ML20059E174
| ML20059E174 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 08/31/1990 |
| From: | Wallace E TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9009100074 | |
| Download: ML20059E174 (2) | |
Text
<+
t e;il D 4
' g ' I,4 [
L
,4-
- TENNESSEE VALLEY AUTHORITY 9 ;,,
CH ATTANOOoA; TENNESSEE 374o1 SN 157B Lookout Place AUG 311990 EU.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.,
20555-Gentiement
'In the: Matter of
-)
Docket Nos. 50-259' Tennessee Valley Authority
)
50-260-50-296 BROWNS FERRY NUCLEAR PLANT-(BFN) - UNITS 1, 2. AND 3 --PHASE 0UT OF THE BFN RESTART REVIEW BOARD (RRB)-
The-purpose-of this letter is to inform you that the BFN RRB and its related functions wil1 be phased out when fuel load begins. TVA considers that the
~
beginning of_ fuel load is an appropriate milestone for~this phaseout since-
. work on most safety-related systems will be complete. As a result, the4 balance of the the current outage at BFN more-closely: resembles' the refueling -
. outage of an operating plant where emergent-issues are reviewed on a daily-
' basis to determine applicability;to the present outage.
lAt the time of shutdown in 1985 significant regulatory and hardware deficiencies existed at BEN.L In 1986 TVA established a special Task Force to
- verify the identification of problems and initiate actions forgresolution
-where necessary prior to restart of-BFN. 'The Task Force also_ developed a
, process and_ criteria for review of issues to determine whether'resciution of I-each issue would be required-prior to_ restart of BEN. The-BFN RRB -which is-currently a subcommittee of the Plant Operations Review Committee, was initially established'as=a subcommittee of the Task, Force to' assist in the<
discovery and review of items required for Unit-2 restart. The RRB and:the restart requirement-criteria were both described in the-Browns Ferry Nuclear Performance' Plan-(Volume III),-Revision 2, dated October-24,51988.-
Therefore, unless TVA is otherwise informed in writing, TVA will phase'out the
/
RRBLand its telated functior.s on the date fuel load commences.
Very truly yours,
- TENNESSEE ALLEY AUTHORITY E. G. Wallace, Manager Nuclear Licensing and Regulatory Affairs cc:-- See page 2 9009100074 900831 DR ADOCK 0500 9
m An Equal Opportunity Employer h[
x a
oi
> ~q ~ p+r ~, (s.
9 8,:'
Sp
,' ' ;.) g ' L iryfm j
'a yi~
l -JD c.
j}hjp:+ t*g'.[
- 't 2- :-
TT_e.
l[*4 h^U'.Sk Nuclear Regulatory Commission-I 1
i ba;,
?,,,
- p vi y~ ',,'
cc:(,Ms.yS.:C. Black',, Deputy Director
'ProjectLDirectorate II-4
'!?
<:U.S. Nuclear Regulatory Commission l
j
,One White Flint.. North- '
- 11555 Rockville Pike, W
.il Rockville,. Maryland 20852 m
NRC Resident Inspector Browns Ferry' Nuclear Plant
-Route 12,-Box 637-Athens, Alabama!L35609-2000 f
Thierry M.'Ross,= Project Manager.
U. S. Nuclear Regulatory Commission L
One. White Flint, North C
'l1555 Rockville Pike R
.lRockville,-Maryland 208.
4 a
'Mr. B. A. Wilson, Project Chief
~U.S. Nuclear. Regulatory Commission Region II
'101 Marietta Street, NW, Suite 2900
' Atlanta Georgia-30323
[
'f.
-I
~j i
l n
r.
.i
.t
+-
x l'
-i Y, -
d i
a: 's l
.2
',it 4
e i
()lk
';n:
i 1
i;
, ' N;;,;' '
I j
,,~,.,
,