Category:INSPECTION REPORT
MONTHYEARIR 05000219/19980121999-03-0404 March 1999 Insp Rept 50-219/98-12 During Periods 981214-18,990106-07 & 20-22.No Violations Identified.Major Areas Inspected: Review of Licensee self-assessment of Plant Environ Qualification Program & Corrective Actions for Open Items IR 05000219/19980091998-11-25025 November 1998 Insp Rept 50-219/98-09 on 980914-1025.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000219/19980081998-10-20020 October 1998 Insp Rept 50-219/98-08 on 980727-0913.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19980051998-08-26026 August 1998 Insp Rept 50-219/98-05 on 980614-0726.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000219/19980071998-07-0202 July 1998 Insp Rept 50-219/98-07 on 980615-19.No Violations Noted. Major Areas Inspected:Status of Plant motor-operated Valve Program to Determine Acceptability for Closure of NRC Review Under GL 89-10 ML20217F6641998-04-22022 April 1998 Insp Rept 50-219/98-80 on 980223-0313 & 0330-0402.Violations Noted.Major Areas Inspected:Engineering ML20216H1911998-04-15015 April 1998 Insp Rept 50-219/98-04 on 980226-0318.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000219/19970081997-12-0404 December 1997 Insp Rept 50-219/97-08 on 971020-24.No Violations Noted. Major Areas Inspected:Onsite Emergency Plan IR 05000219/19970041997-07-29029 July 1997 Insp Rept 50-219/97-04 on 970526-0706.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000219/19970051997-07-17017 July 1997 Insp Rept 50-219/97-05 on 970407-11.No Violations Noted. Major Areas Inspected:Engineering ML20141G9431997-07-0303 July 1997 Insp Rept 50-219/97-03 on 970414-0525.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000219/19970021997-05-19019 May 1997 Insp Rept 50-219/97-02 on 970224-0413.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20137E9491997-03-21021 March 1997 Insp Rept 50-219/97-01 on 970113-0223.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19960101996-09-27027 September 1996 Insp Rept 50-219/96-10 on 960923-27.No Violations Noted. Major Areas Inspected:Radiological Source Term Assessment, Results of Exposure Reduction Initiatives & Evidence of Station ALARA Program IR 05000219/19960111996-01-0202 January 1996 Insp Rept 50-219/96-11 on 961021-1201.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19930811993-12-22022 December 1993 Insp Rept 50-219/93-81 on 930927-1015.Violations Noted.Major Areas Inspected:Engineering,Maint,Surveillance & Mgt & Corrective Actions IR 05000219/19930261993-11-18018 November 1993 Insp Rept 50-219/93-26 on 931101-05.No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Access Control of Personnel & Packages & Vehicles IR 05000219/19930241993-11-18018 November 1993 Insp Rept 50-219/93-24 on 930921-1101.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering,Plant Support,Including Security & Emergency Preparedness & Safety Assessment/Quality Verification ML20058A3791993-11-12012 November 1993 Insp Rept 50-219/93-23 on 931018-20.Onsite Response to Exercise Scenario Was Good.Major Areas inspected:full- Participation Ingestion Pathway Emergency Preparedness Exercise IR 05000219/19930251993-11-0909 November 1993 Insp Rept 50-219/93-25 on 931018-22.No Violations Noted. Major Areas Inspected:Design Mods & Engineering Support IR 05000219/19930181993-10-28028 October 1993 Insp Rept 50-219/93-18 on 930823-1020.No Violations Noted. Major Areas Inspected:Alara,Rirs,Qa Audits,Air & Swipe Sample Counting Facilities & Radiological Controls Organization Professional Staffing ML20059F6251993-10-28028 October 1993 Insp Rept 50-219/93-22 on 930920-24.No Violations Noted. Major Areas Inspected:Addressed Open Items Associated W/Eop & Reviewed Licensee Actions in Response to Violations Associated W/Recirculation Loop Isolation Event IR 05000219/19930201993-10-19019 October 1993 Insp Rept 50-219/93-20 on 930816-930917.No Violations Noted. Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs Including Mgt Controls & QA Audits IR 05000219/19930211993-10-15015 October 1993 Insp Rept 50-219/93-21 on 930810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000219/19930111993-09-10010 September 1993 Insp Rept 50-219/93-11 on 930629-0809.No Violations Noted. Major Areas Inspected:Day Shift & Back Shift Hours of Station Activities IR 05000219/19930191993-09-0909 September 1993 Insp Rept 50-219/93-19 on 930816-20.Violations Noted.Major Areas Inspected:Radiological Environ Monitoring Program & Meteorological Monitoring Program IR 05000219/19930141993-09-0202 September 1993 EP Insp Rept 50-219/93-14 on 930802-05.Concerns Noted. Major Areas Inspected:Epip,Equipment,Instrumentation & Supplies IR 05000219/19930161993-08-27027 August 1993 Insp Rept 50-219/93-16 on 930726-30.Major Areas Inspected: Erosion/Corrosion Insp Program,Per GL 89-08.Program & Program Implementation Generally Good.Staff Responsible for Program Development & Implementation Qualified IR 05000219/19930121993-08-26026 August 1993 Insp Rept 50-219/93-12 on 930706-09.No Violations Noted. Major Areas Inspected:Licensee Progress in Incorporating EQ Component Info Into GMS2 Computer Database IR 05000219/19920221993-03-19019 March 1993 Mobile NDE Lab Insp 50-219/92-22 on 921207-11 & 930111-15. No Violations Noted.Major Areas Inspected:Cs,Css,Sdc,Ms & FW Sys IR 05000219/19920251993-02-10010 February 1993 Insp Rept 50-219/92-25 on 921215-930118.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Maint & Surveillance,Engneering & Technical Support, Emergency Preparedness & Security IR 05000219/19930011993-01-29029 January 1993 Insp Rept 50-219/93-01 on 930104-08.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Postings & Other in Plant Radiological Controls,Work in Progress, Housekeeping & Self Reading Dosimeter Use IR 05000219/19920231992-12-24024 December 1992 Insp Rept 50-219/92-23 on 921103-1214.No Violations Noted. Major Areas Inspected:Plant Operations,Security & Safety Assessment/Quality Verification IR 05000219/19910041991-03-0101 March 1991 Partially Withheld Insp Rept 50-219/91-04 on 910204-07.No Violations Noted.Major Areas Inspected:Protected Area Physical Barriers,Isolation Zones & Lighting,Protected Area Access Control of Personnel & Security Training IR 05000219/19900191990-11-16016 November 1990 Insp Rept 50-219/90-19 on 900923-1020.Violations Noted. Areas Inspected:Radiological Protection,Surveillance & Maintenance,Emergency Preparedness,Security,Engineering & Technical Support & Safety Assessment/Quality Verification IR 05000219/19900201990-11-0202 November 1990 Insp Rept 50-219/90-20 on 901022-26.No Violations Noted. Major Areas Inspected:Internal Exposure Control & Review of Procedures for Drywell Occupancy During Fuel Movement IR 05000219/19900161990-10-18018 October 1990 Insp Rept 50-219/90-16 on 900823-0922.Violations Noted.Major Areas Inspected:Observation of Plant Activities,Review of Operational Events,Operation of Turbine Bldg Ventilation Sys & Walkdown of Emergency Diesel Fuel Oil Transfer Sys ML20058F3241990-10-0202 October 1990 Insp Rept 50-219/90-17 on 900918-21.No Violations Noted. Major Areas Inspected:Transportation & Solid Radwaste Programs IR 05000219/19900151990-09-20020 September 1990 Partially Withheld Safeguards Insp Rept 50-219/90-15 on 900820-24 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Support,Security Program Plans,Audits,Protected & Vital Areas Physical Barriers,Power Supply & Testing IR 05000219/19900111990-08-15015 August 1990 Insp Rept 50-219/90-11 on 900610-0711.Noncited Violation Noted.Major Areas Inspected:Observation & Review of Plant Operations,Review of Radiological Controls & Routine Observations of Maint Activities & Surveillance Tests ML20056A6191990-07-19019 July 1990 Insp Rept 50-219/90-09 on 900422-0609.Violations Noted. Major Areas Inspected:Observation & Review of Routine Plant Activities & Operational Events,Site Radiological Controls & Events & Observations of Corrective Maint Activities IR 05000219/19890291990-02-16016 February 1990 Insp Rept 50-219/89-29 on 891203-900106.Major Areas Inspected:Observation & Review of Plant Operational Events, Condenser Vacuum Transient,Unusual Events Due to Low Intake Water Level & Simultaneous Movement of Two Control Rods IR 05000219/19890181989-09-13013 September 1989 Insp Rept 50-219/89-18 on 890724-28.No Violations Noted. Major Areas Inspected:Review of Licensee Actions on Previous NRC Concerns,Atws Rule Implementation,Procurement Control & non-licensed Operators Training IR 05000219/19890201989-09-0707 September 1989 Insp Rept 50-219/89-20 on 890829-30.No Exercise Weaknesses Noted.Major Areas Inspected:Licensee Emergency Preparedness Exercise Conducted on 890829-30 ML20246J6261989-08-18018 August 1989 Insp Rept 50-219/89-16 on 890702-29.Violations Noted.Major Areas Inspected:Plant Operational Events,Control of High Radiation Areas,Evaluation of Plant Operation W/High Canal Water Temps & Security Response to Vital Area Door Problem IR 05000219/19890191989-08-15015 August 1989 Insp Rept 50-219/89-19 on 890802-04.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys & Transportation Programs,Including Mgt Controls,Audits,Qa & Implementation of Subj Programs IR 05000219/19890151989-08-0909 August 1989 Insp Rept 50-219/89-15 on 890627-30.No Violations Noted. Major Areas Inspected:Organization & Qualifications of Radiological Controls Personnel in Site Organization IR 05000219/19890141989-08-0303 August 1989 Insp Rept 50-219/89-14 on 890604-0701.No Violations Noted. Major Areas Inspected:Core Spray Booster Pump Trips,Under Voltage Relay Failure,Monthly Surveillance Observations, Emergency Svc Water Pump Operability & Oyster Creek Drawing IR 05000219/19890111989-07-25025 July 1989 Insp Rept 50-219/89-11 on 890606-08.Major Areas Inspected: Emergency Preparedness Insp of full-participation Exercise of Licensee Emergency Plan Conducted on 890607.Exercise Did Not Meet Requirements for Annual Test of Emergency Plan IR 05000219/19890121989-07-21021 July 1989 Insp Rept 50-219/89-12 on 890430-0603.Violations Noted.Major Areas Inspected:Plant Operational Events Including Three Reactor Startups & Licensee Corrective Actions Re Reactor Coolant Pressure Boundary Hangers Being Pinned 1999-03-04
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000219/19980121999-03-0404 March 1999 Insp Rept 50-219/98-12 During Periods 981214-18,990106-07 & 20-22.No Violations Identified.Major Areas Inspected: Review of Licensee self-assessment of Plant Environ Qualification Program & Corrective Actions for Open Items IR 05000219/19980091998-11-25025 November 1998 Insp Rept 50-219/98-09 on 980914-1025.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000219/19980081998-10-20020 October 1998 Insp Rept 50-219/98-08 on 980727-0913.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19980051998-08-26026 August 1998 Insp Rept 50-219/98-05 on 980614-0726.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000219/19980071998-07-0202 July 1998 Insp Rept 50-219/98-07 on 980615-19.No Violations Noted. Major Areas Inspected:Status of Plant motor-operated Valve Program to Determine Acceptability for Closure of NRC Review Under GL 89-10 ML20217F6641998-04-22022 April 1998 Insp Rept 50-219/98-80 on 980223-0313 & 0330-0402.Violations Noted.Major Areas Inspected:Engineering ML20216H1911998-04-15015 April 1998 Insp Rept 50-219/98-04 on 980226-0318.