MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl ML20195H9221998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant ML20127F5051992-10-21021 October 1992 Discusses 921020 Telcon W/R Feldman of Thermal Science,Inc (TSI) Re 921018 Rept Made by Util That Less than 10 of 2,000 Conduit Sections Provided by TSI Showed Signs of Delamination & Some Had Occluded Porosity in Cross Sections IR 05000445/19920181992-07-0606 July 1992 Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property ML20057B4601992-05-15015 May 1992 Discusses Telcon W/Rm Dow Re Plant ML20057B1881991-04-18018 April 1991 Discusses 910405 Telcon W/Alleger Re Security Sys at Plant ML20029A4071991-02-13013 February 1991 Forwards Correspondence sign-off Sheet for LER 90-036-01. Suppl Acceptable for Submittal to NRC ML20057B1781991-02-0505 February 1991 Discusses Allegations Made by M Dow Re Scores of Security, Safety Violations & Allegation of Sexual Harassment at Plant ML20065K0251990-11-0707 November 1990 Forwards Amend 2 to Tech Specs,Modifying Tables 2.2-1 & 3.3-3 Re Neutron Flux Meter Setpoints 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl ML20195H9221998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128H2931993-02-10010 February 1993 Staff Requirements Memo Re Emergency Motion to Stay Issuance of low-power Operating License.Staff Issued Order Denying Motion ML20128E4301993-02-0505 February 1993 Staff Requirements Memo Re 930129 Affirmation/Discussion & Vote on SECY-93-016 Discussing FRN Concerning Proposed Issuance of OL ML20062J1941993-02-0303 February 1993 Board Notification 93-001:notifies of 930202 Emergency Motion to Stay Issuance of low-power OL Requesting Listed Items Including Issue Order Staying Issuance of License ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant ML20127F5051992-10-21021 October 1992 Discusses 921020 Telcon W/R Feldman of Thermal Science,Inc (TSI) Re 921018 Rept Made by Util That Less than 10 of 2,000 Conduit Sections Provided by TSI Showed Signs of Delamination & Some Had Occluded Porosity in Cross Sections IR 05000445/19920181992-07-0606 July 1992 Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property ML20057B4601992-05-15015 May 1992 Discusses Telcon W/Rm Dow Re Plant ML20057B1881991-04-18018 April 1991 Discusses 910405 Telcon W/Alleger Re Security Sys at Plant 1999-08-27
[Table view] |
Text
m 8 .
. e*
.y= /** " %', UNITED STATES
, ,7 g ,h NUCLEAR nEGULATORY COMMISSION WASHING TON. D. C. 20t55
..... m,.
MEMORANDUM FOR: V. Noonan, Project Director Comanche Peak Project FROH: L. Shac, Engineering Group Leader Comanche Peak Project SubdECT: PRELIMINARY C0H4ENTS ON CCMANCHE PEAK RESPONSE TEAM PROGRAM PLAN ,
A few days ago we received the Comanche Peak Response Team (CPRT) Progran Plan from TUGC0. The Program Plan is organized in a series of issue-specific action plans and discipline-specific action plans to address the concerns raised by various external sources. In additicn, the CPRT Program Plan contains the consideration of self-initiated evaluations to be perforuec in the areas of design adequacy, quality of construction and QA/QC adequacy.
Obviously, it will take a long time to do a thorough review of this voluminous documentation. However, the following is the first reaction after brcwsing through the document. It is recommended that a series of working meetings be arranged to talk to various technical groups prior to meeting with TUGC0 management. These meetings are needed to clarity the Program Plan
( approach to resolution of the issues in the areas of piping and pipe supports, Cable tray / Conduit supports, and structural disciplines.
t l
l l
5 18 " 7
$l//
8702100083 870129 1
PDR FOIA '
GARDE 86-657 PDR
,' . " V. Noonan .
~
CPRT PROGRAM PLAN FIRST CONSIDERATION COMMENTS
- 1.
S We consider the Program Plan to contain the essential elements required to accomplish CPRT objectives. The Applicant is to be commended for submitting a comprehensive plan in an attempt to address all the external issues and to describe a self-initiated evaluation intended to assume overall plant safety. The Plan is well organized and structured to accommodate revisions as will surely occur during Plan implementation.
While we expect the overall goals and objectives (once agreed to) to remain fixed, many other aspects of this Program Plan are dynamic and hence, we expect this to be a "living" document. Finally, the Plan indicates to us a commitment on the part of the Applicant to resolve staff concerns and demonstrate overall plant safety.
