ML20210B978

From kanterella
Jump to navigation Jump to search
Trip Rept of 851202-03 Visit to Tera Ofcs in Bethesda,Md to Audit Documentation Supporting Initial Level of Homogeneity for Design Activities Review Procedure DAP-21 That Will Be Implemented to Validate Homogeneity
ML20210B978
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/16/1986
From: Knox J
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To: Marinos E
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Shared Package
ML20209E570 List:
References
FOIA-86-657 NUDOCS 8602110471
Download: ML20210B978 (11)


Text

u y. ,,

-.a 1.. . .

t .

. /

January 16, 1986 o

9 MEMDRANDUM FOR: E. C. Marinos Acting Manager Systems / Operational Group Comanche Peak Project FROM: J. L. Knox Review Support Group Systems / Operational Group Comanche Peak Project

SUBJECT:

TRIP REPORT - DESIGN ACTIVITY HOMOGENEITY i DOCUMENTATION AUDIT, COMANCHE PEAK PROJECT On December 2 and 3,1985 representatives of the NRC visited the TERA offices in Bethesda, Maryland to audit the documentation TERA had on file to support an initial level of homogeneity for Design Activities. The scope of the Design Adequacy Program (DAP) plan stated that each Design Activity exhibits five elements of homogeneity. These elements are:

1 2))Similardesignmethodology, Similar design criteria, 3

4 ))Singleorganization,andConsistent design process control procedures throughou

5) Consistent design interfaces throughout the design effort.

Additionally, the audit was to review the occupants of Design Activities and discuss the process for selecting occupants to be inspected and review the procedure (DAP-21) that will be implemented to validate homogeneity for each Design Activity.

During the audit the following discussions took place and documents were reviewed:

1. An introductory discussion pertaining to the documentation that will be reviewed was held.
2. The G4H calculation and specification lists cross-referenced to the applicable Design Activities was reviewed as the documentation basis for occupants of design activities.
3. A discussion was held within the Mechanical discipline group pertaining to the homogeneity element of methodology. No documentation in the form of technical design instructions or standards were offered for review. The discussion revolved around the rationale that the Design Activities were of such a narrow scope that a variation in methodology could not exist.

pa t).96-bSl s

s

=

oc@ HD h r1 ^

. _ _v w - - - , , 5

\ '

\ @

- ^ ^

E. C. Marinos . -

It was further discussed that the design criteria contained methodology; but, no documentation was presented in support of this contention.

l' 4. TERA presented correspondence from G8H that showed a consistent project organization over the design period. These documents were reviewed. This infomation was also presented as the basis for consistent project design t interfaces.

t

, 5. In the area of design process control, corporate G8H procedures for design control (DC-1 thru -13) and project control (PC-1 thru -9) were reviewed.

These procedures set forth prescriptive instructions for the project to develop certain technical design documents (i.e. Design Descriptions and Interfaces). These procedures also control the approach to perfoming calculations. At the time of this audit TERA did not present any of the items that were developed by these procedures for the Comanche Peak Project.

6. A discussion was held concerning the utilization of the DAP procedure (DAP-21) for validation of homogeneity for each Design Activity. Assuming

'an initial level of homogeneity'the procedure requires the selection of five occupants of each Design Activity, equally spaced in time (over the design period). These samples will be scanned for consistency of crite-ria, methodology and application of design control procedures. The other two elements of homogeneity (organization, interfaces) will be validated on a progranaatic basis. If homogeneity cannot be validated the Design Activity will be broken down into smaller Design Activities that possess homogeneity or there will be 1005 inspection of the occupants.

7. A discussion was held concerning the process for selecting occupants for inspection. The discussion entailed a concern for triviality, e.g. if the occupant within the AFW system presents a trivial case, another more complex occupant would be selected from another system.
8. TERA declared their intent to exclude prequalified design agents and suppliers, such as Westinghouse from the HDA review process. The basis for this position was that these agents have demonstrated satisfactory paper controls and QA/QC practices in other projects. This should com-

. prise satisfactory product. These selections would be documented in an Engineering Evaluation.

