Forwards Insp Repts 50-454/98-13 & 50-455/98-13 on 980415- 0508 & Notice of Violation.Insp Consisted of Review of Investigation Results Sent to NRC Region III by
ML20248B088
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/26/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Graesser K
COMMONWEALTH EDISON CO.
Shared Package
ML20248B091 List:
References
50-454-98-13, 50-455-98-13, NUDOCS 9806010177
Download: ML20248B088 (3)


See also: IR 05000454/1998013

Text

.

...

May 26, 1998

Mr. K. Graesser

Site Vice President

Byron Nuclear Power Station

Commonwealth Edison Company

4450 North German Church Road

Byron,IL 61010 :

SUBJECT: BYRON SECURITY INSPECTION REPORTS 50-454/98013(DRS);

50-455/98013(DRS) AND NOTICE OF VIOLATION

Dear Mr. Graesser:

On May 8,1998, the NRC completed an inspection of your investigation for Fitness-For-Duty

(FFD) concems at the Byron station. Areas examined are identified in the report. The

inspection consisted of a review of the investigation results sent to NRC Region 111 by your letter

dated March 9,1998. Additionally, other documents pertaining to the FFD issues were

requested and reviewed as part of the inspection process. The objective of the inspection effort

was to determine whether activities authorized by the license were conducted safely and in .

accordance with NRC requirements.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occurred. The violation is cited in the enclosed Notice of Violation and is of

concem primarily because it involved two instances in which three individuals did not fulfill their

FFD responsibilities in a timely manner, which caused unnecessary delays in addressing

potential FFD concems.

The NRC has concluded that information regarding the reason for the violation, the corrective

actions taken and planned to correct the violation and prevent recurrence is addressed in

Section S8 of the Report Details. Therefore, you are not required to respond to this letter

unless the information in Section S8 of the Report Details does not accurately reflect your

[ '

corrective actions or your position, or if you choose to provide additional information. I

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

' enclosure will be placed in the NRC Public Document Room (PDR).

"

9806010177 990526

PDR ADOCK 05000454

G PDR_ ,

I

- - __ - - - - _ - - - __----__ _ - - _ _ -

- - - . - - _ _ _ - . _ , _ _ _ _ - - _ - - _ - - - _ - _ ,

--

l

l

K. Graesser 2

We will gladly discuss any questions you have conceming this inspection.

Sincerely,

Original Signed by John A. Grobe

John A. Grobe, Director

Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosures: 1. Notice of Violation

2. Inspection Reports 50-454/98013(DRS); 50-455/98013(DRS)

cc w/encls: O. Kingsley, President, Nuclear

Generation Group 1

M. Wallace, Senior Vice President

{

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory

Services Manager

1. Johnson, Licensing Director .

DCD - Licensing l

'

K. Kofron, Station Manager

D. Brindle, Regulatory Assurance

Supervisor

R. Hubbard, MHB Technical Associates

N. Schloss, Economist

Office of the Attomey General

State Liaison Officer

State Liaison Officer, Wisconsin

Chairman, Illinois Commerce

Commission

DOCUMENT NAME: G:DRS\BYR98013.DRS 1

v. . - w c co m . - - e.co . - . r.me. 1

OFFICE Rlli l9, Nb/ l @ Rlil ,1 s Rill 4V

NAME GPirtle:Jp6 JCr W MJordan # !/// JGrobCfW l

DATE 05Ar#98 05f/898 05M98 /' 05/1998

OFFICIAL RECORD COPY

!

. _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ ,_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ .___ . . _ _ _ _ _ _ . _ - _ .

.

l

K. Graesser 3

l Distnbution-

! SAR (E-Mail)

'

Project Mgr., NRR w/enci

. A. Beach, Rlll w/enci

J. Caldwell, Rllt w/ encl

B. Clayton, Rlll w/enci

SRI Byron w/enci

DRP w/ encl

TSS w/enci

DRS w/ enc!

f I

,

Rlli PRR w/er)61

PUBLIC IE l 4-w/enci -

Docket File /enci '

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

j

i

i

.

]

'!90034

i

u_.___________ . _ _ _ _ . . _ m _ _ . _ _ _ _ _ _ _ . _ _ _ _ . . _.

.j