Category:CORRESPONDENCE-LETTERS
MONTHYEARML18039A9011999-10-15015 October 1999 Forwards RAI Re 990423 Submittal of Proposed risk-informed ISI Program for Plant,Unit 3.Response Requested by 991101 ML20217E0711999-10-14014 October 1999 Grants Approval for Util to Submit Original,One Signed Paper Copy & Six CD-ROM Copies of Updates to FSAR as Listed,Per 10CFR50.4(c),in Response to ML20217D3261999-10-0808 October 1999 Responds to Re Event Concerning Spent Fuel Pool Water Temperature Being Undetected for Approx Two Days at Browns Ferry Unit 3 ML18039A8881999-10-0808 October 1999 Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors ML18039A8851999-10-0808 October 1999 Responds to Ltr of 990903 Re Event Last Year at Browns Ferry Unit 3,where Rise in Spent Fuel Pool Water Temp Went Undetected for Approx Two Days.Record Copy ML20217F7751999-10-0808 October 1999 Confirms 991006 Telcon Between T Abney of Licensee Staff & a Belisle of NRC Re Meeting to Be Conducted on 991109 in Atlanta,Ga to Discuss Various Maintenance Issues ML20217B5481999-10-0101 October 1999 Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR IR 05000259/19990051999-10-0101 October 1999 Forwards Insp Repts 50-259/99-05,50-260/99-05 & 50-296/99-05 on 990725-0904.No Violations Noted.Conduct of Activities at Browns Ferry Nuclear Facility Generally Characterized by safety-conscious Operations & Sound Engineering ML20212M1481999-09-28028 September 1999 Refers to Management Meeting Conducted on 990927 at Region II for Presentation of Recent Plant Performance.List of Attendees & Copy of Presentation Handout Encl ML18039A8731999-09-23023 September 1999 Forwards Suppl to Ser,Approving Amends 259 & 218 to Licenses DPR-52 & DPR-68 Re Approval of 14-day Allowable Outage Time for Emergency Diesel Generators.Suppl Issued to Correct Error Contained in Original SER ML20212F7751999-09-22022 September 1999 Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses ML20212D3651999-09-20020 September 1999 Forwards SE Accepting Licensee 990430 Proposed Rev to Plant, Unit 3 Matl Surveillance Program ML18039A8721999-09-10010 September 1999 Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util .Licensee Expects to Resubmit Revised Program within Approx 6 Wks ML20211Q5731999-09-0909 September 1999 Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl ML20211G6491999-08-26026 August 1999 Confirms Telcon with T Abney on 990824 Re Mgt Meeting Which Has Been re-scheduled from 990830-0927.Purpose of Meeting to Discuss BFN Status & Performance ML18039A8581999-08-23023 August 1999 Forwards Insp Repts 50-259/99-04,50-260/99-04 & 50-296/99-04 on 990613-0724 at Browns Ferry Npp.Four Violations Identified & Being Treated as non-cited Violations ML18039A8411999-08-12012 August 1999 Informs of Completion of Acceptance Review of Proposed risk- Based ISI Program for Browns Ferry Unit 3.Determined Application Suitable for Further Evaluation.Suggests That 981023 Application Be Withdrawn & New Application Prepared ML20210Q6931999-08-0909 August 1999 Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML18039A8371999-08-0606 August 1999 Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept ML20210Q4421999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit Ltr with List of Individuals to Take exam,30 Days Before Exam Date ML18039A8341999-08-0303 August 1999 Discusses Info Provided by TE Abney on 990330 Re Reanalysis of Control Room,Site Boundary & Low Population Zone Doses. Forwards Safety Evaluation,Which Supplements 980811 Safety Evaluation,Supporting New Dose Caluculations ML20210N1051999-08-0202 August 1999 Forwards SE Accepting Licensee 990326 Request for Relief from ASME B&PV Code,Section XI Requirements.Request for Relief 3-ISI-7,pertains to Second 10-year Interval ISI for Plant,Unit 3 ML18039A8291999-08-0202 August 1999 Forwards Amends 259 & 218 to Licenses DPR-52 & DPR-68, Respectively.Amends Change TS Completion Time for Required Action 3.8.1.B.4 from Existing 7 to 14 Days ML20210G8991999-07-28028 July 1999 Discusses 990726 Open Mgt Meeting for Discussion on Plant Engineering Status & Performance.List of Attendees & Presentation Handout Encl 05000296/LER-1999-004, Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B)1999-07-26026 July 1999 Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) ML20210F3031999-07-22022 July 1999 Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 ML20210G8051999-07-22022 July 1999 Discusses DOL Case DC Smith Vs TVA Investigation.Oi Concluded That There Was Not Sufficient Evidence Developed During Investigation to Substantiate Discrimination.Nrc Providing Results of OI Investigation to Parties ML20209J0251999-07-16016 July 1999 Forwards SE Which Constitutes Staff Review & Approval of TVA Ampacity Derating Test & Analyses for Thermo-Lag Fire Barrier Configurations as Required in App K of Draft Temporary Instruction, Fpfi, ML20210B2671999-07-14014 July 1999 Confirms 990702 Telcon Between T Abney of Licensee Staff & Author Re Mgt Meeting Scheduled for 990830 at Licensee Request in Atlanta,Ga to Discuss Browns Ferry Nuclear Plant Status & Performance ML18039A8131999-07-0808 July 1999 Forwards Insp Repts 50-259/99-03,50-260/99-03 & 50-296/99-03 on 990502-0612.