9. A brief discussion was held concerning the situation where Westinghouse has design responsibility for a safety system. The responsibility is typical to what an A/E has for approving the adequacy of construction documents by Proof-of-Design calculations. It was indicated that on Comanche Peak. Westinghouse has this type of responsibility for the Chemical and Volume Control system (CVCS) and the Residual Heat Removal system (RHR). The question posed to TERA during the discussion was should i

i

-~ ---~n_ ,

, e ' - .,,

o :.=- .~ .

s :o .

.
.s-E. C. Marinos 3-not Westinghouse in this instance be considered as an "Other" design agency for separate inspection or if not, should not there be a documented explanation of why not. It was noted that this needed to be pursued further.  ;
10. In the electrical engineering and control and instrumentation disciplines a number of design information documents were sighted exhibiting methodo1-ogy. These covered subjects on cable sizing, generator short circuit current contribution, circuit breaker selection, instrumentation and control diagram development, and generator loss of field protection.

Also, several electrical engineering calculations were performed by use of computer programs. The related computer program user guides or instruc-tions were not sighted.

11. In the civil and structural discipline a number of 6&H design documents were presented which appeared to exhibit methodology.

/5 John L. Knox

, Review Support Group Systems / Operational Group Comanche Peak Project cc: V. Noonan C. Tramell A. Vietti. Cook L. Shao J. Calvo E. Tomlinson J. Knox O!STRIBUTION:

Central Files Reading Files JC lR5G:50  :  :  :  :  :  :

ME :JKnox:

1 ATE : 1/14/86  :  :  :  :  :  :

0FFICIAL RECORD COPY

\ A Ahckt1 11/ 5/86 PAGE 1 U. S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8507170447 Trio root of 850208 site visit to inspect unused holes in ~

cable tray support flanges,to locate cantilevered horizontal plate attached to containment, liner plate & to inspect & pather info on elastic joint. filler.

FROM LIPINSKI,R.E. Comanche Peak Project (TechnjcalRev)ewTeam)

TO: Comanche Peak Project (Technical Review Team)

, ISSUED: 850305 AVAIL: CF 400 DOCUMENT TYPE: CNTRIP FPAC 8507170436A TASK , 00I0: FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE 67966 188 67966 191 N!DS: D026L 8507170447 XA Trio root of o'02085 site visit to inspect unused holes in cable tray support flanges,to locate cantilevered horizontal plate attached to containment liner plate & to

~

inspect & gather info on elastic joint filler. ,

FROM LIPINSKI,R.E. Comanche Peak Project (Technjcal Review Team)

TO: Comanche Peak Project (Technical Review Team)

I ISSUED: 850305 AVAIL: POR 4po. DOCUMENT TYPE: CNTRIP FPAC: 8507170447 QASK ODIO: FORMAL REPT NO:

00twEh0 05000445 05000446 FICriE s 67966 188 67966 191 RIOS: D026L

,9 8508220466 Trio rept of 650805-09 site visit ce, quality of const &

( QA/uc acequacy program plan,S&W oicina & p)pe support g analysis progran,Ebasco cable tray b conduit reenalysis

& integrated safety assessment program.

. % FROM: HAUGHNEY,C.J. Comanche Peak Project (Technical Review Team) l h 70 NOONAN,V.S. Comanche Peak Project (Technical Review Team) s h ISSUED: 850815 AVAIL: CF . Soo. DOCUMENT TYPE: CNTRIP FPAC: 8508220462A TASK: 00!Os FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 68032 203 68032 207 RIOS: 0026(

8508220466 XA Trio rept of 650805-09 site visit re, quality of const &

QA/QC adequacy program plan,SAW oipina & pipe support analysis progran,Ebasco cable tray E conduit reenalysis

& integrateo safety assessment program.