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000219/19970081997-12-0404 December 1997 Insp Rept 50-219/97-08 on 971020-24.No Violations Noted. Major Areas Inspected:Onsite Emergency Plan IR 05000219/19970041997-07-29029 July 1997 Insp Rept 50-219/97-04 on 970526-0706.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000219/19970051997-07-17017 July 1997 Insp Rept 50-219/97-05 on 970407-11.No Violations Noted. Major Areas Inspected:Engineering ML20141G9431997-07-0303 July 1997 Insp Rept 50-219/97-03 on 970414-0525.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000219/19970021997-05-19019 May 1997 Insp Rept 50-219/97-02 on 970224-0413.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20137E9491997-03-21021 March 1997 Insp Rept 50-219/97-01 on 970113-0223.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19960101996-09-27027 September 1996 Insp Rept 50-219/96-10 on 960923-27.No Violations Noted. Major Areas Inspected:Radiological Source Term Assessment, Results of Exposure Reduction Initiatives & Evidence of Station ALARA Program IR 05000219/19960111996-01-0202 January 1996 Insp Rept 50-219/96-11 on 961021-1201.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19930811993-12-22022 December 1993 Insp Rept 50-219/93-81 on 930927-1015.Violations Noted.Major Areas Inspected:Engineering,Maint,Surveillance & Mgt & Corrective Actions IR 05000219/19930261993-11-18018 November 1993 Insp Rept 50-219/93-26 on 931101-05.No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Access Control of Personnel & Packages & Vehicles IR 05000219/19930241993-11-18018 November 1993 Insp Rept 50-219/93-24 on 930921-1101.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering,Plant Support,Including Security & Emergency Preparedness & Safety Assessment/Quality Verification ML20058A3791993-11-12012 November 1993 Insp Rept 50-219/93-23 on 931018-20.Onsite Response to Exercise Scenario Was Good.Major Areas inspected:full- Participation Ingestion Pathway Emergency Preparedness Exercise IR 05000219/19930251993-11-0909 November 1993 Insp Rept 50-219/93-25 on 931018-22.No Violations Noted. Major Areas Inspected:Design Mods & Engineering Support IR 05000219/19930181993-10-28028 October 1993 Insp Rept 50-219/93-18 on 930823-1020.No Violations Noted. Major Areas Inspected:Alara,Rirs,Qa Audits,Air & Swipe Sample Counting Facilities & Radiological Controls Organization Professional Staffing ML20059F6251993-10-28028 October 1993 Insp Rept 50-219/93-22 on 930920-24.No Violations Noted. Major Areas Inspected:Addressed Open Items Associated W/Eop & Reviewed Licensee Actions in Response to Violations Associated W/Recirculation Loop Isolation Event IR 05000219/19930201993-10-19019 October 1993 Insp Rept 50-219/93-20 on 930816-930917.No Violations Noted. Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs Including Mgt Controls & QA Audits IR 05000219/19930211993-10-15015 October 1993 Insp Rept 50-219/93-21 on 930810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000219/19930111993-09-10010 September 1993 Insp Rept 50-219/93-11 on 930629-0809.No Violations Noted. Major Areas Inspected:Day Shift & Back Shift Hours of Station Activities IR 05000219/19930191993-09-0909 September 1993 Insp Rept 50-219/93-19 on 930816-20.Violations Noted.Major Areas Inspected:Radiological Environ Monitoring Program & Meteorological Monitoring Program IR 05000219/19930141993-09-0202 September 1993 EP Insp Rept 50-219/93-14 on 930802-05.Concerns