1
[/
,
.
September 25, 1985
Tennessee Valley Authority
/ ATTN: Mr. H. G. Parris
Manager of Power and
Engineering (Nuclear)
6N11 B Missionary Ridge Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT: REPORT NOS. 50-327/85-24 AND 50-328/85-24
Thank you for your response of September 6,1985, to our Notice of Violation
issued on August 7,1985, concerning activities conducted at your Sequoyah
facility. We have evaluated your response to Violation 50-328/85-24-02 and found
that it meets the requirements of 10 CFR 2.201.
We will examine the implemen-
tation of your corrective actions during future inspections.
Regarding your response to Violation 50-328/85-24-03, you state that the ice
buildup on June 10, 1985, was removed the same day and that a surveillance
instruction was performed to document that the intermediate deck doors were free
of ice. Our evaluation indicates that Maintenance Request A-553690 was generated
on June 10, 1985, to control the repair of insulation tape and removal of ice
and/or moisture buildup.
It is our understanding that the maintenance request
documented completion of these activities on June 16, 1985. Since your response
indicates that ice removal and surveillance testing occurred within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of
finding the June 10, 1985 ice buildup, please provide in a supplemental response
specific explanation and documentation to justify your position that the
requirements of the limiting condition of operation of Technical Specification 3.6.5.3 were met.
This request was discussed during a telephone call between
Mr. P. Wallace of your staff and Mr. S. Weise and Mr. B. Debs of the Region 11
staff on September 13, 1985.
We appreciate your cooperation in this matter.
Sincerely.
Original Signed by
Roger D. Walker
Roger D. Walker, Director
Division of Reactor Projects
cc:
(See page 2)
h
[
D
G
i
I*
% Sol
.
.
Tennessee Valley Authority
2
Septenter 25, 1985
cc: 4. L. Abercrombie, Sequoyah Nuclear
, Plant Site Director
"P. R. Wallace, Plant Manager
vt. W. Whitt, Chief, Nuclear Safety
, Staff
4. L. Williams, Jr., Supervisor
, Licensing Section
4. B. Kirk, Compliance Staff
Supervisor
v1. E. Wills, Project Engineer
bec: #NRC Resident Inspector
Document Control Desk
State of Tennessee
RII
R
[
Ril
R
RI
BDebs:pph
CJul an
A
o
Sweise
DVerr 111
09/ft/85
09//l/85
09//') 85
09/p/85
09/; 85
.