FROM: MAUGHNEY,C.J. Comanche Peak Project (Techn) cal Review Team)

TO: NOANAN,V.S. Comanche Peak Project (Technical Review Team)

ISSUED /850815 AVAIL: PbR 500 DOCUMENT TYPE: CNTRIP FPAC: 8508220466 TASK ODIO: FORMAL REPT NO:

DOCKET No: 05000445 05000446 FICHE: 34338 162 34338 16e R!uS: D0261 10452 Trio root of 650910-12 site visit ce Integrated Safety N Assessment Pronram, Topic 1.o.1 & impact of SSER 11 on electrica) 6 instrumentation action items identified in SSER 7.Eutt interview root enc 1 T04LINSON,E.8 A{

s TO: FROM: CALVO,J.A.

Comanche Peak Project (Techn.ical Revjew Team)

Comanche Peak Project (Technical Review Team) 4 ISSUED: 851025 AVAIL: CF Soo. DOCUMENT TYPE: CNTRIP FPAC: 8510310452 Q TASK 0010: FORMAL REPT NO:

\ 00CKET NO: 05000445 05000446 FICHE: 68131 027 68131 031 HIDS: 0026(

\/ [c3_n-;iw&ff Bhy 6 L/N Ib Fo s A 9 to- lo E 9

,a. _. .

)

11/ 5/86 PAGE 2'  ;

i U. 3. NUCLEAR REGULATORY COMMISSION t DCS PARTIAL RECORD FORMAT REPORT 8510310452 XA Trio root of 850910-12 site visit ce Integrated Safety Assessment Program,To Ic 1.u.1 t, impact of SSER 11 on, electrical , ,

& instrumentation action items identified in SSER 7. Exit FROM: TO4LINSON,E.8 interview rest encl. ,

TO: CALVO,J.A. Comanche Peak Project (TechnicalRev)ewTeam)

ISSUED: 851025 AVAIL: POR Comanche Peak Project (Technical Review Team)

TASK: Sos.

0010 DOCUMENT TYPE: CNTRIP FPAC: 8510310452 DOCKET NO: 05000445 FORMAL REPT NO:

FICHES 34346 285 34346 286 HIDS: 0026C 8511040496 Trio rest of 831129-30 site visit statistical analysis of beckfit inso program.

FROM: ABRAMSON,L.

TO: Management Support 8 ranch CLARKeJ.W. Management Support Branch ISSUED: 831220 AVAIL: POR sos.

TASK -

DOCUMENT TYPE: CNTRIP FPAct 85110401434 CGIO:

FORMAL REPT NO:

, . - DOCKET NO: 05000000 05000445 05000446 FICME:

33474 277 33474 280 HIDS:

'l,f8511110361 t Trio, rent of 650827-29 site visit w/ut)1 & contractors re witnessing of Unit 1 caele tray supports walkdown in g

progress & collection of info concerning new allegations.

If%FROM: LIPINSKI,R.E. .

& TO: Comanche Peak Project (Technical Rev)ew Team)

J ISSUED: 851024 AVAIL Comanche Peek Project (Technical Review Team)

  • TASK

.CF. to.

0010 DOCUMENT TYPE: CNTRIP FPAC: 8511110361 00CMET NO: 05000445 05000446 FORMAL REPT NO:

J '

F1CHE: 68148 253 68148 253 RIDS: 00260 8511110361 XA Trio,rept of 850827-29 site visit w/ut)1 & contractors ce witnessing of Unit,1 coole tray supports walkdown in, progress & collection of info concerning new allegations.

FROM LIPLN3KI,R.E.

i TO: f Comanche Peak Project (Techn) cal Review Team)

ISSUED: 851024 AVAIL: POR Comanche Peak Project (Technical Review Team)

TASM to. DOCUMENT TYPE: CNTRIP FPAC 00!D 8511110361 00CAET NO: 05000445 FORMAL REPT NO:

FICHE: 34327 340 34327 340 HIOS:

8601060428 Trto rest,of 851009-10,15-17 & 28-31 s)te visits ce j eethodology usea by soolicant/ contractor in establishing t

equipment populations & equipment / work processes homogeneity, t

FROM T04LINSON,E.8 To: CALVO,J.A. Comanche Peak Project (Technical Revhew Team)

ISSUED: 851218 AVAIL: CF Comanche Peak Project (Technical Review Team)

TASM
3e .

