ML18039A733

From kanterella
Jump to navigation Jump to search
Forwards Rev 4 to TVA-COLR-BF2C10, Bnfp,Unit 2,Cycle 10 COLR, IAW Requirements of TS 5.6.5.d.COLR Was Revised to Extend Max Allowable Nodal Exposure for GE GE7B Fuel Bundles
ML18039A733
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/26/1999
From: Abney T
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18039A735 List:
References
NUDOCS 9904060137
Download: ML18039A733 (8)


Text

~ .< ~

CATEGORY 1

'I ~

REGULA'L RY INFORMATION DISTRIBUTIG SYSTEM (RIDS)

ACCESSION NBR:9904060137 DOC.DATE: 99/03/26 NOTARIZED: NO DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH. NAME. AUTHOR AFFILIATION ABNEY,T.E'. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards rev 4 to TVA-COLR-BF2C10, "BNFP,Unit 2,Cycle 10 COLR," IAW recgxirements of TS 5.6.5.d.COLR was revised to extend max allowable nodal exposure for GE GE7B fuel bundles.

DISTRIBUTION CODE:

TITLE: TVA Facilities DOSOD COPIES RECEIVED:LTR

- Routine Correspondence I ENCL 3 SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 1 1 PD2-3-PD 1 1 DEAGAZIO,A 1 1 INTERNAL: ACRS 1 1 LE CE ER 0 1 1 OGC/HDS3 1 0 RES/DE/SSEB/SES 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

(iSQmlPMI NOTE TO ALL ERIDSE RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRIBUTZON LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 8

45 ~I c'

'W p

~

Tennessee Valley Authority, Post Otfice Box 2000, Decatur, Alabama 36609 March 26, 1999 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of Docket No. 50-260 Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT (BFN) UNIT 2 CORE OPERATING LIMITS REPORT, REVISION 4 FOR UNIT 2 CYCLE 10 OPERATION In accordance with the requirements of Technical Specification 5.6.5.d, enclosed is Revision 4 to the BFN Unit 2 Cycle 10 Core Operating Limits Report (COLR). The COLR was revised to extend the maximum allowable nodal exposure for the General Electric GE7B (BPSDRB299) fuel bundles.

There are no new commitments contained in this letter. If you have any questions, please contact me at (256) 729-2636.

neer

~ ~ e Manager Lice sing and I dustry A fairs Enclosure cc: See page 9'ti04060137;'ti90326-P DR ADQCK '05000260 P pea'

~

U.S. Nuclear Regulatory Commission gage March 26, 1999 Enclosure cc (Enclosure):

Mr. Paul ED Fredrickson, Branch Chief U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street, S.W.

Suite 23T85 Atlanta, Georgia 30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Mr. L. Raghavan, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852

ll ~ I ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNIT 2'ORE

'OPERATING LIMITS REPORT (COLR) i REVI S ION 4 FOR CYCLE 10 OPERATION (SEE ATTACHED)

0