i TENNESSEE VALLEY AUTHORITY 4
CHATTANOOG A, TENNESSEE 374ot i
5N 157B Lookout Place AVG 161990 U.S. Nuclear Regulatory Commission ATTN Document Control Desk Washington, D.C.
20555 Gentlement In the Matter of'
)
Docket Nos. 50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - C0i4 TROL ROOM HABITABILITY - HAZARDOUS CHEMICALS (TAC NOS. 00155, 00156, AND 00157)
This letter is in response to a verbal commitment made by TVA in the TVA/NRC meeting on control room habitability, which was held in White Flint, Maryland on August 1, 1990. During this meeting, TVA committed to docket the calculations which were performed to support TVA's May 31, 1990 s ubmi t tal '.
These calculations are provided as Enclosures 1 and 2.
Futitre revisions to these calculations, if required, will be available at the BFN site for Staff review.
4 It is TVA's understandin6 that submittal of these calculations completes TVA's actions which were requested in the Staff's October 21, 1988 Safety Evaluation and in the December 19, 1989 request for additional information. TVA requests the issuance of a Supplemental Safety Evaluation Report to document the closure of this issue.
There are no commitments contained in this letter.
If you have any questions, please contact Patrick P. Carier, Manager of Site Licensing, at (205) 729-3566.
Very truly yours, TENNESSEE VALLEY AUTHORITY h E. G. Wallace, Manager Nuclear Liet:nsing and Regulatory Affairs Enclosures cc: See page 2 9008230084 900816 PDR ADOCK 05000259 i --
P PDC
\\
An Equal Opportunity Employer
- g&,,,
R ?pL i
9 '
[
L c
l Q
. U.S.' Nucl ear Regulatory Connission g
7).
4
'I cc (Enclosures):
i Ms. S. C. Black, Deputy Director Project Directorate 11-4 i'
U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike, Rockville, Maryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12 Box 637 Athens, Alabanm-- 35609-2000 l
Thierry M. Ross, Project Manager U. S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 208 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II r
101 Marietta Street, NW, Suite 2900 Atlanta, Georgia '30323
)
1 i -
t i
ENCLOSURE 1 i
i BROWNS FERRY NUCLEAR PLANT T0XIC BARGE STUDY i
1 1 =.
l '.
)
r i,-
l 1..