Noted. Major Areas Inspected:Epip,Equipment,Instrumentation & Supplies IR 05000219/19930161993-08-27027 August 1993 Insp Rept 50-219/93-16 on 930726-30.Major Areas Inspected: Erosion/Corrosion Insp Program,Per GL 89-08.Program & Program Implementation Generally Good.Staff Responsible for Program Development & Implementation Qualified IR 05000219/19930121993-08-26026 August 1993 Insp Rept 50-219/93-12 on 930706-09.No Violations Noted. Major Areas Inspected:Licensee Progress in Incorporating EQ Component Info Into GMS2 Computer Database IR 05000219/19920221993-03-19019 March 1993 Mobile NDE Lab Insp 50-219/92-22 on 921207-11 & 930111-15. No Violations Noted.Major Areas Inspected:Cs,Css,Sdc,Ms & FW Sys IR 05000219/19920251993-02-10010 February 1993 Insp Rept 50-219/92-25 on 921215-930118.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Maint & Surveillance,Engneering & Technical Support, Emergency Preparedness & Security IR 05000219/19930011993-01-29029 January 1993 Insp Rept 50-219/93-01 on 930104-08.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Postings & Other in Plant Radiological Controls,Work in Progress, Housekeeping & Self Reading Dosimeter Use IR 05000219/19920231992-12-24024 December 1992 Insp Rept 50-219/92-23 on 921103-1214.No Violations Noted. Major Areas Inspected:Plant Operations,Security & Safety Assessment/Quality Verification IR 05000219/19910041991-03-0101 March 1991 Partially Withheld Insp Rept 50-219/91-04 on 910204-07.No Violations Noted.Major Areas Inspected:Protected Area Physical Barriers,Isolation Zones & Lighting,Protected Area Access Control of Personnel & Security Training IR 05000219/19900191990-11-16016 November 1990 Insp Rept 50-219/90-19 on 900923-1020.Violations Noted. Areas Inspected:Radiological Protection,Surveillance & Maintenance,Emergency Preparedness,Security,Engineering & Technical Support & Safety Assessment/Quality Verification IR 05000219/19900201990-11-0202 November 1990 Insp Rept 50-219/90-20 on 901022-26.No Violations Noted. Major Areas Inspected:Internal Exposure Control & Review of Procedures for Drywell Occupancy During Fuel Movement IR 05000219/19900161990-10-18018 October 1990 Insp Rept 50-219/90-16 on 900823-0922.Violations Noted.Major Areas Inspected:Observation of Plant Activities,Review of Operational Events,Operation of Turbine Bldg Ventilation Sys & Walkdown of Emergency Diesel Fuel Oil Transfer Sys ML20058F3241990-10-0202 October 1990 Insp Rept 50-219/90-17 on 900918-21.No Violations Noted. Major Areas Inspected:Transportation & Solid Radwaste Programs IR 05000219/19900151990-09-20020 September 1990 Partially Withheld Safeguards Insp Rept 50-219/90-15 on 900820-24 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Support,Security Program Plans,Audits,Protected & Vital Areas Physical Barriers,Power Supply & Testing IR 05000219/19900111990-08-15015 August 1990 Insp Rept 50-219/90-11 on 900610-0711.Noncited Violation Noted.Major Areas Inspected:Observation & Review of Plant Operations,Review of Radiological Controls & Routine Observations of Maint Activities & Surveillance Tests ML20056A6191990-07-19019 July 1990 Insp Rept 50-219/90-09 on 900422-0609.Violations Noted. Major Areas Inspected:Observation & Review of Routine Plant Activities & Operational Events,Site Radiological Controls & Events & Observations of Corrective Maint Activities IR 05000219/19890291990-02-16016 February 1990 Insp Rept 50-219/89-29 on 891203-900106.Major Areas Inspected:Observation & Review of Plant Operational Events, Condenser Vacuum Transient,Unusual Events Due to Low Intake Water Level & Simultaneous Movement of Two Control Rods IR 05000219/19890181989-09-13013 September 1989 Insp Rept 50-219/89-18 on 