IR 05000348/1988020

From kanterella
Revision as of 19:36, 10 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-348/88-20 & 50-364/88-20
ML20151Y971
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/15/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
References
NUDOCS 8808290113
Download: ML20151Y971 (1)


Text

, ,

,

,- .

o

AUG 151988

.

Alabama Power Com)any ATTN: Mr. W. G. Mairston, III Senior Vice President-Nuclear Operations P. O. Box 2641 Birmingham, AL 35291-0400

'

Gentlemen:

SUBJECT: REPORT NOS. 50-348/88-20 AND 50-364/88-20 1988, to our Notice of Violation Thank issued onyou for 28, June your1988, response of July concerning act28,ivities conducted at your Farley facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.20 We will examine the implementation of your corrective actions during future inspection Weahpreciateyourcooperationinthismatte

Sincerely,

"

Alan R. Herdt, Chief Engineering Branch Division of Reactor Safety cc: B. M. Guthrie, Executive Vice President D. N. Morey General Manager -

NuclearPlant J. D. Woodard, Vice President -

Nuclear Generation J. W. McGowan, Manager-Safety Audit and Engineering Review S. Fulmer, Supervisor-Safety Audit and Engineering Review bec: NRC Resident Inspector DRS Technical Assistant E. Reeves, Project Manager, NRR State of Alabama RI I RIlf P urnett:sh e Dance 08/&/88 TJah/

08/ /88 08/iW88 8808290113 880815 l PDR ADOCK 05000348 0 G PNU 3gej