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209E3421999-07-0707 July 1999 Confirms Arrangements Made During 990628 Telephone Conversation to Hold Meeting on 990726 in Atlanta,Ga to Discuss Plant Engineering Status & Performance ML20209E5511999-07-0707 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes TACs MA1180,MA1181 & MA1179 ML20196J3531999-06-30030 June 1999 Responds to Re Boeing Rocket Booster Mfg Facility Being Constructed in Decatur,Al.Nrc Has No Unique Emergency Planning Concerns Re Proximity of Boeing Facility to BFN 05000260/LER-1999-004, Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF1999-06-28028 June 1999 Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF ML20196G9111999-06-28028 June 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits ML18039A8111999-06-25025 June 1999 Requests Permanent Relief from Inservice Insp Requirements of 10CFR50.55a(g) for Volumetric Exam of Bfn,Unit 3 Circumferential RPV Welds,Per GL 98-05 ML20196F8741999-06-23023 June 1999 Forwards Safety Evaluation Accepting Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves 05000260/LER-1999-003, Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept1999-06-22022 June 1999 Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept ML20196F8131999-06-22022 June 1999 Forwards Rev 24 to Security Personnel Training & Qualification Plan,Per 10CFR50.54(p).Rev Withheld ML18039A8031999-06-18018 June 1999 Responds to NRC Staff Verbal Request Re TS Change TS-376, Originally Submitted on 970312, & Proposed Changes to TS to Extend Current 7-day AOT for EDGs to 14 Days ML18039A7931999-06-0101 June 1999 Provides Summary of Major Activities Performed at BFN During Scheduled Unit 2 Cycle 10 Refueling Outage ML20195D3321999-06-0101 June 1999 Informs That Cb Fisher,License OP-5525-4,can No Longer Maintain License at Plant Because of Physical Condition That Causes Licensee to Fail to Meet Requirements of 10CFR55.21 ML18039A7941999-05-28028 May 1999 Forwards Insp Repts 50-259/99-02,50-260/99-02 & 50-296/99-02 on 990321-0501.Four Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML18039A7891999-05-24024 May 1999 Informs That Oscillation Power Range Monitor Module Has Been Enabled for Current Cycle of Operation Following Unit 2 Cycle 10 Refueling Outage Which Was Completed on 990509 ML20195B9361999-05-24024 May 1999 Informs That Do Elkins,License SOP-3392-6,no Longer Needs to Maintain License as Position Does Not Require License ML18039A7911999-05-24024 May 1999 Informs That by Meeting Test Criteria Established by Test Based on Ansi/Ans 3.5-1985 (License Amends 254 & 214) power- Uprate Simulation Acceptable for Operator Training ML18039A7811999-05-21021 May 1999 Forwards SER Authorizing Util 970122 & 980612 Second 10-year Interval Inservice Insp Plan for Browns Ferry Nuclear Plant, Unit 3 & Associated Requests for Relief 3-ISI-3 & 3-ISI-6 ML15253A5091999-05-18018 May 1999 Submits NRR mgt-approved Survey Re Hydrogen Storage at Operating Nuclear Plants.Requests That Project Managers Contact Licensees to Conduct Listed Survey & That Rept Be Submitted by Close of Business on 990528 ML20206U6551999-05-14014 May 1999 Informs That ML Meek & Wd Dawson Will No Longer Need to Maintain SRO Licenses at Plant,Due to Termination of Employment,Effective 990521 ML20206Q8421999-05-10010 May 1999 Forwards Medical Info on DM Olive,License SOP-20540-2,in Response to NRC 990428 Telcon.Encl Withheld from Public Disclosure IAW 10CFR2.790(a)(6) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18039A8881999-10-0808 October 1999 Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors ML20217B5481999-10-0101 October 1999 Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR ML20212F7751999-09-22022 September 1999 Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses ML18039A8721999-09-10010 September 1999 Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util .Licensee Expects to Resubmit Revised Program within Approx 6 Wks ML20211Q5731999-09-0909 September 1999 Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl ML20210Q6931999-08-0909 August 1999 Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML18039A8371999-08-0606 August 1999 Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept 05000296/LER-1999-004, Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B)1999-07-26026 July 1999 Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) ML20210F3031999-07-22022 July 1999 Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 05000260/LER-1999-004, Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF1999-06-28028 June 1999 Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF ML18039A8111999-06-25025 June 1999 Requests Permanent Relief from Inservice Insp Requirements of 10CFR50.55a(g) for Volumetric Exam of Bfn,Unit 3 Circumferential RPV Welds,Per GL 98-05 05000260/LER-1999-003, Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept1999-06-22022 June 1999 Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept ML20196F8131999-06-22022 June 1999 Forwards Rev 24 to Security Personnel Training & Qualification Plan,Per 10CFR50.54(p).Rev Withheld ML18039A8031999-06-18018 June 1999 Responds to NRC Staff Verbal Request Re TS Change TS-376, Originally Submitted on 970312, & Proposed Changes to TS to Extend Current 7-day AOT for EDGs to 14 Days ML20195D3321999-06-0101 June 1999 Informs That Cb Fisher,License OP-5525-4,can No Longer Maintain License at Plant Because of Physical Condition That Causes Licensee to Fail to Meet Requirements of 10CFR55.21 ML18039A7931999-06-0101 June 1999 Provides Summary of Major Activities Performed at BFN During Scheduled Unit 2 Cycle 10 Refueling Outage ML18039A7911999-05-24024 May 1999 Informs That by Meeting Test Criteria Established by Test Based on Ansi/Ans 3.5-1985 (License Amends 254 & 214) power- Uprate Simulation Acceptable for Operator Training ML18039A7891999-05-24024 May 1999 Informs That Oscillation Power Range Monitor Module Has Been Enabled for Current Cycle of Operation Following Unit 2 Cycle 10 Refueling Outage Which Was Completed on 990509 ML20195B9361999-05-24024 May 1999 Informs That Do Elkins,License SOP-3392-6,no Longer Needs to Maintain License as Position Does Not Require License ML20206U6551999-05-14014 May 1999 Informs That ML Meek & Wd Dawson Will No Longer Need to Maintain SRO Licenses at Plant,Due to Termination of Employment,Effective 990521 ML20206Q8421999-05-10010 May 1999 Forwards Medical Info on DM Olive,License SOP-20540-2,in Response to NRC 990428 Telcon.Encl Withheld from Public Disclosure IAW 10CFR2.790(a)(6) 05000296/LER-1999-003, Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments1999-05-0606 May 1999 Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments ML18039A7741999-04-30030 April 1999 Forwards Proposed Rev to BFN Unit 3 RPV Matl Surveillance Program,For NRC Approval ML20206H5901999-04-30030 April 1999 Forwards Notification of Revs to BFN Unit 2 Emergency Response Data Sys Data Point Library.Revs Were Implemented on 990413 ML18039A7681999-04-27027 April 1999 Requests Relief from Specified Inservice Insp Requirements in Section XI of ASME Boiler & Pressure Vessel Code,Per 10CFR50.55a(a)(3)(i).Relief Requests 2-ISI-8 & 3-ISI-8,encl for NRC Review & Approval ML18039A7591999-04-27027 April 1999 Forwards Annual Radiological Environ Operating Rept Browns Ferry Nuclear Plant 1998. Rept Includes Results of Land Use Censuses,Summarized & Tabulated Results of Radiological Environ Samples in Format of Reg Guide 4.8 & NUREG-1302 ML18039A7651999-04-27027 April 1999 Forwards Rev 0 to TVA-COLR-BF2C11, Browns Ferry Nuclear Plant Unit 2,Cycle 11 Colr ML20206C8591999-04-23023 April 1999 Informs That Util Has Determined,Dr Bateman No Longer Needs to Maintain His License,Effective 990331,per Requirement of 10CFR55.55(a) ML18039A7581999-04-23023 April 1999 Responds to Item 4 of 981117 RAI Re TS Change Request 376 Re Extended EDG Allowed Outage Time,In Manner Consistent with RGs 1.174 & 1.177 ML18039A7541999-04-23023 April 1999 Requests Approval of Bfnp Unit 3 Risk-Informed ISI (RI-ISI) Program,Per 10CFR50.55(a)(3)(i) & GL 88-01.Encl RI-ISI Program Is Alternative to Current ASME Section XI ISI Requirments for Code Class 1,2 & 3 Piping ML20206C1241999-04-21021 April 1999 Forwards Annual Occupational Radiation Exposure Rept for 1998, IAW TS Section 5.6.1.Rept Reflects Radiation Exposure Data as Tracked by Electronic Dosimeters on Radiation Work Permits ML20205T0971999-04-15015 April 1999 Submits Change in Medical Status for DM Olive in Accordance with 10CFR55.25,effective 990315.Encl Medical Info & Certification of Medical Exam,Considered by Util to Be of Personal Nature & to Be Withheld,Per 10CFR2.790(a)(6) 05000260/LER-1999-001, Forwards LER 99-001-00,providing Details Re Inoperability of Two Trains