00!D DOCUMENT TYPE: CNTRIP FPAct 8601060428

( 00CMET NO: 05000445 05000446 FORMAL REPT NO:

, FICHE 68230 116 68230 118 N!DS: 0026L m-

. ~ - - - .-. .--__ _ _ _ _ _

11/ 5/86 PAGE 3 U. S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8601060428 XA Trio root of,851009-10,15-17 & 28-31 sjte visits ce methodology used by soplicant/ contractor in establishing equipment populations & equipment / work processes homogeneity.

FROM TO4LINSON,E.B. Comanche Peak Project (Techn)calRev)ewTeam)

TO: CALVO,J.A. Comanche Peak Project (Technical Review Team)

ISSUED: 851218 AVAIL: POR 3po. DOCUMENT TYPE: CNTRIP FPAC: 8601060428 TASK 00!D FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 34351 254 34351 255 RIDS: D026L

, 8601210121 Oraft Trio Rept 2178 of 851029-31 site vislt ce Item VII.C, const reinsp/ documentation review plan.

FROM: FLAHERTY,J.A. Teledyne Eng)neer)ng Services TO: Teledyne Engineering Services ISSUED: 851121 AVAIL: POR Soo. DOCUMENT TYPE: CNTRIP FPAC: 8601210115A TASK , 0010 FORMAL REPT NO: 2178 DRFT DOCKET NO: 05000445 05000446 FICHE: 34298 299 34298 306 RIUS:

8601220256 Trio cent of e50829-30 visit w/util & Teledyne at S&W ofes l

in New York,NY re status of S&W effort concerning design adequacy progras for olent pioina & pipe supports. Lists 'f o attendees, agenda & util action olen encl. , ,

FROM SHAO,L. Comanche Peak Project (Technical Review Team)

TO: NOONAN,V. Comanche Peak Project (Technical Review Team)

!$$UED: 850910 AVAIL: POR 600 DOCUMENT TYPE: CNTRIP FPAC: 8601220256*

' TASK 0010 FORMAL REPT NO:

00CnET NO: 05000445 0500044o FICHE: 34333 191 34333 204 RIOS: 0026L 8601220351 Trlo rent of e51008 visit tp GI,0bs & Hill ofc In New York,NY re audit of AOLPIPE computer c' ode used in oipina analysis.

l Allegation,AP-26 questioning validity of code verificati'n o &

l QA maint unsuostantiatea.Anende encl. , ,

i FROM HOU,S.N. Comanche Peak Project (Technical Review Team)

TO: SHAO,L.C. Comanche Peak Project (Technical Review Team)

ISSUED:/851022 AVAIL: POR 20p. DOCUMENT TYPE: CNTRIP FPAC: 8601220351*

TASK 00!0: FORMAL REPT NO:

DOCKET NO: 05000445 05000446 Fiches 34333 265 34333 269 k!DS: 0026L 8601220360 Trip rept of 651008 visit to Gibbn & H)11 ofe re followup on Allegation A-26 that AOLPIPE computer program not validated.

Attendance IIst encl.

FROM MASTERSON,R. Comanche Peak Project (Techr.ical Rev ew Team)

TO: HOU,3. Comanche Peak Project (Technical Rev ew Team)

ISSUED: 851011 AVAIL: POR 2co. DOCUMENT TYPE: CNTRIP FPAC: 8601220351A TASK ODIO: FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 34333 267 34333 269 RIUS:

11/ 5/86 PAGE 4 U. S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8601220375 Trio root of 851014-18 site visit ce status 'of C'manche o Peak Response Team verification & corrective, action activities by S&W,Enesco & TERA,GA/QC const verification effort & action plan implementation.

