ML20245K557

From kanterella
Jump to navigation Jump to search
Advises That 890601 Rev 16 to Emergency Plan Consistent W/ Provisions of 10CFR50.54(p) & Acceptable
ML20245K557
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/09/1989
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
References
NUDOCS 8908210064
Download: ML20245K557 (2)


Text

-, -

  • l- ophCIW AUG 0 91989 Alabama Power Company ATTN: ' Mr. W. G. Hairston, III Senior Vice President Nuclear Operations-40 Inverness Center Parkway P. O. Box 1295 Birmingham, AL 35201 Gentlemen:

SUBJECT:

J. M. FARLEY NUCLEAR PLANT EMERGENCY PLAN REVIEW, REVISION 16 DOCKET NOS. 50-348 AND 50-364 We have completed our review of Revision 16 to your Farley Emergency Plan, dated June 1, 1989. Based on our review, we have concluded that the changes meet the planning. standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.

Please be reminded that 10 CFR 50.54(q) requires that proposed changes which decrease the effectiveness of your Emergency Plan shall not be implemented without application to and' approval by the Commission. However, changes may be made without Commission approval if such changes do not decrease the effectiveness of.the Plan, and if the Plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix-E to 10 CFR Part 50. If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of Section V, Appendix E to 10 CFR Part 50.

Should you have any questions regarding this letter, please contact Mr. William H. Rankin of our staff at 404-331-4486.

Sincerely, OHGINAL SIGNED BY DOUGLAS M. COLLINS Douglas M. Collins, Cnief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards cc: (See page 2)

)

8908210064 890809 l R"  ! 888* _ _. _ _

ysc

p Alabama Power Company 2 I

cc: B. M. Guthrie, Executive Vice President '

D. N. Morey, _ General Manager -

Nuclear Plant J. D. Woodard, Vice President -

Nuclear Generation J. W. McGowan, Manager-Safety Audit and Engineering Review S. Fulmer, Supervisor-Safety Audit and Engineering Review State of Alabama bcc: NRC Resident Inspector E. Reeves, Project Manager, NRR Document Control Desk Ril:D SS RII:DRSS RII: RP

- Eb7/q

,Je WRankin %C@antrell 8/5/89 8/f/89 8/f/89

- _ _ _