of Standby Gas Treatment Due to Breaker Trip on One Train in Conjunction with Planned Maint Activities on Other.Ltr Contains No New Commitments1999-04-0707 April 1999 Forwards LER 99-001-00,providing Details Re Inoperability of Two Trains of Standby Gas Treatment Due to Breaker Trip on One Train in Conjunction with Planned Maint Activities on Other.Ltr Contains No New Commitments ML18039A7431999-03-30030 March 1999 Responds to NRC 990112 RAI Re BFN Program,Per GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs ML18039A7421999-03-30030 March 1999 Provides Results of Analysis of Design Basis Loca,As Required by License Condition Re Plants Power Uprate Operating License Amends 254 & 214 ML18039A7411999-03-30030 March 1999 Provides Partial Response to NRC 981117 RAI Re TS Change Request 376,proposing to Extend Current 7 Day AOT for EDG to 14 Days ML18039A7371999-03-26026 March 1999 Requests Relief from Specified ISI Requirements in Section XI of ASME Boiler & Pressure Vessel Code,1989 Edition.Encl Contains Request for Relief 3-ISI-7,for NRC Review & Approval ML18039A7331999-03-26026 March 1999 Forwards Rev 4 to TVA-COLR-BF2C10, Bnfp,Unit 2,Cycle 10 COLR, IAW Requirements of TS 5.6.5.d.COLR Was Revised to Extend Max Allowable Nodal Exposure for GE GE7B Fuel Bundles ML18039A7291999-03-22022 March 1999 Forwards Revised Epips,Including Index,Rev 26A to EPIP-1, Emergency Classification Procedure & Rev 26A to EPIP-5, General Emergency. Rev 26A Includes All Changes Made in Rev 26 as Well as Identified Errors ML20204G8471999-03-19019 March 1999 Reports Change in Medical Status for Ma Morrow,In Accordance with 10CFR55.25.Encl Medical Info & Certification of Medical Exam,Considered by Util to Be of Personal Nature & to Be Withheld from Pdr,Per 10CFR2.790(a)(6).Without Encl ML20207M0611999-03-11011 March 1999 Forwards Goals & Objectives for May 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3,radiological Emergency Plan Exercise.Plant Exercise Is Currently Scheduled for Wk of 990524 ML18039A6971999-02-22022 February 1999 Forwards Typed TS Pages,Reflecting NRC Approved TS Change 354 Requiring Oscillation PRM to Be Integrated Into Approved Power uprate,24-month Operating Cycle & Single Recirculation Loop Operation ML18039A6961999-02-19019 February 1999 Provides Util Response to GL 95-07 Re RCIC Sys Injection Valves (2/3-FCV-71-39) for BFN Units 2 & 3.Previous Responses,Dtd 951215,1016 & 960730,0315 & 0213,supplemented ML18039A6911999-02-19019 February 1999 Forwards Rev 3 to Unit 2 Cycle 10 & Rev 1 to Unit 3 Cycle 9, Colr.Colrs for Each Unit Were Revised to Include OLs Consistent with Single Recirculation Loop Operation ML20203B6031999-02-0404 February 1999 Requests Temporary Partial Exemption from Requirements of 10CFR50.65,maint Rule for Unit 1.Util Requesting Exemption to Resolve Issue Initially Raised in NRC Insp Repts 50-259/97-04,50-260/97-04 & 50-296/97-04,dtd 970521 ML18039A6741999-01-21021 January 1999 Responds to NRC Re Violations Noted in Insp Repts 50-259/98-07,50-260/98-07 & 50-296/98-07,respectively. Corrective Actions:Will Revise Procedure NEPD-8 Re Vendor Nonconformance Documentation Submission to TVA ML20199F6951999-01-0808 January 1999 Submits Request for Relief from ASME Section XI Inservice Testing Valve Program to Extend Interval Between Disassembly of Check Valve,Within Group of Four Similar Check Valves for EECW Dgs,From 18 to 24 Months ML20206P5421998-12-31031 December 1998 Discusses Preliminary Reactor & Senior Reactor Operator License Applications,Per NRC 980922 Request.Signed Applications Will Be Submitted at Least 14 Days Prior to 990208 ML18039A6581998-12-15015 December 1998 Forwards Supplements Info to Support NRC Review of Proposed TS Change TS-393,revising pressure-temp Curves to Extend Validity of Curves to 32 EFPY ML18039A6441998-12-15015 December 1998 Discusses Results of Online Testing Conducted in Preparation for Enabling Sys.Encl 1 Provides Discussion of Oscillation Power Range Monitor Sensitivity Characteristics,Proposed Setpoint Range Revs & Associated Justifications 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L5741990-09-19019 September 1990 Forwards Rev 2 to Browns Ferry Nuclear Plant Cable Issues Supplemental Rept Corrective Actions,Sept 1990. Rept Revised to Clarify Cable Bend Radius & Support of Vertical Cable & Document Resolution of Jamming Issues ML20064A6871990-09-18018 September 1990 Requests Closure of Confirmatory Order EA-84-054 Re Regulatory Performance Improvement Program ML20059L4931990-09-17017 September 1990 Provides Addl Info Re 900713 Tech Spec Change 290 Concerning Hpci/Rcic Steam Line Space Temp Isolations,Per Request