Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl
ML20211F062
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/20/1999
From: Jury K
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-99-0132, GL-96-06, TAC-M96787, TAC-M96788, NUDOCS 9908300213
Download: ML20211F062 (3)


Text

a

  • ,. 1

)

l C _P&L Carolina Power & Light Company P.o. Box 10429 Southport, NC 28461 0429 AUG 2 01999 SERIAL: BSEP99-0132 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

. BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324/ LICENSE NOS. DPR-71 AND DPR-62 STATUS OF INDUSTRY EFFORT REGARDING GENERIC LETTER 96-06, " ASSURANCE OF EQUIPMENT OPERABILITY AND CONTAINMENT INTEGRITY DURING DESIGN-BASIS ACCIDENT CONDITIONS" (TAC NOS. M96787 AND M96788)

Gentlemen:

Byletterdated April 13,1998, the NRC requested additional information regarding Carolina Power & Light (CP&L) Company's response to Generic Letter 96-06, " Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions," for the Brunswick Steam Electric Plant (BSEP), Unit Nos. I and 2. CP&L responded to this request by letters dated May 17,1998 (Serial: BSEP 98-0110), and July 30,1998 (Serial: BSEP 98-0154).

The July 30,1998, letter stated that CP&L will be participating in an industry collaborative project with the Electric Power Research Institute (EPRI) and the Nuclear Energy Institute (NEI) to develop a generic technical basis to address the request for additional information related to the waterhammer issue. In the July 30,1998, letter, CP&L committed to providing an update on intended actions with respect to the EPRI/NEI effort by August 27,1999. At this time, the '

results of the EPRl/NEI effort have not yet been submitted to the NRC. CP&L requests a delay in providing an update on intended actions until 180 days after NRC approval of the generic technical basis. ,

The enclosure to this letter provides a list of regulatory commitments being made in this submittal. Please refer any questions regarding this submittal to Mr. Warren J. Dorman, ,

Supervisor - Licensing, at (910) 457-2068. jl

'N Since ely, pP '

.QD oue 4 Keith R. Ju'ry Manager - Regulatory Affairs

. Bmnswick Steam Electric Plant PDR ADOCK 05000324' P PDR

Document Control Desk BSEP 99-0132 / Page 2 1

KMN/kmn

Enclosure:

List of Regulatory Commitments cc:

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr.Luis A.Reyes, Regional Administrator I

Atlanta Federal Center.

61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-3415 U. S. Nuclear Regulatory Commission ATTN: Mr. Theodore A. Eastick, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission ATTN: Mr. Allen G. Hansen (Mail Stop OWFN 8G9) 11555 Rockville Pike Rockville, MD 20852-2738 l Ms. Jo A. Sanford Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 l

l l

l 1

ENCLOSURE BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 >

DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 l STATUS OF INDUSTRY EFFORT REGARDING GENERIC LETTER 96-06, " ASSURANCE OF EQUIPMENT OPERABILITY AND CONTAINMENT INTEGRITY DURING DESIGN-BASIS ACCIDENT CONDITIONS" (TAC NOS. M96787 AND M96788)

LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Carolina Power & Light (CP&L)

Company in this docurnent. Any other actions discussed in the submittal represent intended or planned actions by CP&L. They are described for the NRC's information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs at the Brunswick Steam Electric Plant of any questions regarding this document or any associated regulatory commitments.

Committed Commitment date or outage CP&L will provide an update on intended actions with respect to the 180 days after industry collaborative project with the Electric Power Research Institute NRC approval and NLclear Energy Institute 180 days after NRC approval of the generic of the generic technical basis. technical basis 1

)