September 24, 1990
Docket Nos.- - 50-348, 50-364
Alabama Power Company
ATTN: Mr. W. G. Hairston, III
Senior Vice President
Nuclear Operations
40 Inverness Center Parkway
-P. O. Box 1295
Birmingham, AL' 35201
Gentlemen:-
SUBJECT:
NRC INSPECTION REPORT NOS. 50-348/90-24, 50-364/90-24
This_ refers to the sinspection conducted by G. A. Hallstrom'of this office on-
August 27-31, 1990.
The-inspection included a revies of activities authorized
for your Farley facility.
At the conclusion of the inspection, the_ findings
were discussed with those members of your staff identified 'in the report.
- Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of.
H
activities in progress.
Within the scope of the inspection, . violations or deviations were . not
identified.
In accordance 'with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosure will be placed-in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original signed by
Caudie A. Julian
Caudie A. Julian, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
(See page 2)
90101'20025 900924
PDR- ADOCK 05000348
-Q
g
,
'
, . .
'
-
..
,
labama Power Company
2
September 24, 1990
Enclosure:
NRC Inspection Report
cc w/ enc 1:
E. L. Moore
l
Manager, Licensing
Alabama Power Company
l
P. O. Box 1295
!
Birmingham, AL 35201
l
R. P. Mcdonald
Executive Vice President
Alabama: Power. Company
i
P. O. Box 1295
. Birmingham, AL 35201
J. D. Woodard
i
Vice President
Nuclear Farley Project
Alabama Power Company
!
P. O. Box 1295
=l
!
Birmingham, AL 35201
!
i
0. N. Morey
!
.
'
General Manager
l
Farley Nulear Plant
,
1
Drawer-470
l
l
Ashford, AL 36312
-S. Fulmer, Supervisor
j
Safety Audit and Engineering Review-
.]
Farley Nuclear Plant
l
Drawer 470
.l
.Ashford, AL 36312
Louis B. Long, General Manager
l
Southern Company Services, Inc.
!
P. 0. Box 2625
'j
Birmingham, AL 35202
-
i
'Claude Earl Fox, M.D.
l
State Health Officer
'
State Department of Public Health
State Office Building
.
Montgomery, AL 36130
!
h
Chairman
Houston County Coninission
Dothan, AL 36301
bec w/ encl:
(See page 3)
,
,,
,
__. -
- - - . _ _ _ _ _ .
- .
.
,
'- .
.:
e
l
Alabama Power Company:
3
. September 24, 1990-
9
.
bec w/ encl:
Steve Hoffman, Project Manager, NRR
Document Control Desk
i
,
)
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
1
l
Route 2,-Box 24
e
l
Columbia, AL 36319
j
DRP Section Chief
,
.
..
T
t
RII:0R
RII: ),
RII:DRP
,
GAHallstrom:tj
ABelisle
FCantrell
_094 9 /90
09/g/90