- 2. LICENSING C0411THENTS On several occasions the CPRT makes reference to changes to FSAR commitments. It should be noted that we can feel more comfortable when,
' the FSAR change is one which has previously been approved for other newly-licensed nuclear plants. Any FSAR change request that is unique to CPSES will be more difficult to justify. Regardless, the request for licensing commitment changes should be minimized and be used only as a last resort.
- 3. INDEX FOR ALL EXTERNAL SOURCE ISSUES In the objective of the overall Program Plan and the Design Adequacy
, Program Plan, the CPRT commits ho resolving the issues raised by the external sources (i.e., CAT, SIT, TRT, SRT, IAP and ASLB. hearings). A review of the individual action plans does not indicate that a mechanism is in place to assure that all of these specific concerns are addressed.
The CPRT should include as part of the overall Program Plan a cross-reference index that specifies in which action plan each of the specific external source concerns will be addressed.
. ~ V. No: nan '
- 4. COORDINATION OF ALL EFFORTS We are concerned that the impleaentation of the complex nature of the tasks. outlined in the Program Pl'an may be difficult due to the depth and breadth of the program scope. The CPRT-should pay particular attention to the. necessity of assuring proper coordination between all related efforts. The complexities inherent in such a program plan make it I
imperative to provide appropriate controls to assure nothing " falls through the cracks."
S. CA/QC ISSUES ,
The CPRT Program Plan addresses the QA/QC issues identified in the staff '
- January 1985 letter concerning the TRT QA/QC findings. It presently does not adoress other QA/QC concerns including the interrelationship between the remaining TRT groups (i.e., mechanical piping, civil structural, electrical,andtesting)asdetailedinAppendixPofSSERfil. Since l- , the CPRT review of SSER #11 will not be completed until August 1, 1965, we cannot provide a definitive review-and comments on this portion of the Program Plan at this time.
l .
6.. QUALIFICATION 0F MANAGEMENT i
We are concerned that the Senior Review Team (SRT) management does not appear to have sufficient technical experience in certain disciplines, especially in the civil / structural and mechanical / piping areas. It is essential that the SRT, which has been charged with the overall responsi--
bility for the development and implementation of the CPRT program, be staffed with personnel capable of carrying out this charge and assuring that all commitments are met.
L I
1 l
V. Noonan ~
7.. WESTINGHOUSE-INTERFACES WITH CLASS 1 SUPPORTS NOT CESIGNED BY WESTINGHOUSE A. In the scope of the Piping and Pipe Support Action Plan the CPRT' excludes pipe supports designed by Westinghouse. However, in the scope of the Stone and Webster Engineering Corporation (SWEC)
Qualification Program, SWEC commits to the requalification of 100% of all large bore supports including those for Class 1 systems. This is an inconsistency since Westinghouse was responsible for most of the design and analysis of Class I large bore supports. The CPRT should 4
clarify if %EC is responsible for qualifying Class 1 supports designed by Westinghouse or by others.
B. If SWEC is committing to requalifying only those Class 1 large bore supports designed by o'ther than Westinghouse, then the CPRT should ensure that the interface between Westinghouse and SWEC is
- functioning properly. This is required to account for any effects that pipe support deficiencies have on the existing Class 1 piping analyses (i.e., reduced pipe support stiffness).
- 8. ACTIVE VALVE ISSUE INFORMALLY REPORTED BY TUGC0 Recently, a new issue was identified by telephone from TUGC0 concerning active valves. This issue stated that active valves were designed to 4-accident conditions not in accordance with the FSAR comitment. .The CPRT should include-this issue in the Program Plan.
- 9. CABLE TRAY / CONDUIT SUPPORTS On the surface, the program appears more like a research program than one
. intended to resolve licensing issues. The Program Plan proposes to conduct tests to justify the use of higher system damping valves, use of refined modeling methods to compute more realistic loads, and to develop new acceptance criteria based on system performance and functionality.
l The Program Plan does not clearly define how Unit 2 cable tray / conduit I
h
-m,---. . , , - - ~ + . - - - . , - . -
g V. Noonan '
supports are assessed and modified as needed. However, the Program Plan:
implies that the above mentioned criteria in general will not be used for Unit 2 items. Therefore, we see the necessity for conducting working
, meetings with the CPRT and its consultants prior to comenting on the adequacy and acceptability of the program.