890724-28.No Violations Noted. Major Areas Inspected:Review of Licensee Actions on Previous NRC Concerns,Atws Rule Implementation,Procurement Control & non-licensed Operators Training IR 05000219/19890201989-09-0707 September 1989 Insp Rept 50-219/89-20 on 890829-30.No Exercise Weaknesses Noted.Major Areas Inspected:Licensee Emergency Preparedness Exercise Conducted on 890829-30 ML20246J6261989-08-18018 August 1989 Insp Rept 50-219/89-16 on 890702-29.Violations Noted.Major Areas Inspected:Plant Operational Events,Control of High Radiation Areas,Evaluation of Plant Operation W/High Canal Water Temps & Security Response to Vital Area Door Problem IR 05000219/19890191989-08-15015 August 1989 Insp Rept 50-219/89-19 on 890802-04.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys & Transportation Programs,Including Mgt Controls,Audits,Qa & Implementation of Subj Programs IR 05000219/19890151989-08-0909 August 1989 Insp Rept 50-219/89-15 on 890627-30.No Violations Noted. Major Areas Inspected:Organization & Qualifications of Radiological Controls Personnel in Site Organization IR 05000219/19890141989-08-0303 August 1989 Insp Rept 50-219/89-14 on 890604-0701.No Violations Noted. Major Areas Inspected:Core Spray Booster Pump Trips,Under Voltage Relay Failure,Monthly Surveillance Observations, Emergency Svc Water Pump Operability & Oyster Creek Drawing IR 05000219/19890111989-07-25025 July 1989 Insp Rept 50-219/89-11 on 890606-08.Major Areas Inspected: Emergency Preparedness Insp of full-participation Exercise of Licensee Emergency Plan Conducted on 890607.Exercise Did Not Meet Requirements for Annual Test of Emergency Plan IR 05000219/19890121989-07-21021 July 1989 Insp Rept 50-219/89-12 on 890430-0603.Violations Noted.Major Areas Inspected:Plant Operational Events Including Three Reactor Startups & Licensee Corrective Actions Re Reactor Coolant Pressure Boundary Hangers Being Pinned 1999-03-04
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000219/19980121999-03-0404 March 1999 Insp Rept 50-219/98-12 During Periods 981214-18,990106-07 & 20-22.No Violations Identified.Major Areas Inspected: Review of Licensee self-assessment of Plant Environ Qualification Program & Corrective Actions for Open Items IR 05000219/19980091998-11-25025 November 1998 Insp Rept 50-219/98-09 on 980914-1025.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000219/19980081998-10-20020 October 1998 Insp Rept 50-219/98-08 on 980727-0913.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19980051998-08-26026 August 1998 Insp Rept 50-219/98-05 on 980614-0726.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000219/19980071998-07-0202 July 1998 Insp Rept 50-219/98-07 on 980615-19.No Violations Noted. Major Areas Inspected:Status of Plant motor-operated Valve Program to Determine Acceptability for Closure of NRC Review Under GL 89-10 ML20217F6641998-04-22022 April 1998 Insp Rept 50-219/98-80 on 980223-0313 & 0330-0402.Violations Noted.Major Areas Inspected:Engineering ML20216H1911998-04-15015 April 1998 Insp Rept 50-219/98-04 on 980226-0318.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000219/19970081997-12-0404 December 1997 Insp Rept 50-219/97-08 on 971020-24.No Violations Noted. Major Areas Inspected:Onsite Emergency Plan IR 05000219/19970041997-07-29029 July 1997 Insp Rept 50-219/97-04 on 970526-0706.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000219/19970051997-07-17017 July 1997 Insp Rept 50-219/97-05 on 970407-11.No Violations Noted. Major Areas Inspected:Engineering ML20141G9431997-07-0303 July 1997 Insp Rept 50-219/97-03 on 970414-0525.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000219/19970021997-05-19019 May 1997 Insp Rept 50-219/97-02 on 970224-0413.