Forwards Summary of 900913 Mgt Meeting Re Emergency Preparedness Program & Onsite Technical Support Ctr
ML20058B402
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/19/1990
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
References
NUDOCS 9010300176
Download: ML20058B402 (15)


Text

<-

o, 001 1 9 190 Docket Nos. 50-348, 50-364 License Nos. NPF-2, NPF-8 Alabama Power Company ATTN: Mr. W. G. Hairston, III Senior Vice President Nuclear Operations 40 Inverness Center Parkway P. O. Box 1295 Birmingham, AL 35201 Gentlemen:

SUBJECT:

MANAGEMENT MEETING

SUMMARY

- FARLEY This letter refers to the Management Meeting held at your request on September 13, 1990.

This meeting concerned activities authorized for your Farley facility.

The issues discussed at this meeting related to your Emergency Preparedness Program and, specifically, to the function of your onsite Technical Support Center Emergency Operations Facility, Corporate Emergency Operations Center, and the overall adequacy of your on site emergency response facilities to accommodate an expanded NRC site team in the event of a major emergency.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2 Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely.

ORIGINAL SIGNED BY l

9TEWART D. EBNETER Stewart D. Ebneter Regional Administrator

Enclosures:

1.

Management Meeting Summary 2.

List of Attendees 3.

Handout-cc.w/encls:

(Seepage 2) 9010300176 901019 PDR ADOCK 05000348 F

PDC d5 0

mj

j i

~

Alabama Power Company 2

e cc w/encis:'

l B. L. Moore

' Manager, Licensing Alabama Power Company P. O. Box 1295 Birmingham, AL 35201 R. P. Mcdonald Executive Vice President Alabama Power Company P.=0. Box 1295 Birmingham, AL 35201 J. D. Woodard Vice President

}r

_ Nuclear Farley Project Alabama Power Company

= P. 0. Box 1295 Birmingham, AL 35201 D. N. Morey General Manager.

Farley Nuclear. Plant Drawer 470-Ashford, AL 36312 t=

S. Fulmer Supervisor

-Safety Audit and Engineering Review Farley Nuclear Plant-Drawer 470 Ashford, AL 36312 3,

Louis B. Long, General Manager -

-Southern Company Services,-Inc.

P. 0. Box:2625 Dirmingham, AL 35202 Claude Earl: Fox, M.D.

State Health Officer p

- State Department of Public Health it

_ State Office Building Montgomery, AL _ 36130-Chairman g; r Houston Cou'nty~ Commission--

Dothan, AL~ 36301 bec.w/ enc 1s:

(See.page3) k a_...

A k...

1 Alab'ama Power Company 3

1

[

i h'

bec w/ enc 15: ~

I Steve Hoffman, Project Manager, NRR Falk Kantor, NRR DRP Section Chief Document Control Desk NRC Resident' Inspector l

F U.S.. Nuclear Regulatory Consnission Route 2. Box 24 i

Columbia, AL 36319

n f

e t'

i r

'f c

\\

t e

i f

y L '

i,

h t

4 I

y 6

[q,

_.iu 1

i:

'RIIiDR S R g:

'Ril RI1-A-

RSS' 1 WRankin~ -

ollins JPStohr; FCantrell J

ioan 9/g/90/-

9/g90:

9 0-9/g90.-

90'

~!

ru s

p

)

-[

Y

~71 ;

4

i ENCLOSURE 1 MEETING

SUMMARY

A Management Meeting was held in the Region 11 Office on September 13, 1990, to discuss the overall Emergency Preparedness (EP) Program at Farley Nuclear Plant as well as plans for the NRC full-participation exercise planned at Farley on October 24, 1990.

The licensee's presentation addressed perceived strengths of the overall EP program at Farley, improvenents in EP that had been undertaken in the past year, and the emergency response functions conducted at the onsite Technical Support Center (TSC) as well as the Corporate Energency Operations Center (CEOC).

In particular, they noted that their response organization was trained and functioned as a team.

Other strengths addressed during this neeting 'are listed in the Attachnent.

NRC representatives stated that the licensee s Plan commitnents to fully staff their TSC and Emergency Operations Energency(EOF) during an emergency in two hours and four hours, respectively, facility.

were not consistent _ with existing regulatory guidance.

The Regional Administrator expressed his view that the Farley TSC was performing both TSC and E0F functions during the four-hour period after an accident.

