IR 05000282/1981016

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-282/81-16 on 810818-21.No Noncompliance Noted.Major Areas Inspected:Matl Control & Accountability Including Facility Organization & Operation,Measurements & Control.Details Withheld (Ref 10CFR2.790)
ML20031A774
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 09/04/1981
From: Creed J, Finley A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19260J112 List:
References
50-282-81-16, NUDOCS 8109250405
Download: ML20031A774 (1)


Text

'

.

.

.

.

U.S. NUCLEAR REGULATORY COMMISSION I

0FFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-282/81-16 Docket No. 50-282 License No. DPR-42 Safeguards Group IV Licensee: Northern States Pot:er Company 414 Nicollet Mall Minneapolis, MN 55401 Facility Name: Prairie Island Nuclear Generating Plant, Unit 1

-

,

Inspection At: Prairie Island Nuclear Generating Plant, Red Wing, MN Inspection Conducted: August 18-21, 1981 Date of Last Material Control and Accounting Inspection: March 28-3), 1979 Type of Inspection: Unannounced, Routine Material Control and Accounti..g b

Inspector:,PA/ p. Finley Date

-

l AWitor

J 8/

Approved By:

.

. R. Creed, Acting Chief Date Safeguards Section Inspection Summary Inspection on August 18-22, 1981 (Report No. 50-282/81-16)

Areas Inspected: Material control and accountability including facility organization and operation; measurements and control; storage and internal controls; shipping and receiving; reco.ds and reports; inventory and in-ventory verification; and management of material control system. The inspection involved 24 inspector-hours onsite by one NRC inspector and was begun during the regular hours.

Results: The licensee was found to.be in compliance with NRC requirements in the seven areas examined during the inspection.

(Details Part 2.790(d) Information)

8109250405 810915'

PDR ADOCK 05000282-G P.DR '