Forwards Technical Rept TR-6710-3, Comanche Peak Response Team Results Rept Rev 1 for Issue Specific Action Plan Isap I.d.2 Guidelines for Administration of QC Inspector Tests
ML20235U705
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/16/1987
From: Malonson J
TELEDYNE ENGINEERING SERVICES
To: Charemagne Grimes
NRC OFFICE OF SPECIAL PROJECTS
Shared Package
ML20235U707 List:
References
6710-11, NUDOCS 8707220562
Download: ML20235U705 (1)


Text

-. _.

WTELEDYNE '

ENGINEERING SERVICES 130 SECOND AVENUE WALTHAM, MASSACHUSETTS O2254 9195 (67 90 335 TWX D 324-7508 6710-11 Mr. 'C. I. Grimes Director of Comanche Peak Project Division Office of Special' Projects U.S. Nuclear Regulatory Commission Mail Stop EWW-302A Washington, D.C. 20555

Subject:

Technical Evaluation of ISAP I.d.2, Results Report Revision 1, Guidelines for Administration of QC Inspector Tests.

Transmitted herewith is a copy of the TES Technical Report TR-6710-3 for the Subject Results Report.

TES has not received a copy'of 'the applicant's response to the request for additional information, therefore the response was not considered in the TES evaluation covered in this report.

Very truly yours, TELEDYNE ENGINEERING SERVICES 1&

  • James H. Malonson (4 I}L{f x Senior Project'QA Specialist l JHM/ mar cc: D. F. Landers ,

Project 6710 File j USNRC Distribution:

Mr. Cliff Hale Task Manager Mr. James Lyons Project Officer Ms. Debbie Corley Technical Assistance Program Manager Ms. Helen Hagey Contract Administrator 8707220562 870716 = " 'GINEERS AND METALLURGISTS ftQ g PDR ADOCK 05000445 A PDR jl

s, L

l l . -

l l <

l l

"#PTELEDYNE ENGINEERING SERVICES ECHNICAL REPORT TR-6710-3 TECHNICAL EVALUATION REPORT - -

ON COMANCHE PEAK RESPONSE TEAM RESULTS REPORT REVISION 1 FOR '

! ISSUE SPECIFIC ACTION PLAN ISAP I.d.2 GUIDELINES FOR ADMINISTRATION OF QC INSPECTOR TESTS -

JULY 16, 1987 OCK h ho$h45 PDR e