Forwards Insp Repts 50-348/90-28 & 50-364/90-28 on 900911-1012.No Violations or Deviations Noted
ML20058B139
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/16/1990
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Hairston W
Alabama Power Co
Shared Package
ML20058B144 List:
References
NUDOCS 9010290412
Download: ML20058B139 (3)


See also: IR 05000348/1990028

Text

-

ffhdd

'

3

'

00i'161990

.

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

ATTN:

W. G. Hairston, 111

Senior Vice President

Nuclear Operations

40 Inverness Center Parkway

P. O. Box 1295

Birmingham, AL 35101

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-348/90-28 AND 50-364/90-28

This refers to the inspection conducted by G. F. Maxwell of this office on

September 11 through October 12, 1990. The inspection included a review of

activities authorized for your Farley facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

' identified in the enclosed report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincergly,

I

'fyn p,,

g.

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

NRC Inspection Report

'cc.w/ enc 1:

(See page 2)

n-

'

901029041; 901016

{DR

ADOCK0500g8

%

frof

i

.

f-

.

.

. ,

00716g

'

{

Alabama Power Company

2

s

I

cc w/ enc 1:

B. L. Moore

F

Manager, Licensing

Alabama Power Company

P. O. Box 1295

Birmingham, AL 35201

R. P. Mcdonald

,.

' Executive Vice President

'

- Alabama Power Company

[

P. O. Box 1295

Birmingham, AL 35201

J. D. Woodard

Vice President

Nuclear Farley Project

Alabama Power Company

P. O. Box 1295

Birmingham, AL _35201

D. N. Morey

General Manager

Farley Nuclear Plant

Drawer 470

Ashford, AL' 36312

S. Fulmer, Supervisor-

Safety Audit and Engineering Review

Farley Nuclear Plant

Drawer 470

Ashford, AL 36312-

- Louis B. Long . General Manager

Southern Company Services, Inc.

P. 0~ Box 2625

.

. Birmingham, AL 35202

s

Claude: Earl Fox, M.D.

"

State Health Officer

State Department of Public Health

State.0ffice Building

'

,

l

- Montgomery, AL '36130

p

Chairman-

- Houston County Commission

'

Dothan,.AL 36301:

bec w/ enc 1:

(Seepage'3)

.

.x

.-

<.

.

. .

-

e;

c 3, . :

.

.

.

.

OCT 3 o 1990

- -

Alabama Power Company

3

"

.

~

bec w/ enc 1:

-

Steve Hoffman, Project' Manager, NRR

Document' Control Desk

-DRP Section Chief

'NRC Resident Inspector

U.S. Nuclear Regulatory Comission

j i.

Route 2, Box 24

Columbia; AL 36319

.-

-

<

f'

<

l

,

!r

!

p'

i-

k.

L

i

.

i

-

-

V

,

'

i:

Rll:DRP

Ril:DRP-

'RWp b-

.FCa

11 ~.

.

10/ /90-

-10/j

90-

,e

,

C-.