Forwards SE Authorizing Relief Requests CIP-01,02,06,07,08, 09,10,11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Requests CIP-04 & 05 Would Result in Hardship,Relief CIP-03 Not Required & CIP-11 Denied in Part
ML20210P891
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/10/1999
From: Peterson S
NRC (Affiliation Not Assigned)
To: Keenan J
CAROLINA POWER & LIGHT CO.
Shared Package
ML20210P896 List:
References
TAC-MA4166, TAC-MA4167, NUDOCS 9908130103
Download: ML20210P891 (3)


Text

4 August 10, 1999 Mr. J. S. Keenan, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company --

. Post Office Box 10429 Southport, North Carolina 28461

SUBJECT:

EVALUATION OF RELIEF REQUESTS CIP-01 TO CIP lMPLEMENTATION OF SUBSECTIONS IWE AND IWL OF ASME SECTION XI FOR CONTAINMENT INSPECTION FOR CAROLINA POWER AND LIGHT COMPANY'S BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 (TAC NOS. MA4166 AND MA4167) l

Dear Mr. Keenan:

l The NRC staff has reviewed the subject relief requests. Based on the information provided in

- the relief requests, and in response to the staff's questions, the staff concludes that for Request for Relief Nos. CIP-01,02,06,07,08,09,10,11 (with certain exceptions), 12,13,14, 15,16,17 and 18 the licensee's proposed attematives will provide an acceptable level of quality and safety. Therefore, these proposed attematives may be authorized for the second 10-year inservice inspection interval pursuant to 10 CFR 50.55a(a)(3)(i). For Requests for Relief Nos. CIP-04 and 05, the staff concludes that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Therefore, these proposed altematives may be authorized pursuant to 10 CFR 50.55(a)(3)(ii). Proposed Request for Relief No. CIP-03 has been reviewed and found to be not required. ' Proposed Relief Request No. CIP-11 is denied in part. The enclosure contains the staff's evaluation.

Sincerely, Original signed by:

Sheri R. Peterson, Chief, Section 2 Project Directorate 11 Division of Licensing Project Management Docket Nos. 50-324 and 50-325 f

Enclosure:

As stated 1

cc w/ encl: See next page Distribution: \

' Docket Filet

  • AHansen EDunnington MSatorius, Ril O1 PUBLIC EMEB R/F Elmbro KCotton KManoly. SPetersen1 OGC ACRS

~ RScholl (e-mail SE)

DOCUMENT NAME: G:\PDll-2\ BRUNSWICK \MA4166.WPD *See previous concurrence To seenive a ese r of this doounient, lnd cate in the ben: 'C' = Copy without attachment / enclosure 'E" = Copy with attachment / enclosure 'N' = No copy OFFICE PDil-2\PM _ . 6 PDll-2\LA E PDil-2\SC C *OGC *PDil/D f4AME AHanseng81 EDunnington 8TD SPeterson@.~/l41 HBerkow DATE 08/A/99 " 08//099- 084C/99 08/5/99 08/9/99 OFFICIAL RECORD COPY 9908130103 990810

g8 880 09

[t fi[\j

. UNITED STAT Et, j ,.

NUCLEAR REGULATORY COMMISSION g . 7. ,.

f WASHINGTON, D.C. 2055W1

%, U. . . . . p# August 10, 1999 Mr. J. S. Keenan, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461

SUBJECT:

EVALUATION OF RELIEF REQUESTS CIP-01 TO CIP lMPLEMENTATION OF SUBSECTIONS IWE AND IWL OF ASME SECTION XI FOR '

CONTAINMENT INSPECTION FOR CAROLINA POWER AND LIGHT l COMPANY'S BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 (TAC NOS. MA4166 AND MA4167)

Dear Mr. Keenan:

The NRC staff has reviewed the subject relief requests. Based on the information provided in the relief requests, and in response to the staff's questions, the staff concludes that for Request for Relief Nos. CIP-01,02,06,07,08,09,10,11 (with certain exceptions), 12,13,14, 15,16,17 and 18, the licensee's proposed attematives will provide an acceptable level of quality and safety. Therefore, these proposed alternatives may be authorized for the second 10-yearinservice inspection interval pursuant to 10 CFR 50.55a(a)(3)(i). For Requests for Relief Nos. CIP-04 and 05, the staff concludes that compliance with the specified requirements 1 would result in hardship or unusual difficulty without a compensating increase in the level of f quality and safety. Therefore, these proposed alternatives may be authorized pursuant to l 10 CFR 50.55(a)(3)(ii). Proposed Request for Relief No. CIP-03 has been reviewed and found I to be not required. Proposed Relief Request No. CIP-11 is denied in part. The enclosure contains the staff's evaluation. I Sincerely, j j l l f l Sheri R. Peterson, Chief, ection 2 Project Directorate 11 l Division of Licensing Project Management j Docket Nos. 50-324 and 50-325 '

Enclosure:

As stated cc w/ encl: See next page I

O Mr. J. S. Keenan Brunswick Steam Electric Plant Carolina Power & Light Company Units 1 and 2 cc:

Mr. William D. Johnson Ms. Karen E. Long Vice President and Corporate Secretary Assistant Attomey General Carolina Power & Light Company State of North Carolina Post Office Box 1551 Post Office Box 629 Raleigh, North Carolina 27602 Raleigh, North Carolina 27602 l

4 Mr. Jerry W. Jones, Chairman Mr. Robert P. Gruber Brunswick County Board of Commissioners Executive Director Post 04 ice Box 249 Public Staff - NCUC Bolivia, North Carolina 28422 Post Office Box 29520 Raleigh, North Carolina 27626-0520 Resident inspector U.S. Nuclear Regulatory Commission 8470 River Road Director Southport, North Carolina 28461 Site Operations Brunswick Steam Electric Plant j Mr. John H. O'Neill, Jr. Post Office Box 10429 Shaw, Pittman, Potts & Trowbridge Southport, North Carolina 28461 2300 N Street, NW.

Washington, DC 20037-1128 l Mr. William H. Crowe, Mayor City of Southport '

Mr. Mel Fry, Director 201 East Moore Street Division of Radiation Protection Southport, North Carolina 28461 N.C. Department of Environment and Natural Resources Mr. Dan E. Summers 3825 Barrett Dr. Emergency Management Coordinator

' Raleigh, North Carolina 27609-7721 New Hanover County Department of Emergency Management Mr. J. J. Lyash Post Office Box 1525 ,

Plant Manager Wilmington, North Carolina 28402 Carolina Power & Light Company-Brunswick Steam Electric Plant Mr. Terry C. Morton Post Office Box 10429 Manager Southport, North Carolina 28461 Performance Evaluation and Regulatory Affairs CPB 7 Public Service Commission Carolina Power & Light Company State of South Carolina Post Office Box 1551 Post Office Drawer 11049 Raleigh, North Carolina 27602-1551 Columbia, South Carolina 29211 Mr. K. R. Jury

' Manager- Regulatory Affairs Carolina Power & Light Company Post Office Box 10429 Southport, NC 28461-0429

! ,