Forwards Insp Repts 50-348/89-18 & 50-364/89-18 on 890731-0804 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790 & 73.21)
ML20247G951
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/12/1989
From: Cline W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20247G955 List:
References
NUDOCS 8909190175
Download: ML20247G951 (2)


See also: IR 05000348/1989018

Text

_

- _ __ _

L,-l SAFt. GUARDS INFORMATION

.

l SEP 12199s

.. 3

Docket Nos. 50-348, 50-364 I

License Nos. NPF-2, NPF-8

Alabama Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President

Nuclear Operations

. pTCU/; Egg f702.%gfgY

EE40vrp

40 Inverness Center Parkway

P. O. Box 1295 ,

Birmingham, AL 35201

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-348/89-18AND50-364/89-18)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by W. Tobin on July 31 - August 4,1989. The inspection included a review

of activities authorized for your Farley facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed Inspection Report.

The inspection findings indicate that certain activities appeared to violate

NRC' require"1ents. The violation, references to pertinent requirements, and

elements to be included in your response are described in the enclosed Notice

of Vio'lation. .

In accordance with 10 CFR 2.790(d) and l'0 CFR 73.21, safeguards activities ard

security measures are exempt from public: disclosure. Therefore, the enclosures

to ** sis letter with the exception of the report cover page, which presents a

nonexempt summary, will not be placed in Jthe NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget a.; required by the

Paperwork Reduction Act of 1980, Pub.: L. No.96-511.

'

Should you have any questions concerning this letter, please contact us.

.

Sincerely,

I. OpiGINAL SfGNED BY

W.lLLIAM E. CLINL

'~

ii'1Yiam E. Cline, Chief d

f0

.

Nuclear Materials Safety and

Safeguards Branch

Division of Radiation Safety ' I

and Safeguards

Enclosures: (See page 2) '

, ,

FA!T. GUARD 5 !NtTR4 A hav ' ' L 0241--'

8909190175 890912

PDR ADOCK 05000348

O . PDC _ __ __ _ ___---__-___ -- _ - -

--_ - - - - -

.

<

,

SAFEGU ARDS INFORMATION

Alabama Power Company 2 SEP 121989

Enclosures:

1. Notice of Violation

(Safeguards Information)

2. NRC Inspection Report

(Safeguards Information)

cc w/encls:

B. M. Guthrie, Executive Vice President

D. N. Morey, General Manager -

Nuclear Plant

J. D. Woodard, Vice President -

Nuclear Generation

J. W. McGowan, Manager-Safety Audit

and Engineering Review

S. Fulmer, Supervisor-Safety

Audit and Engineering Review

cc w/ Inspection Summary:

State of Alabama

bec w/encls:

NRR/DRIS/SB

bec w/Inspectfon Summary:

E. Reeves. Project Manager, NRR ,

Document Control Desk (RIDS IE04), 016 i

NRC Resident Inspector

RII:DRSS RII: SS RII:DRP @lh-

l

JfklS

W{Sunsberry:ser bin FCantrell

M l

i

V

uire

09/1/89 /l/89 09/~) /89 09/ /89

. m .,,, - . ,, .. _

o, m-

wl4 *

f ., h j '(' f [ '

_

c.=.a. w-,uuew~ u

- - - . . _ . _ . - . . . . - _ - _ _ _ _ - - - - - _ - _ _ - - . - _ - _ _