FROM MESHISHIAN,P. Comanche Peak Project (Techn}calRevjewTeam)

TO: NOONAN,V.S. Comanche Peak Project (Technical Review Team)

ISSUED: 851022 AVAIL: POR 100o. DOCUMENT TYPE: CNTRIP FPAC 8601220366A TASK 0010 FORMAL REPT NO:

DOCKET NO: 05000445 0500044b FICHE: 34333 271 34333 280 RIOS 8601220464 Trio rest of 851126 audit discussions per slenderness ratio limitations for hanger, type supports.Ebasco Sves,Inc considering adoption of revised procedure. Slenderness ratios

shoulo be useo only wnere uncertainties exist.

FROM: REICH,M. Brookhaven National Labora, tory .

TO: SHAO,L. NRC = No Detailed Affiliation Given ISSUED: 851205 AVAIL: P0R 300 DOCUMENT TYPE: CNTRIP FPAC: 8601220461A TASK 0010 FORMAL REPT NO:

00CKET'NO: 05000445 05000440 FICHE: 34334 207 34334 209 RIDS:

, 8601220467 Trio rent of 851011 audit w/util, TERA L Comanche Peak Response Team. List of attenoees encl. Meeting between TERA &

BNL consultants will be held to discuss steam nonerator lateral restraints.

FROM: LIPINSKI,R. Comanche Peak Project (Techn) cal Rev)ew Team)

TO: Comanche Peak Project (Technical Review Team)

ISSUED: 851202 AVAIL: POR 60s. DOCUMENT TYPE: CNTRIP FPAC: 86012204618 TASK ODIO: FORMAL REPT NO:

DOCKET NO: 050004'45 05000446 FICHE 34334 210 34334 215 HIDS:

8601220492 Trio rest of 651113-14 visit to Corporate Consulting &

Development Co,Ltd t'o audit onnoing tests of electrical j conduit cleaps.

FROM LIPINSMI,R. Comanche Peak Prolect (Techn) cal Rev)ew Team)

TO: / Comanche Peak Project (Technical Review Team)

ISSUEDsi551202 AVAIL: POR 4po. DOCUMENT TYPE: CNTRIP FPAC: 8601220461E TASK ODIO: FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 34334 226 34134 229 HIDS:

8601220490 Trio rept of 651118-22 audit of cable tray hanger walkdown.

I Supports walked down L noted discrepancies IIsted.

( .

FROM LIP!NSKI,R. Comanche Peak Project (Techn) cal Rev)ew Team)

TO: Comanche Peak Project (Technical Review Team) l -

ISSUED: 851202 AVA!L POR 5po. DOCUMENT TYPE: CNTRIP FLAC: 8601220461F l

TASK 0010: FORMAL REPT NL DOCKET NO: 05000445 05000440 FICHE: 34334 230 34334 234 HIDS:

l l

l

( , _ _ _ , _ . ,. _ . . -- - -

f+.* -

7 11/ 5/86 PAGE 5 U. 8. NUCLEAR REGULATORY COMMIS810N

4. OC8 PARTIAL RECORD FORMAT REPORT
  • , 8601220519 Trip root 9f e50126 site visit ce observpt%on of 8eneidt Nemeer Tests, seismic air, space between structures & jnso of portion of esposed ceiling in control room. List of attendees & comments enc 1

, FROMt SHAO,L.C. Comanche Peak Project (Techn} cal Review Team)

T0s NOONAN,V.S. Comanche Peak Project (Technical Review Team)

ISSUE 0s 850207 AVAIL: POR son. DOCUMENT TYPE: CNTRIP FPACs 8601220519

TASKS 0010 FORMAL REPT Not 00CKET No
05000445 05000446 FICHE 34334 172 34334 175 RIOS D026L i

8601220522 walkdown. ContingentTrio root et upon 650923=26 acceptable audit of S&W resolution re as built verification pioing l,

run geometry & clearances,36W walkdown well documented &

easily verifiable.