ML20064A6851990-09-17017 September 1990 Responds to NRC Recommendations Re Primary Containment Isolation at Facility.Background Info & Responses to Each Recommendation Listed in Encl 1 ML18033B5171990-09-17017 September 1990 Forwards Addl Info Re 900524 Tech Spec Change 287 on Reactor Pressure Instrument Channel.Schematic Diagrams Provided in Encl 2 ML20059K2971990-09-14014 September 1990 Responds to NRC 900208 SER Re Conformance to Reg Guide 1.97, Rev 3, Neutron Flux Monitoring Instrumentation. TVA Endorses BWR Owners Group Appealing NRC Position Directing Installation of Upgraded Neutron Flux Sys ML20059H3861990-09-10010 September 1990 Forwards Corrective Actions Re Radiological Emergency Plan, Per Insp Repts 50-259/89-41,50-260/89-41 & 50-296/89-41. Corrective Action:Plant Manager Instruction 12.12,Section 4.11.3.1 Revised ML20059E1741990-08-31031 August 1990 Informs That Plant Restart Review Board & Related Functions Will Be Phased Out on Date Fuel Load Commences ML18033B5031990-08-31031 August 1990 Forwards Financial Info Required to Assure Retrospective Premiums,Per 10CFR140 & 771209 Ltr ML20059D7061990-08-28028 August 1990 Requests That Sims Be Updated to Reflect Implementation of Program to Satisfy Requirements of 10CFR50,App J.Changes & Improvements Will Continue to Be Made to Reflect Plant Mods, Tech Spec Amends & Recommendations from NRC ML20063Q2431990-08-20020 August 1990 Responds to 900807 Telcon Re Rev to Commitment Due Date Per Insp Rept 50-260/89-59 Re Electrical Issues Program ML18033B4931990-08-20020 August 1990 Suppls Response to Violations Noted in Insp Repts 50-259/90-14,50-260/90-14 & 50-296/90-14.Corrective Actions: TVA Developed Corporate Level std,STD-10.1.15 Re Independent Verification ML20063Q2441990-08-17017 August 1990 Advises That IE Bulletin 80-11 Re Masonry Wall Design Implemented at Facilities.Design Finalized,Mods Completed, Procedures Issued & Necessary Training Completed.Sims Data Base Should Be Updated to Show Item Being Implemented ML20063Q2451990-08-17017 August 1990 Provides Revised Response to Generic Ltr 89-19 Re Request for Action Concerning Resolution of USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants & Notification of Commitment Completion ML20059A4861990-08-16016 August 1990 Responds to Verbal Commitment Made During 900801 Meeting W/Nrc Re Control Room Habitability.Calculations Performed to Support Util 900531 Submittal Listed in Encls 1 & 2 ML20059A5141990-08-16016 August 1990 Provides Response to NRC Bulletin 88-008,Suppl 3 Re Thermal Stresses in Piping Connected to Rcs.Util Does Not Anticipate Thermal Cyclic Fatique Induced Piping,Per Suppl 3 to Occur in Plant.Ltr Contains No Commitment ML18033B4821990-08-14014 August 1990 Submits Revised Response to Violations Noted in Insp Repts 50-259/89-16,50-260/89-16 & 50-296/89-16.Extends Completion Dates for Commitments to 901203 ML18033B4831990-08-13013 August 1990 Responds to NRC Re Violations & Deviations Noted in Insp Repts 50-259/90-18,50-260/90-18 & 50-296/90-18. Corrective Actions:Craft Foreman Suspended for Three Days & Relieved of Duties as Foreman ML18033B4811990-08-10010 August 1990 Responds to NRC 900710 Ltr Re Power Ascension Testing Program.Four Hold Points Selected by NRC Added to Unit 2 Restart Schedule ML18033B4801990-08-0808 August 1990 Forwards Response to SALP Repts 50-259/90-07,50-260/90-07 & 50-296/90-07 for Jul 1989 - Mar 1990 ML18033B4371990-07-13013 July 1990 Forwards Corrected Tech Spec Page 3.2/4.2-45 to Util 900706 Application for Amend to License DPR-52 Re ADS ML20044B2121990-07-13013 July 1990 Clarifies Util Position on Two Items from NRC 891221 Safety Evaluation Re TVA Supplemental Response to Generic Ltr 88-01 Concerning IGSCC in BWR Stainless Steel Piping.Insp Category for Nine Welds Will Be Changed from Category a to D ML18033B4331990-07-13013 July 1990 Requests Temporary Exemption from Simulator Certification Requirements of 10CFR55.45(b)(2)(iii) ML20055F6091990-07-12012 July 1990 Provides Response to NRC Bulletin 88-003 Re Insp Results. No Relays Found to Have Inadequate Latch Engagements. Therefore,No Corrective Repairs or Replacement of Relays Required ML18033B4251990-07-10010 July 1990 Forwards Cable Installation Supplemental Rept,In Response to NRC Request During 900506 Telcon.Rept Contains Results of Walkdowns & Testing Except Work on Ongoing Cable Pullby Issue ML18033B4241990-07-0606 July 1990 Advises That Util Expects to Complete Implementation of Rev 4 to Emergency Procedure Guidelines by Mar 1991.Response to NRC Comments on Draft Emergency Operating Instructions Encl ML18033B4201990-07-0505 July 1990 Provides Basis for Closure of Generic Ltr 83-28,Item 