ML20059N348

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/90-24 & 50-364/90-24 on 900827-31.No Violations or Deviations Noted
ML20059N348
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/24/1990
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20059N349 List:
References
NUDOCS 9010120025
Download: ML20059N348 (3)


See also: IR 05000348/1990024

Text

_ _ _ _ _ _ ._-_-

_,

4 ,

- '

., _ .,

i

September 24, 1990

Docket Nos.- - 50-348, 50-364

License Nos. NPF-2, NPF-8'

Alabama Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President

Nuclear Operations

40 Inverness Center Parkway

-P. O. Box 1295

Birmingham, AL' 35201

Gentlemen:-

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/90-24, 50-364/90-24

This_ refers to the sinspection conducted by G. A. Hallstrom'of this office on-

August 27-31, 1990. The-inspection included a revies of activities authorized

for your Farley facility. At the conclusion of the inspection, the_ findings

were discussed with those members of your staff identified 'in the report.

- Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of. H

activities in progress.

Within the scope of the inspection, . violations or deviations were . not

identified.

In accordance 'with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosure will be placed-in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original signed by

Caudie A. Julian

Caudie A. Julian, Chief

Engineering Branch

Division of Reactor Safety

Enclosure: (See page 2)

90101'20025 900924

PDR- ADOCK 05000348

-Q PDC

g ,

'

, . .

' -

.. ,

labama Power Company 2

September 24, 1990

Enclosure:

NRC Inspection Report

cc w/ enc 1:

E. L. Moore l

Manager, Licensing  :

Alabama Power Company l

P. O. Box 1295  !

Birmingham, AL 35201 l

R. P. Mcdonald

Executive Vice President  ;

Alabama: Power. Company i

P. O. Box 1295

. Birmingham, AL 35201

J. D. Woodard i

Vice President  ;

Nuclear Farley Project  :

Alabama Power Company  !

P. O. Box 1295 =l

!

Birmingham, AL 35201

! i

0. N. Morey

.  !'

General Manager

l Farley Nulear Plant ,

1 Drawer-470 l

l Ashford, AL 36312

-S. Fulmer, Supervisor j

Safety Audit and Engineering Review- .]

Farley Nuclear Plant l

Drawer 470 .l

.Ashford, AL 36312

Louis B. Long, General Manager l

Southern Company Services, Inc.  !

P. 0. Box 2625 'j

Birmingham, AL 35202 -

i

'Claude Earl Fox, M.D. l'

State Health Officer

State Department of Public Health

State Office Building .

Montgomery, AL 36130  !

h

Chairman

Houston County Coninission

Dothan, AL 36301

bec w/ encl: (See page 3) ,

,,

,

__. - - - - . _ _ _ _ _ .

- . .

,

'- . .:

e

l

Alabama Power Company: 3 . September 24, 1990-

.

9

bec w/ encl:  :

Steve Hoffman, Project Manager, NRR

Document Control Desk i

,

) NRC Resident Inspector

U.S. Nuclear Regulatory Commission 1

l Route 2,-Box 24 e

l

Columbia, AL 36319 j

DRP Section Chief ,

.

..

T

t

RII:0R RII: ), RII:DRP

,

GAHallstrom:tj ABelisle FCantrell

_094 9 /90 09/g/90 09/p/90

,

__ __ _ _ _ - _ . _ _ . _ _ _ _ _ - _ - . - . _ . - _ .