i FROM SHAO,L.C. Comanche Peak Project (Technical Review Teem) i TO N00 NAM,V.S. Comanche Peak Project (Techn% cal Revlow Team)

! ISSUED: 851011 AVAIL: PJR apo. DOCUMENT TYPE: CNTRIP FPACI 8601220522 '

i TASK 0010 Ik8=79-14 FORMAL REPT Not

00CKET NO
05000445 0500044e FICHE: 34334 163 34334 166 R!pst 0026L  ;

i *

, 8601220536 Trls root of e50923-26 s1te, visit w/Teledyne Engineerine Sycs re audit of S&n as-built verification walkdown. ,

j -

FROMs SHAO,L.C. Comanche Peak Project (TechnIcel Review Team) i Tot NOONAN,V.S. Comanche Peak Project (Technical Rev%ew Team)

ISSUED: 851011 AVAIL: POR ape. DOCUMENT TYPE: CNTRIP FPAC: 8601220536 TASK 0010:

  • FORMAL REPT NO DOCKET NO: 05000445 05000446 FICHE 34334 240 34334 243 N!OS 0026L j

i 8601220543 [rlo.reetof,651025 audit at 34n ofes in New Ve'rk,NY re piping & pipe supoort effort. List of attendees encl.

j ,

j 4

FROMI SHAO,L.C. Comanche Peak Project (Techn) cal'Rev)ew Team)

! 708 NOONAN,V.S. Comanche Peak Project (Technical Review Team)  ;

ISSUED: 451122 AVAIL: POR Soo. DOCUMENT TYPE: CNTRIP FPAC 8601220543 TASKt 0010: FORMAL REPT N08 l

1 DOCKET NO: 05000445 05000446 FICHEt 34334 200 34334 204 N! dst 0026L j

8602110471 Telp. rest o .

851202-0) visit to TERA ofes %n,8ethesdaeMO to sudit documentation sup.tportine Initial level of homogeneity for design attivitles review Procedure DAP-21 that will be i .

implemented to valldate hoeogenehty.

! FROMt NN0X,J.L. Comanche Peek Project

?

j Tot MARIN03,E.C. Comanche Peak Project (TechnicalRev)iewTeam)(TechnjcalRe

/ ISSUED 860116 AVAILI CP 3oo. DOCUMENT TYPE CNTRIP FPAC: 8602110471

, TASK 00!D FORMAL REPT Not i , DOCKET NO: 05000445 05000446 FICHEt 68271 060 68271 062 HIOSI

~~- _ , -

i I  !

1

,; ~s .y -

=  ;

.3 2w - ;

11/ 5/86 PAGE 6 U. 8. NUCLEAR REGULATORY COMMISSION i

, DC8 PARTIAL RECORD FORMAT REPORT 8602190303 Trio Rept.2201 of 860123 yisit to Robert L Cloud & Assocain Berkeley,CA re earticipation in faciljty cable tray verification program. Company will audit cable tray tests performed FROM CIATTO,R.D. by E848CO,Impell CoroEnsIneer.

Teledyne & ANCO.ine Services 70 Telodyne Engineering Services

' ISSUED: 860129 AVAIL: POR 12po. DOCUMENT TYPE: CNTRIP FPAC: 86021902994 TASK: 0010 FORMAL REPT NO:

i DOCKET NO: 05000445 0500044e FICHE: 34627 117 34627 128 RIOS:

8602190327 Trio Rept 2202 of 860122 visit to Im5 ell Cori In Walnut Creek,CA re aoolicability of slenderness,ratlo; limit to

facility caoje tray hangers & Impell design criteria 6 j procedures.Vieweraphs enci.

FROM CIATTO,R.O. Telodyne Ene)neerjne Serv. Ices

! To Telodyne Engineerine Services i

ISSUED: 860122 AVAIL: POR 36po. DOCUMENT TYPE: CNTRIP FPAC 86021902998 ,

TASK , 00!D FORMAL REPT NO:

l, DOCKET N.0 05000445 05000446 FICHE: 34627 129 34627 164 k!D8 r .

