ML20196L193

From kanterella
Jump to navigation Jump to search
Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves
ML20196L193
Person / Time
Site: Comanche Peak  
Issue date: 05/20/1999
From: Terry C, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196L195 List:
References
TXX-99119, NUDOCS 9905270179
Download: ML20196L193 (1)


Text

F nummmmmmme

==

I7 Log # TXX-99119 4

=

=

File # 10010.2 Ref. # 10CFR50.36 1UELECTRIC May 20,1999 C. Lance Drry Senior Hee President

& PrincipalNuclear Oficer U. S. Nuclear Regulatory Commbsion Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 MONTHLY OPERATING REPORT FOR APRIL 1999 l

Attached is the Monthly Operating Report for April,1999, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the CPSES Units 1 and 2 Operating License Nos. NPF-87 and NPF-89, respectively. During this reporting period, there have been no failures or challenges to the Power Operated Relief Valves or Safety Valves for CPSES Unit 1 and Unit 2.

This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2. Should you have any questions, please contact Douglas W. Snow at (254) 897-8448.

Sincerely, C. L. Terry By:

Don R. Woodlan Docket Licensing Manager I

DWS/grj Attachment i

c-Mr. E. W. Merschoff, Region IV Mr. J. l. Tapia, Region IV Mr. D.H. Jaffe, NRR

\\

Resident inspectors N

9905270179 990520 0

b PDR ADOCK 05000445 R

PDR

[,

COMANCHE PEAK SILAM ELECTRIC STATION P.O. Box 1002 Glen Rose. Texas 76043-1002