Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 2
ML20211F988
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/25/1999
From: Jury K
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211F993 List:
References
BSEP-99-0148, NUDOCS 9908310122
Download: ML20211F988 (3)


Text

[ ,, )

l

. CP&L C na Light Company

! P.o. Box 10429 Southport, NC 28481-0429 l AUG 2 51999 SERIAL: BSEP99-0148 U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-324/ LICENSE NO. DPR-62 CYCLE 14 STARTUP REPORT Gentlemen:

In accordance with Section 13.4.2.1 of the Updated Final Safety Analysis Report (UFSAR) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. I and 2, Carolina Power & Light Company is submitting this Cycle 14 startup report for BSEP, Unit 2.

During BSEP, Unit 2 Refueling Outage 13 (i.e., B214RI), CP&L loaded four ATRIUM-10 lead qualification assemblies manufactured by Siemens Power Corporation. UFSAR Section 13.4.2.1 states that a summary report of plant stanup and power escalation testing will be submitted following installation of fuel that has a different design or has been manufactured by a different fuel supplier. The enclosed startup report has been prepared to satisfy UFSAR Section 13.4.2.1, and addresses the tests identified in Section 14.4.1 of the UFSAR.

Please refer any questions regarding this submittal to Mr. Warren J. Dorman, Supervisor -

Licensing, at (910) 457-2068.

Sincerely, l

'L .

Keith R. Jury -

Manager-Regulatory Affairs Brunswick Steam Electric Plant f

, f 9908310122 990825 PDR ADOCK 05000324 4 h[,M l p PDR WRM/wrm

Enclosure:

Bmnswick Unit 2, Cycle 14 Neutronics Startup Report L-

r:

1

[ .. ,

4 l

i Document Control Desk l BSEP 99-0148 / Page 2 cc (with enclosure):

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A.Reyes, Regional Administrator Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-3415 U. S. Nuclear Regulatory Commission ATTN: Mr. Theodore A. Eastick, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission ATTN: Mr. Allen G. Hansen (Mail Stop OWFN 8G9) 11555 Rockville Pike Rockville, MD 20852-2738 Ms.Jo A. Sanford l Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh NC 27626-0510 l

l

)

ENCLOSURE BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-324/ LICENSE NO. DPR-62 CYCLE 14 STARTUP REPORT l l

l l

l I

i 1

l Brunswick Unit 2. Cycle 14 Neutronics Startup Report

]

l l

l l

)