ML20236U523

From kanterella
Revision as of 21:58, 19 March 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Re Pentucket Regional School Committee Position Per Emergency Planning Has Been Forwarded to FEMA for Evaluation of Offsite Emergency Preparedness. Public Hearing Will Be Held Before Full Power Operation
ML20236U523
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 11/27/1987
From: Congel F
Office of Nuclear Reactor Regulation
To: Jenkins T
WEST NEWBURY, MA
References
NUDOCS 8712030116
Download: ML20236U523 (1)


Text

- _ _ _ _ -

[0-W3 NOV 2 71987 Thomas F. Jenkins, Ed.D.

Superintendent Pentucket Regional School District 694 Main Street West Newbury, Massachusetts 01985.

l Dear Dr. Jenkins-

  • Thank you for your letter of November 2,1987, in which the Pentucket Regional School Committee clarified its position regarding emergency planning for the Seabrook Nuclear Power Station, i

As you may know, the Nuclear Regulatory Commission is responsible for assessing ,

I the adequacy of onsite emergency plans developed. by nuclear power plant licen-

! sees and for making the final licensing determination. The Federal Emergency Management Agency (FEMA) has been assigned the responsibility for assessing the adequacy of offsite emergency preparedness of areas surrounding nuclear 5 power plants. Accordingly, a copy of your November 2,1987 letter is being I furnished to FEMA for information and consideration in their evaluation of Seabrook offsite emergency preparedness, in addition, a copy of your letter was forwarded by Chief Administrative Judge B. Paul Cotter to the Seabrook Atomic Safety and Licensing Board which has jurisdiction over the matter. A public hearing similar to that being conducted for -the New Hampshire offsite plan will be held to adjudicate any contentions related to emergency planning for Massachusetts before full-power operation of the Seabrook facility will be permitted.

4 Sincerely, 1

Original signed by LeMoine J. Cunningham rank J. Con Division of kel, Director adiation Protection and Emergency Preparedness Office of Nuclear Reactor Regulation cc w/ incoming letter: DISTRIBUTION:

R. W. Krimm, FEMA TEMurley, NRR WTRussell, RI JHSniezek, NRR FKantor, NRR FJMiraglia, NRR VNerses, NRR RWStarostecki, NRR DJPerrotti, NRR 71203o3h ADO $ 127 FJCongel, NRR EJReis, OGC k DBMatthews, NRR RJBarrett, NRR SETurk, 0GC RRBellamy, RI LJCunningham, NRR WJLazarus, RI CRVan Niel, NRR Centra 11 Files /

FKantor, NRR PEPB'R/F' '

h, VNer es, NR PDR B/NRR Pk0 RR C/ /hRR / ft JPerrotti:s FKantor D tthews FJ' n el 11/d/87 '11/g/87 11/%/87 1/g 87 C- - - - - _ - - - - - - - - - - - - - - - -i