Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl ML20195H9221998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant ML20127F5051992-10-21021 October 1992 Discusses 921020 Telcon W/R Feldman of Thermal Science,Inc (TSI) Re 921018 Rept Made by Util That Less than 10 of 2,000 Conduit Sections Provided by TSI Showed Signs of Delamination & Some Had Occluded Porosity in Cross Sections IR 05000445/19920181992-07-0606 July 1992 Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property ML20057B4601992-05-15015 May 1992 Discusses Telcon W/Rm Dow Re Plant ML20057B1881991-04-18018 April 1991 Discusses 910405 Telcon W/Alleger Re Security Sys at Plant ML20029A4071991-02-13013 February 1991 Forwards Correspondence sign-off Sheet for LER 90-036-01. Suppl Acceptable for Submittal to NRC ML20057B1781991-02-0505 February 1991 Discusses Allegations Made by M Dow Re Scores of Security, Safety Violations & Allegation of Sexual Harassment at Plant ML20065K0251990-11-0707 November 1990 Forwards Amend 2 to Tech Specs,Modifying Tables 2.2-1 & 3.3-3 Re Neutron Flux Meter Setpoints 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl ML20195H9221998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128H2931993-02-10010 February 1993 Staff Requirements Memo Re Emergency Motion to Stay Issuance of low-power Operating License.Staff Issued Order Denying Motion ML20128E4301993-02-0505 February 1993 Staff Requirements Memo Re 930129 Affirmation/Discussion & Vote on SECY-93-016 Discussing FRN Concerning Proposed Issuance of OL ML20062J1941993-02-0303 February 1993 Board Notification 93-001:notifies of 930202 Emergency Motion to Stay Issuance of low-power OL Requesting Listed Items Including Issue Order Staying Issuance of License ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant ML20127F5051992-10-21021 October 1992 Discusses 921020 Telcon W/R Feldman of Thermal Science,Inc (TSI) Re 921018 Rept Made by Util That Less than 10 of 2,000 Conduit Sections Provided by TSI Showed Signs of Delamination & Some Had Occluded Porosity in Cross Sections IR 05000445/19920181992-07-0606 July 1992 Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property ML20057B4601992-05-15015 May 1992 Discusses Telcon W/Rm Dow Re Plant ML20057B1881991-04-18018 April 1991 Discusses 910405 Telcon W/Alleger Re Security Sys at Plant 1999-08-27
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H7501999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209G7421999-07-0808 July 1999 Forwards SER Concluding That Licensee Individual Plant Exam of External Events Process Capable of Identifying Most Likely Severe Accidents & Severe Accident Vulnerabilities & IPEEE Met Intent of Supp 4 to GL 88-20 ML20196L0121999-07-0808 July 1999 Forwards Safety Evaluation Granting First 10-Year Interval Inservice Insp Requests for Relief B-6 (Rev 2),B-7 (Rev 2), B-12,B-13,B-14 & C-9,pursuant to Tile 10CFR50.55a(g)(6)(i) ML20196K6771999-07-0202 July 1999 Ack Receipt of & Encl Scenario for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721-22.Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20196J4881999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid as Version 2 ML20196J0401999-06-29029 June 1999 Forwards Safety Evaluation Re Plant,Units 1 & 2 Proposed Changes to Emergency Plan ML20196E6641999-06-22022 June 1999 Forwards Insp Repts 50-445/99-11 & 50-446/99-11 on 990418- 0529.No Violations Noted.Licensee Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance & Acceptable Radiological Control ML20207H3801999-06-0909 June 1999 Forwards Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Violations Identified & Being Treated as Noncited Violations ML20195G3771999-06-0909 June 1999 Ack Receipt of Ltr & Encl Objectives for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721.Based on Review,Nrc Determined That Exercise Objectives,Appropriate to Meet Plan Requirements ML20207G3291999-06-0707 June 1999 Ack Receipt of Which Transmitted Rev 27 to Comanche Peak Steam Electric Station EP Under Provisions of 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of EP No NRC Approval Required ML20207E9291999-06-0202 June 1999 Discusses 990526 Request That USNRC Exercise Discretion Not to Enforce Compliance with TS 4.8.2.1e Re Performance of Battery Performance Discharge Test,In Lieu of Battery Svc Test.Concludes Action Satisfactory & Discretion Exercised ML20207D7111999-05-28028 May 1999 Advises That Info Contained in Licensee 990514 Submittal Re License Amend Request 98-01-0 Will Be Withheld from Public Disclosure,Per 10CFR2.790. 10CFR2.790 ML20207D7011999-05-27027 May 1999 Advises That Info Contained in TU Electric 990514 Submittal (TXX-99115) Re License Amend Request 98-010 Will Be Withheld from Public Disclosure (Ref 10CFR2.790),per 990511 Application & Affidavit ML20207B7241999-05-25025 May 1999 Advises That Info Contained in Application & Affidavit 990507 (CAW-99-1333),submitting WCAP-15004,dtd Dec 1997,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20206Q0031999-05-14014 May 1999 Forwards Safety Evaluation Accepting Licensee Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Steam Electric Station,Unit 1 ML20206P5961999-05-12012 May 1999 Forwards Insp Repts 50-445/99-09 & 50-446/99-09 on 990419- 23.No Violations Noted.Nrc Determined That Releases of Radioactive Waste Effluents Controlled,Monitored & Quantified Well ML20206N7061999-05-12012 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Reorganization Chart Encl ML20206S5841999-05-11011 May 1999 Forwards Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint & Acceptable Radiological Controls ML20206K0311999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info,Without Encl ML20206H1701999-05-0606 May 1999 Forwards Copy of Exemption & Safety Evaluation Supporting Requirement in App K to 10CFR50.Proposal Will Use New Feedwater Flow Measurement Sys to Allow More Accurate Measurement to Thermal Power ML20206K3931999-05-0505 May 1999 Ltr Contract,Task Order 41, Comanche Peak Safety System Engineering Insp, Under Contract NRC-03-98-021 ML20206G1221999-05-0303 May 1999 Discusses 981215 Request That Document, Responses & Further Clarifications to NRC Questions from 980929 Meeting, Be Withheld from Public Disclosure.Determined Information to Be Proprietary & Will Be Withheld from Public Disclosure ML20206F5711999-04-30030 April 1999 Forwards Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Insp Re Focus on Radiation Protection Program Activities During Unit 2 Refueling Outage ML20206E5211999-04-27027 April 1999 Discusses GL 96-01 Issued on 960110 & TU Responses, ,970102 & 980502 for Cpses,Units 1 & 2.Determined That Submittals Provided Both Info Requested & Responses Required by GL 96-01 ML20206B3831999-04-23023 April 1999 Forwards FEMA Final Rept for 990311,Comanche Peak Steam Electric Station Medical Drill.No Deficiencies or Areas Requiring Corrective Actions Identified ML20206B5321999-04-22022 April 1999 Ack Receipt of Ltrs Dtd 970407,09 & 0204,which Transmitted Revs 6 & 7 to Safeguards Continency Plan,Rev 10 to Security Training & Qualification Plan & Rev 29 to Physical Security Plan Submitted Under Provisions of 10CFR50.54(p) ML20206A2301999-04-14014 April 1999 Refers to Public Meeting Conducted on 990329 in Glen Rose, Tx Re Results of Plant Performance Review Completed on 990211 & Transmitted to Licensee on 990319.List of Attendees Encl ML20205L8711999-04-0707 April 1999 Forwards Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Were Identified.Review of Operability Evaluation Re MOVs Disclosed That Licensee Failed to Include Info About Degraded ECCS Performance ML20205L1051999-04-0606 April 1999 Informs of Completion of Review of Tuec 980312 Submittal Re GL 97-05, SG Tube Insp Techniques. No Concerns Identified with SG Insp Techniques Employed at Cpses,Units 1 & 2,that Would Indicate Noncompliance with Current Licensing Basis ML20205F9141999-04-0101 April 1999 Informs That as of 990329 Dh Jaffe Has Been Assigned as Senior Project Manager for Plant IR 05000446/19920491999-03-24024 March 1999 Discusses Concern That Postulated Fire in CR Could Create Single Hot Short in Control Circuitry of MOVs Resulting in Spurious Operation.Required Hardware Mods Implemented to Control Circuits of Affected Mov,Per Insp Rept 50-446/92-49 ML20204F3311999-03-23023 March 1999 Forwards Discussion Items for 990323 Telcon 1999-09-07
[Table view] |
Text
.. . -. .- - . .
- ./ ,
1
- UNITE 3 STATES l g*p***%g'g NUCLEAR REGULATORY COMMISSION l
s- y WASHINGTON. D.C. 20505
? .
j
,,,,, DEL i6 h4 l
NOTE T0: D. Landers, TES FROM: L. Shao, Group Leader, C/P
SUBJECT:
RESOLUTION OF APPENDIX P ISSUES IN NUREG-0797 SUPPLEMENT NO.11 As you are aware Texas Utilities Electric Company (TVEC), in their Comanche. I Peak Response Team (CPRT) Program Plan, has comitted to addressing and resolving the generic concerns expressed by the NRC Technical Review Team (TRT) as presented in NUREG-0797 Supplement No. 11 Appendix P. We have
' recently learned that TUEC is.in the process of resolving issues identified -
in Appendix P.
1 I would like Teledyne Engineering Services (TES) to follow TUEC's implementa-tion of the CPRT Plan with particular attention to the applicant's method of resolution of the concerns.in Appendix P (40 concerns in Mechanical / Piping and 34 concerns in Civil / Structural). Your contacts at the NRC CP Project will be S. Nien Hou for M/P and D. Jeng for C/S. The purpose of your review is to i
assure that TUEC is responding properly to the concerns expressed in Appendix i
P, and has detemined the root cause and and address the generic implications-of each concern. Teledyne should assign a lead engineer to this task and l
identify this individual to me by December 23, 1985.
. L L. Shao, Group Leader
- ' Comanche Peak Project l !
L cc: V. Noona C. Tramel A. Vietti-Cook S. Hou D. Jeng R. Piasterson Foz n - u M 7 8702100021 870129 PDR FOIA GARDE 86-657 PDR
r t' Acsudcw Pssx .
4N/' pGC 6.Jerrwer/o.J kes/cs7?od.<C<so/er
&cvss< co,<.)arsecr/o.d 6 ss<asnoJ .~'a <
/3r e.oa.co os .~
{ @ -c/rsea , w s. esso m aoos assasw, QN ' :.d em ceas w a#. m 4.h nAu c.y.mt) .a .# A #vA
@ - jf.o.o< n o s %e e.4.Joem a,.9x a r / a m
~
6/sser
/onur-oa 7mr es.r c.aaers w e,y J/cd///cAdcd. Cf - Affc,%Q/4 &# J.*9ff -
s3/7 WF & ced SifFLl% - l A I l'l.5 L l) ~: illis l'u G c30 -Lao-< F,--n~, s,---, e as-r o.c sarasnos v a a a ,. m n s . (.Aeoor s.
r -- u.W u$//fdsf/.1"'A./f G^,,T h ~ ALoA:/ Add" #fA?/f/c4rsod ds.AdJ*e/c 7~
o, w -aoa-<asar /anarsss.
C D - f e c /.o.d e /D ars a n o D ,a s s.u r<
69 cbsca Assw Gm /asssar<o.J
.cssacra .
(5) ~ // S S OYod/4 / Jh.tl A26*av/sre
@ /bGR i ud t Cah'e k:y /cc-&:J h, y . ;t, 3 ic o) A z L <= c L p y n g r p;.. upy>J punn-cA7 8/6
s- _
T1( U W
/O-3-Vs MTG-OBJECTIVE OF ISAP VII.C (f OW .
COLLECT INFORMATION ON THE ADEQUACY OF CONSTRUCTION WORK ACTIVITIES USING STATISTICAL SAMPLING TECHNIQUES.
t 0
B/1,
. - - - - . a 4, A + A. u W=
.(
METHODOLOGY CATEGORIZE INSTALLED SAFETY RELATED HARDWARE INTO POPULATIONS MADE UP 0F HOMOGENE0US WORK ACTIVITIES FROM WHICH STATISTICAL SAMPLES CAN BE DRAWN FOR EVALUATION.
4 I
I l
ORGANIZATION BASED ON PREVIOUS PROGRAM EXPERIENCE - ENGINEERING GROUP ORGANIZED INTO THREE DISCIPLINES WHICH ARE STAFFED WITH-ENGINEERS EXPERIENCED IN ALL ASPECTS OF CONSTRUCTION /
INSTALLATION ACTIVITIES CIVIL / STRUCTURAL ELECTRICAL MECHANICAL I
9
.l l
[
---r . .. ._ . . . , . _ _ _ . , . . _ , , . _ _ _ . _ . , ,- , --__ . - - . _ . . - _ . . . _ , - . . ~ _ - , . . - , , , . - - . _ - . . , _ _ . _ , _ _ _ _ _ _ _ _ _ _ _ _ . . _ . - - .
-?
CIVIL / STRUCTURAL CONCRETE PLACEMENT STRUCTURAL STEEL INSTALLATION i
HANGER AND SUPPORT INSTALLATIONS ;
LINER INSTALLATIONS FILL & BACKFILL PLACEMENT 4
8 e
I l
l l
e,',
I ELECTRICAL .- t
/
CONDUIT AND CABLE TRAY INSTALLATION CABLE INSTALLATION ELECTRICAL EQUIPMENT INSTALLATION INSTRUMENTATION EQUIPMENT INSTALLATION e
D 1
5 9
e l
i
9
MECHANICAL l
PIPING'lNSTALLATION HVAC INSTALLATION MECHANICAL EQUIPMENT INSTALLATION FIELD FABRICATED TANK INSTALLATION t
4 0
e J
i I
l l
l
CIVIL / STRUCTURAL ELECTRICAL '
MECHANICAL .
CONCRETE PLACEMENT CONDUIT AND CABLE TRAY PIPING INSTALLATION INSTALLATION STRUCTURAL STEEL INSTALLATION CABLE INSTALLATION HVAC INSTALLATION i
HANGER AND SUPPORT ELECTRICAL EQUIPMENT MECHANICAL EQUIPMENT INSTALLATION INSTALLATION INSTALLATION LINER INSTALLATIONS INSTRUMENT EQUIPMENT FIELD FABRICATED INSTALLATION TANK INSTALLATION FILL & BACKFILL PLACEMENT l
! DISCIPLINES CONDUCT EVALUATION FOR ASSIGNED
- INSTALLATION ACTIVITIES AND IDENTIFY 0 WORK PROCESSES O DRAWINGS, SPECIFICATIONS, CODES, STANDARDS 0 ATTRIBUTES & ACCEPT / REJECT i CRITERIA 0 ORGANIZATIONS / CRAFTS /
INSPECTION GROUPS l
CIVIL / STRUCTURAL ELECTRICAL MECHANICAL
- POPULATIONS POPULATIONS POPULATIONS i
r -.
9 O
POPULATION WORK WORK .
PROCESS PROCESS
- ATTRIBUTE - ATTRIBUTE
- ATTRIBUTE
- ATTRIBUTE
- ATTRIBUTE - ATTRIBUTE P
.l I
i
~ . . - . . ,
A 4 -
t 4
-I DURING ESTABLISHMENT OF POPULATION-THE FOLLOWING TESTS ARE APPLIED
- 1. WORK PROCESSES ARE THE SAME
- 2. SIMILARITY OF EACH WORK PROCESS O ATTRIBUTES AND ACCEPTANCE CRITERIA 0 CODES AND STANDARDS 0 ORGANIZATION O CRAFTS g,3 , g s dla E
,h ' I ' '
O INSPECTION GROUPS
~r ', '
, a+ t /
l
, _ . . . - _ - _ _ - _ _ _ _ , . _ . . _ _ _ _ _ _ - . - . ~ . . _ _ _ _ _ _ , . . - - _ . _ _ , - _ . .
k f; !
ELECTRICAL POPULATIONS rELECTRICAll rC BLE CABLES ICONbuYT1 IiNSTRUMENTATION
' 8
' I ' '
EQ L ._UIPMENT
_ _ _ , __TRAY
__ . a '_ _ _ .J l L- EQUIPMENT J
ACTIVITIES / ATTRIBUTES WORK PROCESS PREPULL PULL TERMINATE -
ATTRIBUTES - SIZE - LUBRICANT * - IDENTIFICATION .,
- TYPE - ROUTING - TESTING **
- COLOR - BEND RADIUS ** - INSULATION"
- DEFECTS * - SPACING - CONDUCTORS **
RACEWAY * - SLACK - TERMINALS **
- PULL TENSION * - HARDWARE **
- SEPARATION - LANDINGS DAMAGE ** - HEAT SHRINK **
REPAIR ** - SECURE DOCUMENTATION REVIEW ONLY REINSPECTION AND DOCUMENTATION REVIEW
PAGE 1 0F 3 ,
BASIS FOR SIMILARITY OF WORK ACTIVITIES POPULATION: CABLES J
- WORK' ACTIVITIES COMMON TO ALL CABLES PRE-PULL PULLING I
TERMINATION ATTRIBUTES AND ACCEPTANCE CRITERIA COMMON TO ALL CABLES DERIVED FROM COMMON SPECIFICATION, DRAWINGS AND PROCEDURES
- ONE PULLING PROCEDURE FOR ALL CABLES
- BROWN a ROOT PROCEDURE EEI-7, CABLE PULLING
- ONE TERMINATIONS PROCEDURE FOR ALL CABLES
- BROWN & ROOT PROCEDURE EEI-8, CLASS 1E AND NON CLASS 1E CABLE TERMINATIONS
- ExCEPT LIGHTING AND NIS CABLES BROWN & ROOT PROCEDURE eel-4 CABLE PULLING AND TERMINATION OF LIGHTING WIPE BROWN & ROOT PROCEDURE EEI-18 FIELD INSTALLATION OF NIS TRIAXIAL CABLES A CONNECTORS
(
BASIS FOR SIMILARITY OF WORK ACTIVITIES POPULATION: CABLES (CONT'D)
CODES AND STANDARDS REQUIREMENTS OF APPLICABLE CODE AND STANDARDS INCORPORATED INTO ELECTRICAL ERECTION SPECIFICATION GIBBS a HILL SPECIFICATION 2323-ES-100 INSTALLATION PROCEDURES DERIVED FROM ERECTION SPECIFICATION
BROWN 8 ROOT CONSTRUCTION MANAGEMENT TEAM SUPERVISED ALL CABLE PULLING AND TERMIFATION ACTIVITIES.
a f
i f
r 2
L
BASIS FOR SIMILARITY OF WORK ACTIVITIES f POPULATION: CABLES (CONT'D)
CRAFTS BROWN & ROOT EMPLOYED AND TRAINED ELECTRICIANS PERFORMED ALL CABLE PULLING AND TERMINATING 1 ACTIVITIES. THE SAME CREW PULL ALL CABLES AND THE SAME CREWS TERMINATE ALL CABLES.
INSPECTION TUGC0 INSPECTION PROCEDURE QI-QP-11.3-26 IS USED TO INSPECT ALL CABLE PULLING ACTIVITIES * ,
TUGC0 INSPECTION PROCEDURE QI-0P-11.3-28 IS USED TO INSPECT ALL CABLE TERMINATING ACTIVITIES
- TUGC0 INSPECTORS CERTIFIED TO THESE PROCEDURES HAVE INSPECTED ALL CABLES.
EXCEPT LIGHTING & NIS CABLES TUGC0 INSPECTION PROCEDURE 01-0P-11.3-25, LIGHTING INSPECTION TUGC0 INSPECTION PROCEDURE QI-0P-11.3-43,NIS CABLES 2
, EtttiRICAL
~
-IELECTRiCALI ICABLEl CONDUIT 9NSTRUMENTATION'l F CA
~BLE1 e i i l l 1' i I L EQUIPMENT g u_a y EQUIPMENT _ 2, g TRAY _j WORK PROCESS SELECTION PREPARATION INSTALLATION ATTRIBUTE - SIZE / MATERIAL - CONDUIT / - IDENTIFICATION FABRICATION (1)
- ORIGIN /
- CUTTING DESTINATION
- DE-BURRING - FITTINGS
- REPAIR - BENDS (2)
PULL POINTS (2)
FLEXIBLE CONDUIT
- INTEPFACE (TRAY)
CLEARANCE l
FIRE STOPS i AND SEALS SEPARATION l
(1) DOCUMENT REVIEW l
(2) THIS ATTRIBUTE WAS ORIGINALLY CONSIDERED FOR THE CHECKLIST BUT SUBSEQUENTLY EXCLUDED FOR ALL CONDUIT EXCEPT NUCLEAR INSTRUMENTATION SYSTEM (N.I.S) CONDUIT BECAUSE OF NOT BEING SAFETY SIGNIFICANT.
l l _ - .
4 CONDUIT WORK PROCESS PROCEDURE APPLICATION
, _ INSTALLING INSPECTION ORGANIZATION GROUPS SELECTION BROWN & ROOT RIGID & FLEX BROWN & ROOT BROWN & ROOT y PROCEDURES EXPOSED ' 'l ' '#
CONDUIT INSTALLATION
! ECP -19 & 19A~
J 1
! PREPARATION BROWN & ROOT RIGID & FLEX BPOWN & ROOT BROWN & ROOT-
~
PROCEDURE EXPOSED #~
- CONDUIT INSTALLATION
! ECP -19 & 19A 1
INSTALLATION BROWN & ROOT RIGID & FLEX BROWN & ROOT "acha s R0oT-
, PROCEDURE EXPOSED ~IU C CONDUIT INSTALLATION ECP -19 & 19A
- BROWN & ROOT RIGID & FLEX BROWN & ROOT BRUWN t~ ROUT PROCEDURE y
7 '5 3 '-
l FIELD INSTALLATION OF FIRE BARRIER l MATERIAL eel-25
~
i i
l .
1
CONCRETE PLACEMENTS PREPLACEMENT PLACEMENT POSTPLACEMENT DESIGN MIX ' PLACEMENT PROCEDURES SURFACE . INSPECTION FORMS
- VIBRATORS USE CORED HOLES l LOCATION
- CONCRETE TEMPERATURE . CRACKS
! SIZE RECORDS PATCHES i
! EMBEDMENTS TEST RESULTS ANCHOR BOLTS WATER STOPS CONSTRUCTION JOINTS I
- l DOCUMENTATION REVIEW ONLY l DOCUMENTATION REVIEW AND REINSPECTION l
e G
.~
.o .
BASIS FOR SIMILARITY OF CONCRETE PLACEENTS ACTIVITIES !
GIBBS & HILL'S " CONCRETE" SPECIFICATION IS THE BASIC DOClNENT FOR CONCRETE PLACEMENTS AND IT IMPACTS ALL POURS.
ALL CONCRETE PLACEEnr PERFORED BY BROWN & ROOT CONCRETE PREPLACEENT PROCEDURES AND INSPECTION CHECKLIST, Com0N TO ALL POURS.
PLACEE NT AND POSTPLACEMENT PROCEDURES AND CHECKLIST, COMMON TO ALL P00RS.
REQUIREMENTS FOR TESTING OF CONCRETE, C0m0N TO ALL POURS. .
ALL CONCRETE PLACEMENTS ARE SUBJECT TO ALL APPLICABLE ASTM AND ACI CODES AND STANDARDS.
f 6
- - - - , - - - . . . , , , , _ _ _ _ , , _ _ . .,-,-.y -_., ,.- . _. ,._ .. v _ . . _-, _ . _ . . _ . , ._ .-,, ..--...- ----.. -.. ..
ELECTRICAL POPULATIONS I CABLE 7 I CO
'5DUITl INSTRUMENTATION TLECTRICALt rchBL'E '
EQUIPMENT ' EQUIPMENT '
L.- _ J H -- -- 4 L-. - - -- 4 '.
I- TRAY
-.J WORK ,
I PROCESS TUBING / PIPING INSTRUMENT AND COMPONENT INSTALLATION INSTALLATION ATTRIBUTE - MATERIAL IDENTIFICATION , - IDENTIFICATION
- TUBING SIZE & MARKING - LOCATION
- ROUTING - SEPARATION
- SLOPE - DAMAGE
\
- AIR GAP ,
y
.p
- SEPARATION / ,./
2m
'y d .
- SYSTEM BENDS _.
., i s P
- FLEX HOSE INSTALLATION
[,%ln ( C t:
ATTRIBUTES NOT INCLUDED:
FITTING TIGHTNESS - ALL INSTALLATIONS ARE EITHER HYDR 0 STATICALLY OR PNEUMATICALLY TESTED.
. INSTRUMENT EQUIPMENT POPULATION THE INSTALLATION WORK PROCESS INVOLVED IS THE SAME FOR ALL INSTRUMENTS, THE FOLLOWING PROCEDURES / SPECIFICATION WERE USED IN THE INSTALLATION ,
BROWN a ROOT CONSTRUCTION PROCEDURE -ICP4 GIssS & HILL'S ELECTRICAL ERECTION SPEC, - 2323-ES-100 3
GIsas & HILL'S TUBING AND FITTING SPEC. - 2323-MS-625 l -
I TUGCO'S PROCEDURE FOR THE INSPECTION - QI-QP-11,8-5 0F '
INSTRUMENT TUBING FABRICATION, INSTALLATION AND INSTPUMENT
- INSTALLATION. .
THE SAME PROCEDURES APPLY TO ALL THE INSTRUMENTATION EQUIPMENT, BROWN A R00T'S INSTRUMENTATION GROUP IS RESPONSIBLE FOR THE SUPERVISION OF INSTALLATION OF INSTRUMENTS, BROWN 8 R00T'S INSTRUMENTATION CRAFTSMEN DID THE INSTALLATION, TUGCO'S INSPECTORS DID THE INSPECTION AND ACCEPTANCE OF THE INSPECTION, I l i
1
, LARGE BORE PIPING CONFIGURATION WORK ACTIVITIES
, INSTALLATION TYPICAL ATTRIBUTES COMPONENT SEQUENCE LOCATION ,
DIMENSIONS IDENTIFICATION .
CODES AND STANDARDS ASME.III INSTALLATION RESPONSIBILITY BROWN AND ROOT RESPONSIBLE FOR INSTALLATION INSPECTION RESPONSIBILITY BROWN AND ROOT RESPONSIBLE FOR INSPECTION
a 6
4
N ' *9 s 2 -
RE E l
81R l -
t . ,
t' I !
l E
~
l a
-W ~
E 5 g $ %
l' E 5 36 s i !!
a!!
a =I 8
s 8
- _ _ , y _1
- 5 3 i
~
8 I . I 5 ! E
_ gI
= , ,
3 jh t3 ! k
._ s- _
ag c3 n' I 3 3 =
3
}i i i 8 I 3 ! t i
f .
!$ ~
y j I
-l!
a l i i 1 e
- a 1 3
)a ~
a ! i
- 1 5 z fl= -
l 1 .!
- _)
a yy .. c : r B-3 I $
I -
' 1
-lef -
ag
! 1
.I 51 6
c r :
il 55. J/ 35 1 5 5 ! ] I J
II
MEASUREMENTS AND/OR INSPECTIONS
, CPSES CPSES REINSPECTION .
DOCUMENT REVIEW s
j 25 POPULATIONS 25 24 POPULATIONS AVERAGE 9.0 AVERAGE 6.8
. ATTRIBUTES PER ATTRIBUTES PER POPULATION / POPULATION \
225 ATTRIBUTES 163 ATTRIBUTES AVERAGE 4.7 SUB ,
AVERAGE 2.8 SUB ATTRIBUTES PER ATTRIBUTES PER MAIN ATTRIBUTE MAIN ATTRIBUTE 1057 SUB ATTRIBUTES 457 SUB ATTRIBUTES I AVERAGE 89.7 SAMPLES AVERAGE 90 SAMPLES l - PER POPULATION PER POPULATION l 94800 TOTAL SUB ATTRIBUTES ' 41126 TOTAL SUB ATTRIBUTES l (MEASUREMENTS AND/OR INSPECTIONS PER 1.5 INSPECTIONS PER '
l SUB ATTRIBUTE IS RANSING FROM 1 TO 40 SUB ATTRIBUTE ASSUMING AN AVERAGE OF 5 -
i
tu 474000 61,700 n
^
7 ,^ . . ,
!, 535,700; TOTAL T ,
l INSPECTIONS AND/aR MEASUREMENTS ,
I i., .;;
l
,s
.}}