May 26, 1998
Mr. K. Graesser
Site Vice President
Byron Nuclear Power Station
Commonwealth Edison Company
4450 North German Church Road
Byron,IL 61010 :
SUBJECT:
BYRON SECURITY INSPECTION REPORTS 50-454/98013(DRS);
50-455/98013(DRS) AND NOTICE OF VIOLATION
Dear Mr. Graesser:
On May 8,1998, the NRC completed an inspection of your investigation for Fitness-For-Duty
(FFD) concems at the Byron station. Areas examined are identified in the report. The
inspection consisted of a review of the investigation results sent to NRC Region 111 by your letter
dated March 9,1998. Additionally, other documents pertaining to the FFD issues were
requested and reviewed as part of the inspection process. The objective of the inspection effort
was to determine whether activities authorized by the license were conducted safely and in .
accordance with NRC requirements.
Based on the results of this inspection, the NRC has determined that a violation of NRC
requirements occurred. The violation is cited in the enclosed Notice of Violation and is of
concem primarily because it involved two instances in which three individuals did not fulfill their
FFD responsibilities in a timely manner, which caused unnecessary delays in addressing
potential FFD concems.
The NRC has concluded that information regarding the reason for the violation, the corrective
actions taken and planned to correct the violation and prevent recurrence is addressed in
Section S8 of the Report Details. Therefore, you are not required to respond to this letter
[
'
unless the information in Section S8 of the Report Details does not accurately reflect your
corrective actions or your position, or if you choose to provide additional information.
I
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
' enclosure will be placed in the NRC Public Document Room (PDR).
"
9806010177 990526
ADOCK 05000454
G
PDR_
,
I
-
-
__
- - -
-
_ - - - __----__ _ -
- _ _ -
- - - . - - _ _ _ - . _ , _ _ _ _ - - _ - - _ - - - _ - _ ,
--
l
l
K. Graesser
2
We will gladly discuss any questions you have conceming this inspection.
Sincerely,
Original Signed by John A. Grobe
John A. Grobe, Director
Division of Reactor Safety
Docket Nos. 50-454; 50-455
Enclosures:
2. Inspection Reports 50-454/98013(DRS); 50-455/98013(DRS)
cc w/encls:
O. Kingsley, President, Nuclear
Generation Group
1
M. Wallace, Senior Vice President
{
D. Helwig, Senior Vice President
G. Stanley, PWR Vice President
J. Perry, BWR Vice President
D. Farrar, Regulatory
Services Manager
1. Johnson, Licensing Director
DCD - Licensing
.
l
'
K. Kofron, Station Manager
D. Brindle, Regulatory Assurance
Supervisor
R. Hubbard, MHB Technical Associates
N. Schloss, Economist
Office of the Attomey General
State Liaison Officer
State Liaison Officer, Wisconsin
Chairman, Illinois Commerce
Commission
DOCUMENT NAME: G:DRS\\BYR98013.DRS
1
v.
.
- w c co m . - -
e.co
. - . r.me.
1
OFFICE
Rlli
l9, Nb/ l @
Rlil
,1 s
Rill
NAME
GPirtle:Jp6
JCr W
MJordan # !///
JGrobCfW
l
DATE
05Ar#98
05f/898
05M98
/'
05/1998
OFFICIAL RECORD COPY
!
. _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ ,_
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _
.___
. . _ _ _ _ _ _ .
_ - _ .
.
l
K. Graesser
3
l
Distnbution-
!
SAR (E-Mail)
Project Mgr., NRR w/enci
'
. A. Beach, Rlll w/enci
J. Caldwell, Rllt w/ encl
B. Clayton, Rlll w/enci
SRI Byron w/enci
DRP w/ encl
TSS w/enci
DRS w/ enc!
f
,
Rlli PRR w/er)61
I
l
PUBLIC IE 4-w/enci
-
Docket File /enci
'
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
j
i
i
.
]
'!90034
i
u_.___________
. _ _ _ _ . . _
m
_ _ . _ _ _ _ _ _ _ . _ _ _ _ . .
_.
.j