ML20245F197

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/89-14 & 50-364/89-14 on 890611-0710.No Violations or Deviations Noted.Matter Re Apparent Excessive Work Hours for Licensed Operators Will Be Discussed W/Util at 890731 Meeting in Region II Ofc
ML20245F197
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/26/1989
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20245F200 List:
References
NUDOCS 8908140202
Download: ML20245F197 (2)


See also: IR 05000348/1989014

Text

_

-_

__

._

-

-

<

,

'

-

.

t

p i;m

s

, .

' JUL 2 61989

^

'

.

lJ

li

i

i

7

Docket Nos.: 50-348, 50-364

License Nos. NPF-2, NPF-8

Alabama Power Company

ATTN:

W. G.:Hairston, III,

.

Senior:Vice President, Nuclear.

l-

.

Operations '

'40-Inverness Center Parkway.

'

P. O. Box 1295-

Birmingham, AL 35201-

re 'lemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/89-14 AND 50-364/89-14

This' refers to the Nuclear Regulatory Commission (NRC) ' inspection conducted

by G. F. Maxwell on June 11 through July 10, 1989. The inspection included a

review of activities authorized.for your Farley facility. At the conclusion of-

.the ' inspection, the! findings were discussed with those members of your staff

'

identified in the enclosed inspection report.

Areas examined during the inspection are identified .in the report.

Within

thr.w areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and. observation :of

-

activities in progress.

Your attention is directed to the unresolved items. identified in the-inspection

report. .These matters will be pursued during future inspections. The matter

Lconcerning apparent' excessive work hours for licensed operators will 'be

discussed with your staff during.a meeting which is scheduled to be' conducted

'in Region II Office on July 31, 1989.

No other violations or deviations were

identified.

'In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be pla:ed in the NRC Public Document Room.

Should you-have any questions concerning this letter, please contact us.

Sincerely,

Original signed by

Hugh C. Dance (for)

David M. Verre111, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

(See page 2)

8908140202 890726

C

1

I \\

ADOCK 05000340 s[j

PDR-

PNV

-Q-

j

__ _

,

..

- - - , . -

l

Alabama Power Company,

2

JUL 2 61999

m

Enclosure:

NRC Inspection Report

cc w/ encl:

B. M. Guthrie, Executive Vice President

R. P. Mcdonald, Executive Vice President

J. D. Woodard, Vice President, Nuclear

Support

D. Morey, General Manager Nuclear

Plant

J. W. McGowar., Manaper-Safety Audit

and Engineering Review

S. Fulmer, Supervisor-Safety

Audit and Engineering Review

State of Alabama

bec w/ encl:

NRC Resident Inspector

Document Control Desk

RII:DR,

RII:DRP

LModenos

FCantrell

07/g/89

07/g89

4