4.5.3. Util Has Concluded That Analyses Presented in BWR Owners Group Repts Acceptable for Resolving Issue,Subj to Listed Conditions ML18033B4091990-07-0202 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-259/89-53,50-260/89-53 & 50-296/89-53.Corrective Actions: Condition Adverse to Quality Rept Initiated & Issued to Track Disposition of Deficiency in Chilled Water Flow Rates ML20043G4901990-06-14014 June 1990 Forwards Tabs for Apps a & B to Be Inserted Into Util Consolidated Nuclear Power Radiological Emergency Plan ML20043H3511990-06-14014 June 1990 Forwards Corrected Pages to Rev 15 to Physical Security Contingency Plan,As Discussed During 900606 Telcon.Encl Withheld (Ref 10CFR73.21) ML20043F4951990-06-11011 June 1990 Advises That Facilities Ready for NRC Environ Qualification Audit.Only Remaining Required Binder in Review Process & Will Be Completed by 900615 ML18033B3651990-06-0808 June 1990 Forwards Revised Page 3.2/4.2-13 & Overleaf Page 3.2/4.2-12 to Tech Spec 289, RWCU Sys Temp Loops. ML18033B3391990-06-0404 June 1990 Responds to NRC Re Violations Noted in Insp Repts 50-259/90-08,50-260/90-08 & 50-296/90-08.Corrective Actions: Individual Involved Counseled on Importance of Complying W/Approved Plant Procedures When Performing Assigned Tasks ML20043D3251990-06-0101 June 1990 Responds to NRC Re Notice of Violation & Proposed Imposition of Civil Penalty.Corrective Actions:Snm Program Action Plan Being Developed & Implemented,Consisting of Improved Training for Control Personnel & Accountability ML18033B3551990-05-31031 May 1990 Forwards Response to 891219 Request for Addl Info on Hazardous Chemicals Re Control Room Habitability ML20043C1951990-05-30030 May 1990 Forwards Response to Generic Ltr 90-04 Re Status of Implementation of Generic Safety Issues ML20043C0601990-05-29029 May 1990 Forwards Response to Violations Noted in Insp Repts 50-259/90-12,50-260/90-12 & 50-296/90-12.Util Admits Violation Re Access Control to Vital Areas,But Denies Violation Re Backup Ammunicition for Responders ML18033B3351990-05-25025 May 1990 Provides Basis for Closure of Generic Ltr 83-28,Item 4.5.3, Reactor Trip Sys Reliability. Analyses Presented in BWR Owners Group Repts Acceptable for Resolving Issues Subj to Listed Conditions ML18033B3221990-05-21021 May 1990 Forwards Rev 1 to ED-Q2000-870135, Cable Ampacity Calculation - V4 & V5 Safety-Related Trays for Unit 2 Operation, as Followup to Electrical Insp Rept 50-260/90-13 Re Ampacity Program ML18033B3101990-05-18018 May 1990 Responds to NRC Re Violations Noted in Insp Repts 50-259/90-05,50-260/90-05 & 50-296/90-05.Corrective Action: Senior Reactor Operator Assigned to Fire Protection Staff for day-to-day Supervision of Fire Protection Program ML20043A6101990-05-15015 May 1990 Forwards Rev 16 to Security Personnel Training & Qualification Plan.Rev Withheld (Ref 10CFR2.790) ML20043A4081990-05-14014 May 1990 Forwards Rev 15 to Physical Security/Contingency Plan, Consisting of Changes for Provision of Positive Access Control During Major Maint & Refueling Operations to One of Two Boundaries.Rev Withheld (Ref 10CFR73.21) ML20043A4091990-05-14014 May 1990 Forwards Rev 14 to Physical Security/Contingency Plan.Rev Withheld (Ref 10CFR73.21) ML18033B2921990-05-0909 May 1990 Provides Info for NRC Consideration Re Plant Performance for Current SALP Rept Period of Jan 1989 - Mar 1990.Util Believes Corrective Actions Resulted in Positive Individual Changes & Programmatic Upgrades ML20042F7701990-05-0404 May 1990 Provides Results of Review of Util 890418 Submittal Re Supplemental Implementation of NUMARC 87-00 on Station Blackout.Implementation of 10CFR50.63 Consistent W/Guidance Provided by NUMARC 87-00 ML20042F7401990-05-0404 May 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. TVA Will Finalize Calculations for Switch Setpoints Prior to Units Restart ML20042F3721990-05-0202 May 1990 Forwards Corrected Monthly Operating Repts for Jan-June 1989 & Aug 1989 - Jan 1990.Discrepancies Involve Cumulative Unit Svc Factors & Unit Availability Capacity Factors ML20034B2431990-04-20020 April 1990 Discusses Facility Restart Plan.Rev to Security Plan Will Be Submitted by 900515 to Allow Security Guards to Be Relocated from Drywell to Secondary Containment.Tech Spec Revs Re Fire Protection Program Will Be Submitted by 900810 ML18033B2631990-04-12012 April 1990 Forwards Response to NRC 900212 Request for Info Re Power Ascension & Restart Test Program at Unit 2.Util Has Refined Power Ascension Program to Be More Integrated & Comprehensive ML20034A8441990-04-12012 April 1990 Forwards Matl to Support Reactor & Senior Operator Licensing Exams,Per NRC 900323 Request 1990-09-19
