ACCELERATED DIS'GUBUTION DEMONSTF&TION SYSTEM REGULATOR iNFORMATION DISTRIBUTION TEM (RIDS)
~ f Ce ACCESSION NBRt9008150257 DOC'..DATE. 90/08/10 NOTARIZED.
NO FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee IAUTH.NAME AUTHOR AFFILIATION CARIER,P.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Responds to NRC 900710 ltr re power ascension testing program.
DISTRIBUTION CODE'OOID COPIES RECEIVED'LTRl ENCL +
SIZE'ITLE:
OR Submittal:
General Distribution NOTES:1 Copy each to: S.Black,B.WILSON DOCKET 05000260 05000260 RECIPIENT ID CODE/NAME KREBS,M.
ROSS,T.
1NTERNAL: ACRS NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E OC EG FI 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 NOTES:
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WAS'ONTACTTHE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINISFOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 32 ENCL
0 l
TENNESSEE VALLEYAUTHORITY P. 0. Box 2000 AUG g0
)ggP U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of Tennessee Valley Authority Docket Nos.
50-260 BROWNS FERRY NUCLEAR PLANT (BFN) UNIT 2 POWER ASCENSION TESTING PROGRAM REVIEW AND NRC HOLD POINTS
Reference:
NRC Letter to TVA "Browns Ferry Nuclear Plant (BFN) Unit 2 Power Ascension Testing Program Review and NRC Hold Points" dated July 10, 1990.
This letter is in reply to your July 10, 1990 letter in which NRC stated certain understandings regarding the BFN Power Ascension Testing Program.
We have reviewed this letter and have determined that it accurately, reflects the scope and content of the BFN Unit 2 Power Ascension Test Program.
The four hold points selected by NRC have been added to the Unit 2 restart schedule.
If you have any questions, please telephone me at (205) 729-3570.
Very truly yours, TE SSEE VALLEY AUTHORITY Patrick P. Carier,
- Manager, Site Licensing cc:
See page 2
>DR ggDap 900egp 9008' p
0'( Dgp0p+~
pgg 00m ~ ~g An Equal Opportunity Employer
I,'
i Q~,
I Wl
r U.S. Nuclear Regulatory Commxssi'on cc:
Ms. S.
C. Black, Deputy Director Project Directorate II-4 U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35609-2000 Thierry M. Ross, Project Manager U. S. Nuclear Regulatory Commission One White Flint, North Rockville, Maryland 20852 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
, <<)
~
J C
~
4