Forwards Application for Amend to License NPF-3,revising Tech Spec Section 3/4.3.3.6 & Table 3.3-10 Re post-accident Monitoring & Combustible Gas Control
ML20246D357
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/21/1989
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20246D360 List:
References
1661, TAC-73242, NUDOCS 8908280022
Download: ML20246D357 (2)


Text

,__

.y-Q $8' E

h!

TOLEDO EDISON A Centowr EnerDy Company DONAU) C;. SHELTON va pre ==-euu.c

[419)240'2333 Docket Number 50-346 License Number NPF-3 Serial Number 1661 1 August 21, 1989

' United States. Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555 Subj ect :, License Amendment Application to Revise the Post-Accident Monitoring

and Combustible Gas Control - Hydrogen Analyzers Technical Specifications (TAC Number 73242)

~ Gentlemen:

The enclosed application requests that the Davis-Besse Nuclear Power Station, Unit No. 1 Operating License, Appendix A, Technical Specifications and associated Bases be revised to reflect the changes attached. 'The proposed changes involve Section 3/4.3.3.6, Post-Accident Instrumentation,. Table 3.3-10,. Post-Accident Monitoring Instrumentation, Table 4.3-10, Post-Accident Monitoring Instrumentation Surveillance Requirements; Section 3/4.6.4.1, Combustible Gas Control - Hydrogen Analyzers; Bases Section 3/4.3.3.6, Post-Accident Instrumentation; and Bases Section 3/4.6.4, Combustible Gas Control.

This request proposes the removal of all line items using the term " status" in Tables 3.3-10 and 4.3-10. To eliminate an inconsistency in the mode applicability for the hydrogen analyzers, the application proposes the removal

-of the line item on containment vessel hydrogen from Tables 3.3-10 and 4.3-10 and the addition of a monthly Channel Check to Specification 3/4.6.4.1. In addition, several administrative changes have been made for clarification purposes.

This request is a result of Toledo Edison's Technical Specification Verification Program - Phase II commitment to the Nuclear Regulatory Commission (NRC) to perform a review of its Technical Specifications and propose appropriate changes.

8908280022 890821 PDR ADOCK 05000346 nAool' P PDC

  • r THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 e . _ .

- - _ _ _ _ _ _ _ _____________.__________j

i

.Dockst Numb:r 50-346 Liccn2 Number NPF-3. )

+- S rial Number 1661  ;

Page 2 )

{

Toledo Edison requests'that this amendment be issued by the NRC by January. 31, 1990.

Very truly yours, s

GBK/dlm i

Enclosure cc: P. M. Byron, DB-1 NRC Resident Inspector

, A. B. Davis, Regional Administrator, NRC Region III 3 T. V. Vambach, DB-1 NRC Senior Project Manager i State of Ohio i l'

l l

l L

1 i l I l L.

)

E_____---._--_--. i