[Table view] |
Text
__ _ . . . ._ _ _.
1 TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSCE 374ot 400 Chestnut Street Tower II February 9, 1984 U.S. Nuclear Regulatory Commission Region II ATTN: James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 1 Atlanta, Georgia 30303 :
Dear Mr. O'Reilly:
Enclosed is our response to R. C. Lewis' January 10, 1984,
- letter to H. G. Parris transmitting Inspection Report Nos.
50-259/83-40, -260/83-40, -296/83-40 regarding activities at our Browns Ferry Nuclear Plant which appeared to have been in violation of NRC regulations. We have enclosed our response to Appendix A, Notice of Violation. If you have any questions, please call Jim Domer at FTS 858-2725.
To the best of my knowledge, I declare the statements contained herein are complete and true.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Hills, nager Fuclear Licensing Enclosure ,
8403160223 840301 _
PDR ADOCK 05000259 .
8 PDR 1
-, . .=
=
RESPONSE - NRC INSPECTION REPORT NOS.
50-259/83-40, 50-260/83-40, AND 50-296/83-40 RICHARD C. LEWIS'S LETTER TO H. G. PARRIS DATED JANUARY 10, 1984 Appendix A Item A (259, 260, 296/83-40-01) 10 CFR 50.54(q) requires that nuclear power reactor licensees follow and maintain in effect emergency plans which meet the requirements of Appendix E to 10 CFR Part 50 and the planning standards of 50.47(b).
Technical Specification 6.3(A)(8) requires that detailed written procedures, including applicable checkoff lists covering Radiological Emergency Plan implementing procedures shall be prepared, approved and adhered to. Section (b)(10) of 10 CFR 50.47 requires that the licensee's emergency plans shall include information to demonstrate compliance with the following:
A range of protective actions have been developed for the plume exposure pathway EPZ for emergency workers and the public. -
Guidelines for the choice of protective actions during an emer-gency, consistent with Federal guidance, are developed and in place, and protective actions for the ingestion exposure pathway EPZ appropriate to the locale have been developed.
The Federal Guidance on protective actions to be recommended to offsite officials for general emergencies is addressed in Appendix 1 of NUREG-0654/ FEMA-REP-1, Rev.1, entitled " Criteria for Preparation and Evaluation of Radiological Emergency Preparedness in Support of Nuclear Power Plants." This guidance is clarified by IE Information Notice No. 83-28: " Criteria for Protective Action Recommendations for General Emergencies."
Contrary to the above,- the licensee has failed to incorporate the above guidance in the Implementing Procedures in that, until the response organization is mobilized (i.e., CECC and MSECC), there is no mechanism or 1
requiremont for considering protective actica recommendaticr,s otner thhn for sheltering in the plume EPZ.-
This is a Severity Level IV VJolation (Sapplcment 1) and applicable to all units.
- 1. Admission or Denial of the Alleged Violation TVA admits the violation occurred as stated.
e s '
n d. t e }>' ' L 'L
- 2. Reasons for the Violations if Admitted TVA has contended that a recommended protective action other than sheltering during the initial stage of an incident would be detrimental to the health and safety of the public in that the mechanisms at the State and local government levels will not be in place at that time and capable of handling a more extensive recommendation. Therefore, an initial recommendation to shelter the population was included in our procedures. At approximately 30 minutes into the accident the State and local goternment emergency centers and the TVA centers will be staffed at whir : time more extensive recommendations would be developed. .TVA has decisional aids available to guide the CECC director in developing a more extensive protective action recommenda-tion. However, as stated above, the decisional aid was not included in a CECC procedure.
3 Corrective Stepo Which Have Been Taken and the Results Achieved TVA has reviewed the Radiological Emergency Planning (REP) program and determined the areas in the REP and implementing procedures (IPs) which must be revised to fully comply with the intent of NUREG 0654. These steps were discussed with NRC Region II staff on January 13, 1984. ,
Development of an appropriate logic diagram for inclusion in the IPs is nearing completion.
- 4. Corrective Steps Which Will be Taken To Avoid Further Violations The following steps will be taken to comply with NUREG 0654: (1) draft necessary IP and REP changes, (2) coordinate necessary changes with States of Alabama and Tennessee, and (3) complete training of necessary personnel.
- 5. Date When Full Compliance Will be Achieved Full compliance will be' achieved March 12, 1984, when the actions in item 4 will be complett.d. ,
. Item B (259, 260, 296'/83 40-02) 10 CFR 50.54(q) requires that nuclear. power reactor licensees follow and maintain in.effect emergency plans which meet the requirements of Appendix E to 10 CF3 Part 50 and the planning standards of 50.47(b).
