Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/85-24 & 50-328/85-24.Addl Info Re Ice Removal & Surveillance Testing Requested Per 850913 Telcon
ML20137V740
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/25/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8510040118
Download: ML20137V740 (2)


See also: IR 05000327/1985024

Text

1

,

.

[/

September 25, 1985

Tennessee Valley Authority

/ ATTN: Mr. H. G. Parris

Manager of Power and

Engineering (Nuclear)

6N11 B Missionary Ridge Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT: REPORT NOS. 50-327/85-24 AND 50-328/85-24

Thank you for your response of September 6,1985, to our Notice of Violation

issued on August 7,1985, concerning activities conducted at your Sequoyah

facility. We have evaluated your response to Violation 50-328/85-24-02 and found

that it meets the requirements of 10 CFR 2.201. We will examine the implemen-

tation of your corrective actions during future inspections.

Regarding your response to Violation 50-328/85-24-03, you state that the ice

buildup on June 10, 1985, was removed the same day and that a surveillance

instruction was performed to document that the intermediate deck doors were free

of ice. Our evaluation indicates that Maintenance Request A-553690 was generated

on June 10, 1985, to control the repair of insulation tape and removal of ice

and/or moisture buildup. It is our understanding that the maintenance request

documented completion of these activities on June 16, 1985. Since your response

indicates that ice removal and surveillance testing occurred within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of

finding the June 10, 1985 ice buildup, please provide in a supplemental response

specific explanation and documentation to justify your position that the

requirements of the limiting condition of operation of Technical Specification 3.6.5.3 were met. This request was discussed during a telephone call between

Mr. P. Wallace of your staff and Mr. S. Weise and Mr. B. Debs of the Region 11

staff on September 13, 1985.

We appreciate your cooperation in this matter.

Sincerely.

Original Signed by

Roger D. Walker

Roger D. Walker, Director

Division of Reactor Projects

cc: (See page 2)

h

G

D [

i

I* % Sol

. .

Tennessee Valley Authority 2 Septenter 25, 1985

cc: 4. L. Abercrombie, Sequoyah Nuclear

, Plant Site Director

"P. R. Wallace, Plant Manager

vt. W. Whitt, Chief, Nuclear Safety

, Staff

4. L. Williams, Jr., Supervisor

, Licensing Section

4. B. Kirk, Compliance Staff

Supervisor

v1. E. Wills, Project Engineer

bec: #NRC Resident Inspector

Document Control Desk

State of Tennessee

RII R [ Ril R RI

BDebs:pph CJul an A o Sweise DVerr 111

09/ft/85 09//l/85 09//') 85 09/p/85 09/; 85

.