, 8602240605 Trio rest of 851021-24 sIto visit ce GA program procedures.

j Results of discussions factored Into 860115 memo.

!' FROM GRIMES,b.K. DIVIslon of GA, Vendor & TechnIca1 Training Center Pr'o ,

l TO: N00 NAN,V.8.. Office of Nuclear Reactor Regulati,on, Director (post 85 ISSUED: 860218 AVAIL: POR 3so. DOCUMENT TYPE: CNTRIP FPAC: 8602240605 l TA8K 0010 FORMAL REPT NO:

'N s l ODCKET NO: 05000445 05000446 FICHE 34683 160 34683 162 R!US:

i s/

('8602250142 Tejo Rept 2200 of 860117 site visit re HVAC hanger program

, audit. Status of licensee, steam electric station se,ismic l

N qualification rest of seismic Category 1 duct work'& hangers l g\ changed from "soproved"Toledyne FROM: RIVARD,J.J. to "not approved" EnsIneerIno onServices 660121.

l

) 701 / Telodyne Engineerine Services

  • f ISSUED: 460117 AVAIL: CF 3os. DOCUMENT TYPE: CNTRIP FPAC: 8602250137A TA8K 00!Os 6410=49 PORMAL REPT NO: *'

k 00CKET N0 05000445 0500044e PICHE: 68288 161 68288 163 RIOS:

i b'8h02260062 Trip rept of 851021-24 site visit ce GA program proceoures.

! Listed personnel contacted at site.Results of discussions documented in 860115 semo.

l l

FROM GRIMES,8.4 Division of GA, vendor & Technical Trainine Center Pro

! T0: NOONAN,V.S. Comanche Peak Project (Technical Review Team) l ISSUED: 860218 AVAIL: POR 3oo. DOCUMENT TYPE: CNTRIP FPAC 8602260062 l TASK 00!D FORMAL REPT NO:

l- DOCKET NO: 05000445 05000446 FICHE 34703 147 34703 149 RIOS: 0026L 1

i

. _ ... ._. -s 11/ 5/86 PAGE T U. 3. NUCLEAR REGULATORY COMMISSION DC8 PARTIAL RECORD FORMAT REPORT

.-------~

8603130290 TrIn rest of 860219 site visit to examine pr'oblems re $

improperly installed cools solicos used,for Bunker-Romo

. electrical penetrati'on connections to field wiring. List of attendees enc 1, PROM: CH0PRA,0.P. Electrical, Instrumentation & Control Systeem Branch T0: ROSA,F. Electrical, Instrumentatlon & Control Systems Branch ISSUED: 860306 AVAIL: CF 6pn. DOCUMENT TYPE: CNTRIP FPAC 8603130290 TASK 00!Os FORMAL REPT NO:

DOCKET 05000445 0500044e FICHE: 68314 354 68314 359 RIDS: -

8603130290 XA Trio rest of 860219 site visit to examine problems re improperly installed coole solices used for Sunker-Remo electrical penetratI'n o connections to field wiring. List of attendees encl.

FROM CH0PRA,P.O. Electrical, Instrumentation & Contret Systems Branch TO: ROSA,F. Electrical, Instrumentation & Control Systems 8rench ISSUED: 860306 AVAIL: POR 6pi. DOCUMENT TYPE: CNTRIP FPAC 8606120132A TASK , 0010 FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 36518 180 36518 185 RIOS:

8604040125 Trio rest of 851120-22 site audit of S&W implementation of Project Procedure CPpP-8 for ploIns & pipe supports.No Items of noncompliance or deviations noted.

FROM: TERA 0,0 Comanche Peak Project (Technical Review Team)

TO: SHAO,L.C. Comanche Peak Project (Technical Review Team)

ISSUED: 860401 AVAIL: POR to . DOCUMENT TYPE: CNTRIP FPAC 8604040125 TASK 0010 FORMAL REPT NO:

T NO: 05000445.05000446 FICHE: 35394 068 35394 069 RIOS: 00260 B605150205 Telo rept of 651125 visit to Stw Eng)neerine Core re audit of nonseismic pipine effects on seismic design pipi.na.