Section IV.B of Appendix E requires that a licensee's emergency plans shall include .information to demonstrate compliance with the following:
l l
- w ' * !$
- - M. o . . & >
The means to be used for determining the magnitude of and for continually assessing the impact of the release of radioactive material shall be described, including emergency action levels that are to be used as criteria for notification and participa-tion of local and State agencies, the Commission, and other Federal agencies, and the emergency action levels that are to be used for determining when and what type of protective measures should be considered within and outside the site boundary to protect health and safety.
10 CFR 50.47(b)(15) requires that those who may be called on to assist in an emergency be provided radiological emergency response training.
Section 4.1.1 of the Browns Ferry Nuclear Plant Emergency Plan states in part that the Site Emergency Director has the authority to recommend protective actions to offsite authorities. Section 4.1 states in part that in the event of an incident, the Shift Engineer is initially the Site Emergency Director.
Contrary to the above, Shift Engineers, initially the Site Emergency Directors, were incapable of determining when and what type of protective measures should be considered outside the site boundary to protect health .
and safety.
This is a Severity Level IV Violation (Supplement I) and applicable to all units.
- 1. Admission or Denial of the Alleged Violation TVA admits the violation occurred as stated in that the shift engineers involved misunderstood the intent of the step in the procedure (IP-5) which provides the protective action recommendation. -
- 2. Reasons for the Violation Admitted as related above, the individua]a involved were confused as to their authority as Site Emergency Director to r ecommend protective actions to offsite authorities as delineated in procedure IP-5, section 2.1.1.
3 Corrective Steps Which Have Been Taken and_the Results Achieved A: related in our letter to you dated October 25, 1984, (sic) from D. S. Kammer to J. P. O'Reilly, we committed to retrain all shift.
engineers in their protective action responsibilities as specified in Browns Ferry IP-5, section 2.1.1. This training was provided in terms of a memorandum from'the Operations Section Supervisor to all shift engineers clearly delineating their responsibilities and actions required. This training was completed on October 26, 1983. .
n .w w a
l
- 4. Corrective Steps Which Will be Taken To Avoid Further Violations The lesson plan for annual requalification training for license personnel regarding the REP was revised in pen and ink to provide emphasis on the points described above. This was done on or about October 31, 1983, and was included in the annual training for all classes conducted thereafter. This pen and ink change will be made part of the permanent lesson plan before the next annual retraining cycle anticipated to begin about September 1, 1984.
- 5. Date When Full Compliance Will Be Achieved Full compliance was achieved when the training for shift engineers was completed on October 26, 1983 Item C (259, 260, 296/83-40-03) 10 CFR 50, Appendix B, Criterion VI (as implemented by TVA's QA Topical Report TVA TR 75-1 paragraph 17.2.6 and Operational Quality Assurance Manual Part III Section 1.1) requires that measures shall be established to control the issuance of documents, including changes thereto, which ,
prescribe all activities a#recting quality. These measures shall assure that documents, including enanges, are distributed to and used at the location where the prescribed activity is performed.
Contrary to the above, several examples were noted where this requirement l was not met in that the Muscle Shoals Emergency Control Center Implementing Procedures Document (MSECC IPD) revisions were not adequately implemented.
Examples are listed:
l 1. IP-4 (Notification Procedure) was deleted October, 1982; however, IP-4 has not been removed frcm the MSECC IPD at the following locations:
- a. Browns Ferry TSC (Technical Support Center) l b. Browns Ferry File Room
- 2. IPS (Training /Dril'1 Pequirements) was deleted June 1383; however, IP-5
! has not been recoved from controlled copies of the MSECC IPD at the following locations:
- a. Muscle Shoals Emergency Control Center l
- b. ' Browns Ferry File Room l.
This is a Severity Level V Violation (Supplement I) and applicable to all units.
y l Y h
- 1. Admission or Denial of the Alleged Violation TVA admits the violation occurred as stated.
- 2. Reasons for the Violations if Admitted A filing error was made by individuals responsible for filing the revisions in the MSEC-IPD manuals.
3 Corrective Steps Which Have Been Taken and the Results Achieved Errors noted above have been corrected. A review of the MSEC-IPs was conducted to determine niether similar filing errors had been made.
None were found. Filing instructions which accompany each IP were reviewed and determined to be clear and concice.
- 4. Corrective Steps Which Will be Taken To Avoid Further Violations An effective page listing has been developed for the MSEC-IPD to facilitate the annual audit of the documents.
A verification of all controlled copies of the MSEC-IPD will be ,
conducted against the effective page listing by each recipient location by March 30, 1984. An acknowledgement of the verification will be returned to the Records Management Cor. trol Unit.
- 5. Date When Full Compliance Will be Achieved Full compliance will be achieved with receipt of all acknowledgements on or before March 30, 1984.
1 9
! 1 - g y, E -
-l$L+k. *4 DEW l$Ei, l' '
- -e . .