10.- PIPING AND PIPE SUPPORT REANALYSIS A. In response to an inquiry during the CPRT meeting with the NRC on June 14, 1985, the CPRT stated that the supports on large bore piping would be reanalyzed as part of SWEC's qualification program. However, the SWEC Qualification Program indicates that Class 1, 2 and 3 large bore pipe supports will be requalified using revised loads from newly-analyzed piping. The CPRT should clarify whether the Class 1, 2, and 3 supports will be reanalyzed as previously stated or requalified as indicated in the Program Plan.
B. Also in the same meeting the CPRT stated that they would meet the existing FSAR licensing commitments. However, the Prugram Plan in various instances makes reference to changes in FSAR comitments that may be requested by the CPRT. This apparent discrepancy should be clarified by the CPRT and more specif t:: details should be included in the Program Plan for any known FSAR comitment changes.
C. We are concerned that previously identified external source issues such as SIT, IAP, ASLB hearings and staff concerns are still unre-l solved by the Applicant. The CPRT should assure that all external I source issues are identified in the SWEC scope of responsibility. We request that a working meeting with SWEC be established to review their procedures and design criteria to assure that all external source issues are identified and understood.
i i
l l
E
., , . Y,'No: nan -C-
.. 11. CYGNA INTERFACE We note that many external source issues had been identified by CYGNA during ths four phases of the IAP. These issues are categorized as cable' tray / conduit supports concerns and some piping and pipe support concerns.
The CPRT should provide CYGNA the opportunity to review the Program Plan to assure that all CYGNA issues have been properly addressed.
- 12. NEW ALLEGATIONS i
We are presently assessing new allegations that were not included in SSERs #8, 10 and 11. Since the assessment of these allegations will be presented in a future SSER, the CPRT should make provisions to include their response to this future SSER in the Program Plan.
- 13. SELF-INITIATED EVALUATION SCOPE - STRUCTURAL DISCIPLINE The Program Plan does not seem to provide a basis for the selected scope with respect to structural discipline evaluation. A detailed aiscussion of the basis should be provided. On the first reaction basis, we feel' that the proposed scope may not be broad enough to be representative of the CPSES Category 1 structures. A working meeting with the CPRT l
covering this area should be arranged.
- 14. EXCLUSION OF WESTINGHOUSE ACTIVITIES While we agree with the Applicant's conclusion concerning the exclusion of Westinghouse activities from CPRT consideration, the rationale supporting this conclusion should be developed by the Applicant and included in the Program Plan. ,
t L'. Shao, Engineering Group Leader Comanche Peak Project
! cc: D. Eisenhut L. Chandler D. Jeng J. Calvo R. Masterson S. Treby i D. Landers B. Saffel C. Trammel l S. Hou C. Hofmayer l
f, CPRT PROGRAM PLAN f.: GENERAL SUpttARY OF FORTHCOM*
REQUESTS FOR ADDITIONAL INFORMATIO.I FROM THE SYSTEMS /0PERATIONAL GROUP COMANCHE PEAK TASK FORCE
- 1. Establish action plans for all External Source Issues (presently only TRT andCYGNAIAPissuescovered)
- 2. Justify the exclusion of the NSSS vendor activities from the evaluation of the design adequacy for CPSES.
- 3. Consider infonnation regarding the potential root cause and generic implications associated with those issues which have been raised and subsequently clos'ed by the External Source that raised the issue.
- 4. . Describe the overview role of the CPRT concerning the implementation of f CPTRT - recommended corrective actions by the CPSES project.
- 5. Expertise of the CPRT teams and persons responsible for making technical decisions for modifying and creating action plans as result of conclusive l determinations of root causes, potential generic implications and safety significance.
l
{ gyn - S'6 65'?
B h1 l
7
=. .
s' .
j, I.
~
- b. ..
- 6. .The proposed initial scope for the Design Adequacy Program Plan for the mechanical systems, and electrical, instrumentation and control systems j does not have sufficient breadth and minimum depth.
- 7. Design Specific Action Plans for mechanical systems, electrical, instrumentation and control systems need to be augmented to include engineering walkdown of as-built.
- 8. The Construction Adequacy Program Plan need to be augmented to address Appendix P of the TRT QA/QC SSER-11 concerning the interrelationship of QA/QC concerns iden'tified by the TRT groups.
- 9. Provide the basis and explanation for establishing categories of homogeneous populations of safety-related hardware constructed using similar work activities.
- 10. Justify using the CPSES Quality Assurance Program (questioned by the TRT) i to qualify personnel involved in the implementation of l
l construction-related electrical ISAPs.
- 11. There are approximately 125 RAI at this time from the Systems / Operational Group.
i 1
l
_- - - _ - . - . - - _ _ _ - , , _- . - _ - _ .---