Further auqit of anchor destens required. List of attendees

& related info enc 1 FROM: H O U., S . N . Comanche Peak Project (Technical Review Team)

TO: SH90,L.C. Comanche Peak Project (Technical Review Team) j  !$$UED: 451218 AVAIL: CF 19pi. DOCUMENT TYPE: CNTRIP FPAC 8605150196A

' J TASK ODID: FORMAL REPT NO:

00CKET NO: 05000445 05000446 FICHE 68390 066 68390 084 RIOS:

4605150205 XA Trip rept of 651125 vleit to Stw EnsIneerine Core ce audit of nonseismic piping effects on selsmIc design pipina.

  • Further audit of anchor designs required. List of attendees

, & related info enc 1.

FROM HOU,3.N. Comanche Peak Project (Technical Rev ew Team) 70 SHAO,L.C. Comanche Peak Project (Technical Rev ew Team)

, ISSUED: 851218 AVAIL: POR 19pd. DOCUMENT TYPE: CNTRIP FPAC: 86100803a9A TASK 0010 FORMAL HEPT NO:

DOCKET NO: 05000445 05000446 FICHE: 38220 tot 38220 ta2 N!DS:

mme am a a

r : m #.m. ~.. ...:.- ~ ..~.. ~ _.

r _. .. = _

l4 L 11/ 5/86 PAGE 8 U. S. NUCLEAR REGULATORY COMMISSION OCS PARTIAL RECORD FORMAT REPORT 8605150205 XB Tel.p rest of 851125 visit,to Stn Engjneering Coro re aualt of nonseismic piping effects on seismic design piping.

Further audit of anchor designs required. List of attendees

& related info enc 1.

FROMt HOU,3.N.

Tot SH40,L.C. Comanche Peak Project (Techn)calRevjewTeam)

Comanche Peak Project (Technical Review Team)

ISSUE 0s 851218 AVAIL: POR 19oo.

TASKt 0010 DOCUMENT TYPE: CNTRIP FPACI 8610080349A 00CMET,Nat 05000445 FORMAL REPT N0t FICHEt 38220 101 38220 142 RIOS:

[8605290133 issues audit Trio root of meetines. 860505-07 Audit site&visit attendee list agenda to attend enc 1 civil / structural FROM DEGRASSI,G.

T08 JENG,0 Brookhaven National labora)ory ISSUED: 860521 AVA!L CF NRC.= No Oetailed Affiliation Given 96po.

TASKg , DOCUMENT TYPE CNTRIP FPAC 8605290133 ODIO: FORHAL REPT NO:

( 00CKET NJUL 05^4,0445 0500044e FICHE 68410 001 68410 097 RIOS x003@

8606250168 inspectors toTelo rest of 841114-16 emphasize site lasues that all safety visit ce must meetinas be w/0A/WC resolved Defore units can be licensed.

FROMt NOONAN,V.S.

TO: EISENHUT,0.G. Comanche Peak Project (Technical Review Team)

ISSOEOS 650115 AVAILt POR Division of Licensina (800428-851124) 2po.

TASKt 0010 DOCUMENT TYPE: CNTRIP FPAct 8606250042A

__s 00CKET FORMAL REPT NO N0t,05000000 05000445 05000446 FICHE 36824 230 36824 234 HipSt 8609160363 Trio root of attendance at 660821 meetina in Arlinaton,TX re util plans for olent issues. Summaries of observations listed.

FROMt ASHAR,H. EngineerInn Branch (PhR=4)

TOS BALLARD,R. Engineerinn Branch (PwR=A)

' ISSUED: 860903 AVAIL: CF 2co.

TASKt 00!08 DOCUMENT TYPE: CNTRIP FPAct 8609160363 FORMAL REPT NO 00CAET NO: 05000445 0500044e FICHE 68547 321 68547 322 RIOS:

t 6