ML20210A774

From kanterella
Revision as of 19:56, 4 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submits List of Portions of Draft SER Transmitted to Date by Teledyne.Portions Focus on Comanche Peak Review Team Program Plan,Design Adequacy Program Plan & Const Adequacy Program Plan.Listed Info Will Be Provided Later
ML20210A774
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/23/1985
From: Cragin J
TELEDYNE ENGINEERING SERVICES
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Shared Package
ML20209E570 List:
References
FOIA-86-657 6410-31, NUDOCS 8512310153
Download: ML20210A774 (1)


Text

_

7 ,

p , . .

,x

, WTELEDYNE-ENGINEERING SERVICES 130 SECOND AVENUE WALTHAM. MASSACHUSETTS 02254 (617)8943350 TWX(710)324 7508 December 23, 1985 6410-31 a,

Mr. Vince Noonan, Project Director . p.i '

Comanche Peak Project '

U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Mail Stop P-234 Washington, D.C. 20555

Dear Mr. Noonan:

Following your memo of November 26 copied to our D.F. Landers, TES has responded on schedule and has transmitted this date the following " draft" portions of the developing SER.

Appendix i -

Staff evaluation of CPRT Program Plan. Section 1-4, (transmitted to V.S. Noonan). Remaining summary and reference sections will be provided later Appendix A - Staff evaluation of CPRT Design ' Adequacy Program Plan.

Sections 4.1, 4.4, 4.6 (new), 4.7, (was 4.6), 5.4, 5.5,- (transmitted  !

to Jo Knox). Remaining sections are not TES primary responsibility Appendix B -

Staff evaluation of the CPRT Construction Adequacy Program Plan.

Sections 4.1, 4.3, 4.5, 4.6, 4.7, 4.8, 5.3, 5.4, and 6.0, (transmitted to E. Tomlinson). Remaining sections are being prepared by others.

We look forward to working with your staff in developing this report.

Very truly yours, TELEDYNE ENGINEERING SERVICES n Q. Cragin, P.E.

Manager,Projcc.: Administration JQC:sig cc: D.F. Landers. TES folg 4 U,7 J.A. Flaherty, TES Nh? a-

,M hb l

ENGINEERS AND METALLUHGISTS i7

&_ _ _ _ _ . _ _ _ _ . _ - _ _