Additional NRC staff connent included a question of the licensee as to why the TSC/ EOF functions and activation tines at other sites with a somewhat similar situation were not acceptable at farley, Licensee representatives responJed that in their view their mode of emergency operation was superior to that of other sites with respect to their specific situation.

No agreenent was reached with the licensee regarding facility activation times.

However, it was agreed that, for the near term, to include the October 24, 1990 full-scale emergency exercise, no changes to the existing Farley Emergency Plan would be required.

The NRC and the licensee agreed to meet again shortly after the October exercise to continue efforts to resolve the subject issue.

Additional discussion concerned the adequacy of Farley emergency response facilities to accommodate a full NRC site presence pursuant to the planned Farley/NRC joint participation in' the full-scale energency exercise on October 24, 1990.

Detailed discussion of the needs for space and telephone equipment in each facility ensued with the -licensee expressing an intent to accommodate NRC needs in each case if possible.

Additional.ly, a concent.

1 received by NRC staff,from a Statelof Georgia representative regarding adequacy

[

of _ technical data ' received from Farley during a recent rehearsal emergency.

- exercise was provided1to the licensee with the recommendation that the licensee pursue resolution directly with the. individual involved.

No connitments were made by the licensee at the meeting.

I

n l:

[

1:

~

ENCLOSURE 2 LIST DF ATTENDEES A1,abama Power Company J. D. Woodard, Vice President - Nuclear Generation D. N. Morey, General Manager - Nuclear y

C. D. Nesbitt, Technical Manager B. D. McKinney, Jr., Manager, Nuclear Engineering and Licensing L

K. W. McCracken. Manager - Regulatory, Engineering and Environmental Services.

Southern Company Services S. C. Ewald, Manager Environmental Services, Southern Company Services F. M. Jcssup Emergency Preparedness Coordinator Nuclear Regulatory,,Copi,ssj,on S. D. Ebneter, Regional Administrator J. L. Milhoan Deputy Regional Administrator

- J. P. Stohr. Director, Division of Radiation Safety and Safeguaros (DRSS)

E._W. Merschoff, Deputy Director Division of Reactor Projects (DRP)

D. M. Collins, Chief. Emergency Preparedness and Radiological Protection Branch, DRSS

.F. S. Cantrell, Chief. Projects Section IB, DRP W. H. Rankin,' Chief. Emergency Preparedness Section, DRSS A. T. Boland. Emergency Response Coordinator DRSS

(:

r 1

4 t'

J a,

tt (U

i

ATTACllMENT p*s L ' "'.. -

L-STRENGTHS r

- - THREE-WAY ROTATION ON-CALL o

SITE 21 PROJECT 9 EMERGENCY ASSIGMENTS PARALLEL NORMAL ASSIGNMENTS

- FUNCTIONAL ON-CALL ORGANIZATION OFFLOADS SITE ORGANIZATION RAPIDLY TSC/EOC PERFORMS ALL INTIIAL EMERGENCY

- FUNCTIONS 7

EXPERIENCED PERSONNEL j

5 t v i

i

l e'

IMPROVEMFsNTS PRACTICE DRILLS COMMUNICATIONS DEDICATED PHONES IN TSC AND EOF - STATES SYSTEMS TRAINING - STATE AND LOCAL USING ENN FOR INITIAL NOTIFICATIONS DEDICATED PHONE - RE-ENTRY TEAM ANALYZED EOF FUNCTIONS STREAMLINED STAFFING STREAMLINED TURNOVER, REVISED PROCEDURES ADDED ON-CALL SUPPORT PERSONNEL l

REDUCED NOISE LEVELS IN TSC L

CLASSIFICATION TRAINING i

f J

I' L.

~

FARLEY NUCLEAR PLANT TSC ON CALL STAFF l

EMERGENCY DIRECTOR EMERGENCY DIRECTOR ASSISTANT OPERATIONS MANAGER MAINTENANCE MANAGER I

MECHANICAL SUPPORT I&C SUPPORT PGS SUPERVISOR GPTS SUPPORT ELECTRICAL SUPPORT q

>1 u

.a FARLEY NUCLEAR PLANT TSC ON CALL STAFF l

TECHNICAL MANAGER REACTOR ENGINEER SYSTEMS ENGINEER COMPUTER SUPPORT ENVIRONMENTAL SUPERVISOR EARLY COUNTY LIAISON HOUSTON COUNTY LIAISON HEALTH PHYSICS MANAGER CHEMISTRY SUPERVISOR QC SUPPORT LICENSING SUPPORT SAER SUPPORT L:

i

--ri w-

FARLEY NUCLEAR PLANT TSC FUNCTIONS L

PLANT OPERATIONS b

i-OPERATIONAL ACCIDENT ASSESSMENT EMERGENCY DIRECTION AND CONTROL FIRE FIGHTING

  • SITE ACCESS CONTROL A.ND SECURITY EMERGENCY RESPONSE GUIDELINES
  • = FUNCTION TRANSFERRED TO EOF UPON 1

ARRIVAL OF-CORPORATE STAFF.

1

s.

.i FARLEY NUCLEAR PLANT TSC FUNCTIONS NOTIFICATION AND COMMUNICATION

  • STATE
  • LOCAL
  • FEDERAL
  • CORPORATE
  • HARD-COPY OFF SITE COMMUNICATIONS
  • = FUNCTION TRANSFERRED TO EOF UPON

-ARRIVAL OF CORPORATE _ STAFF.

FARLEY NUCLEAR PLANT TSC FUNCTIONS PLANT SYSTEM ENGINEERING EMERGENCY REPAIR CORRECTIVE ACTION RE-ENTRY COORDINATION G

  • = FUNCTION TRANSFERRED TO EOF UPON

. ARRIVAL OF CORPORATE STAFF.

FARLEY NUCLEAR PLANT TSC FUNCTIONS RADIOLOGICAL ACCIDENT ASSESSMENT

  • OFF-SITE DOSE ASSESSMENT SUPPORT OF OPERATIONAL ACCIDENT ASSESSMENT
  • OFF-SITE SURVEYS
  • ON-SITE (OUT OF PLANT) SURVEYS IN-PLANT SURVEYS POST ACCIDENT SAMPLING CHEMISTRY AND RADIOCHEMISTRY ANALYSIS
  • METEOROLOGICAL MONITORING
  • PROTECTIVE ACTION -RECOMMENDATIONS
  • = FUNCTION-TRANSFERRED TO FOF UPON ARRIVAL OF-CORPORATE STAFF.

FARLEY NUCLEAR PLANT TSC FUNCTIONS PROTECTIVE ACTIONS (OCCUPATIONAL SAFETY)

PERSONNEL ACCOUNTABILITY ACCESS CONTROL l

HP COVERAGE-FOR REPAIR PARTIES h

PERSONNEL MONITORING PERSONNEL DOSIMETRY RESCUE OPERATIONS l

FIRST AID u

  • = FUNCTION TRANSFERRED TO EOF UPON ARRIVAL OF-CORPORATE STAFF.

I 1'

FARLEY NUCLEAR PLANT TSC FUNCTIONS PLANT OPERATIONS OPERATIONAL ACCIDENT ASSESSMENT EMERGENCY DIRECTION AND CONTROL FIRE FIGHTING

  • SITE ACCESS CONTROL AND SECURITY EMERGENCY RESPONSE GUIDELINES NOTIFICATION AND COMMUNICATION
  • STATE
  • LOCAL
  • FEDERAL
  • CORPORATE
  • HARD-COPY OFF SITE COMMUNICATIONS RADIOLOGICAL ACCIDENT ASSESSMENT
  • 0FF-SITE DOSE ASSESSMENT SUPPORT OF OPERATIONAL ACCIDENT ASSESSMENT
  • OFF-SITE SURVEYS
  • ON-SITE (OUT OF PLANT) SURVEYS IN-PLANT SURVEYS POST ACCIDENT SAMPLING CHEMISTRY AND RADIOCHEMISTRY ANALYSIS
  • METEOROLOGICAL MONITORING
  • PROTECTIVE ACTION RECOMMENDATIONS L

PLANT SYSTEM ENGINEERING EMERGENCY REPAIR CORRECTIVE ACTION RE-ENTRY COORDINATION PROTECTIVE ACTIONS (OCCUPATIONAL SAFETY)

PERSONNEL ACCOUNTABILITY ACCESS' CONTROL L

HP COVERAGE FOR REPAIR PARTIES PERSONNEL MONITORING PERSONNEL DOSIMETRY RESCUE OPERATIONS l

FIRST AID -

1 l

  • = FUNCTION TRANSFERRED TO EOF UPON ARRIVAL i

OF CORPORATE STAFF, u

.