Forwards IE Insp Rept 50-306/81-13 on 810501-31 & Notice of Violation.Insp Rept & Notice of Violation Withheld (Ref 10CFR2.790)
ML20010C479
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/18/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gilbert D
NORTHERN STATES POWER CO.
References
NUDOCS 8108200120
Download: ML20010C479 (2)


Text

,

'

' p at;

.

.

'k

<

s

'

'

UNITED STATES 8'

  • " ~ i NUCLEAR REGULATORY COMMISSION h

E REGION lil

'-

h

'[

799 ROOSEVELT ROAD

b o

GLEN ELLYN,lLLINOIS 60137

.....

June 18, 1981 a

' k'

Docket No. 50-282 S

Docket No. 50-306

$ f9 Northern States Power Company 4[

ATTN:

Mr. Dennis E. Gilberts T

Senior Vice President

'T

Power Supply 414 Nicollet Mall f

g Minneapolis, MN 55401 e

,f

-

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. C. D. Feierabend and B. L. Burgess of this office on May 1-31, 1981, of activities at the Prairie Island Nuclear Generating Plant, Units 1 and 2 authorized by NRC Operating Licenses No. DPR-42 and No. DPR-60 and to the discussion of our findings with Mr. Tierney at the conclusion of the inspection.

/

The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with perscnnel.

During this inspection, certain of your activities appea ed to be in non-compliance with NRC requirements, as specified in enclosed Appendix A.

A written response, submitted under oath or affirmation, is required.

Certain areas examined during this inspection concern a subject matter which is exempt from disclosure according to Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Consequently, the enclosure to this letter (Appendix A) and your response to the noncompliance identified in the enclosure to this letter will not be placed in the Public Document Room. Therefore, your statement of corrective action regarding the noncompliance identified in the enclosure should be submitted as a separate enclosure to your transmittal letter.

In accordance vi h 10 CFR 2.790 of the Commission's regulations, a copy of this letter without Appendix A, and the inspection report will be placed in the NRC's Public Document Room.

If the inspection report contains any infor-mation that you or your contractors believe to be exempt from disclosure y

g under 10 CFR 9.5(a)(4), it is r..cessary that your (a) notify this office yD by telephone within seven (7) days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-

/

five (25) days from the date of this letter a written application to this

)

office to withhold such informatica.

Oction 2.790(b)(1) requires that

/

ATTACHMENT CONTAINS 8108200120 810618 10 CFR 2.790(d) INFORMATION

{DRADOCK05000 j

.

_<

,

" **

s #

,,jg

.

.-

.

.

.

,

..

.

, ]:

,, a -#

Ukst

-

-.

j Northern States Power Company.

-2-~

- June 18, 1981-any such application must-be accompanied by an affidavit executed by the'

owner of the information which. identifies the document-or part sought to be withheld,'and which contains a full. statement-of the reasons on the basis which it is claimed that the information should be withheld from public disclosure. This section.further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, a copy of this-letter, without Appendix A, and the enclosed inspection report will be nlace in the Public Document Room.

We will gladly discuss any questions.you have concerning this inspection.

.Sintercly, R. F. Heishman, Acting Director Division of Resident and Project Inspection Enclosures:

1.

Appendix A, Notice of Violation (Part 2.790(d) Information)

2.

IE Inspection Reports No. 50-282/81-11 and No. 50-306/81-13 cc w/encls:

F. P. Tierney, Jr.,

Plant Manager DMB/ Document Control Desk (RIDS)

Resident Inspect

, RIII cc w/0 2.790(d) Information: