IR 05000324/1987011

From kanterella
Revision as of 12:44, 20 March 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-325/87-11 & 50-324/87-11
ML20235U458
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 07/14/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8707220490
Download: ML20235U458 (1)


Text

. .-_ ._-

__ - _ _ _ _ _ . ..

JUL 141987 Car,olina Power and Light Company ()TTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT: REPORT N0. 50-325,324/87-11 Thank you for your response of July 1,1987 to our Notice of Violation, issued'

on June 1, 1987, concerning activities conducted at your Brunswick facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte '

Sincerely, Original Signed by Luis A. Reyes Luis A. Reyes, Director Division of Reactor Projects cc: @ W. Howe, Vice President Brunswick Nuclear Project G: R. Dietz, Plant General Manager bec: LNRC Resident Inspector i Document Control Desk State of North Carolina RI RII RII

,o h g/

Vias:vyg P re ickson DVerrelli hBrownlee 7/3/87 7/;3 /87 7/jp/87 7/ fy87 870 220490 870714 4 gb PDR ADOCK 0500 G

Id e/ ,