information submitted on this and all attached documents; and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

d u c. L Richard C. Menge h s

i i

. .,r .

c: M. P. Alexich - Columbus -

H. B. Brugger - Columbus J. E. Dolan - Columbua

.R. W. Jurgensen - Columbus R. . F. Kroeger - Columbus K. D. Mack --Columbus R. W. Reeves /C.: E. Hawk - Columbus A. A. Blind - Cook Plant T. A. Kriesel - Cook Plant NRC Resident Inspector - Cook Plant PNSRC - Cook Plant J. F. Stietzel - Cook Plant

  • G. Charnoff, Esq.-- Shaw, Pittman, Potts & Trowbridge R. E. Zahler, Esq. - Shaw, Pittman, Potts & Trowbridge R. C. Callen - Michigan Public Service Commission D. R. Hahn - Michigan Department of Public Health H. R. Denton - Nuclear Reactor Regulations 6' Dottie Sherman - ANI Library INPO - Records Center i

e