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20137E9491997-03-21021 March 1997 Insp Rept 50-219/97-01 on 970113-0223.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19960101996-09-27027 September 1996 Insp Rept 50-219/96-10 on 960923-27.No Violations Noted. Major Areas Inspected:Radiological Source Term Assessment, Results of Exposure Reduction Initiatives & Evidence of Station ALARA Program IR 05000219/19960111996-01-0202 January 1996 Insp Rept 50-219/96-11 on 961021-1201.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19930811993-12-22022 December 1993 Insp Rept 50-219/93-81 on 930927-1015.Violations Noted.Major Areas Inspected:Engineering,Maint,Surveillance & Mgt & Corrective Actions IR 05000219/19930261993-11-18018 November 1993 Insp Rept 50-219/93-26 on 931101-05.No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Access Control of Personnel & Packages & Vehicles IR 05000219/19930241993-11-18018 November 1993 Insp Rept 50-219/93-24 on 930921-1101.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering,Plant Support,Including Security & Emergency Preparedness & Safety Assessment/Quality Verification ML20058A3791993-11-12012 November 1993 Insp Rept 50-219/93-23 on 931018-20.Onsite Response to Exercise Scenario Was Good.Major Areas inspected:full- Participation Ingestion Pathway Emergency Preparedness Exercise IR 05000219/19930251993-11-0909 November 1993 Insp Rept 50-219/93-25 on 931018-22.No Violations Noted. Major Areas Inspected:Design Mods & Engineering Support IR 05000219/19930181993-10-28028 October 1993 Insp Rept 50-219/93-18 on 930823-1020.No Violations Noted. Major Areas Inspected:Alara,Rirs,Qa Audits,Air & Swipe Sample Counting Facilities & Radiological Controls Organization Professional Staffing ML20059F6251993-10-28028 October 1993 Insp Rept 50-219/93-22 on 930920-24.No Violations Noted. Major Areas Inspected:Addressed Open Items Associated W/Eop & Reviewed Licensee Actions in Response to Violations Associated W/Recirculation Loop Isolation Event IR 05000219/19930201993-10-19019 October 1993 Insp Rept 50-219/93-20 on 930816-930917.No Violations Noted. Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs Including Mgt Controls & QA Audits IR 05000219/19930211993-10-15015 October 1993 Insp Rept 50-219/93-21 on 930810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000219/19930111993-09-10010 September 1993 Insp Rept 50-219/93-11 on 930629-0809.No Violations Noted. Major Areas Inspected:Day Shift & Back Shift Hours of Station Activities IR 05000219/19930191993-09-0909 September 1993 Insp Rept 50-219/93-19 on 930816-20.Violations Noted.Major Areas Inspected:Radiological Environ Monitoring Program & Meteorological Monitoring Program IR 05000219/19930141993-09-0202 September 1993 EP Insp Rept 50-219/93-14 on 930802-05.Concerns Noted. Major Areas Inspected:Epip,Equipment,Instrumentation & Supplies IR 05000219/19930161993-08-27027 August 1993 Insp Rept 50-219/93-16 on 930726-30.Major Areas Inspected: Erosion/Corrosion Insp Program,Per GL 89-08.Program & Program Implementation Generally Good.Staff Responsible for Program Development & Implementation Qualified IR 05000219/19930121993-08-26026 August 1993 Insp Rept 50-219/93-12 on 930706-09.No Violations Noted. Major Areas Inspected:Licensee Progress in Incorporating EQ Component Info Into GMS2 Computer Database IR 05000219/19920221993-03-19019 March 1993 Mobile NDE Lab Insp 50-219/92-22 on 921207-11 & 930111-15. No Violations Noted.Major Areas Inspected:Cs,Css,Sdc,Ms & FW Sys IR 05000219/19920251993-02-10010 February 1993 Insp Rept 50-219/92-25 on 921215-930118.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Maint & Surveillance,Engneering & Technical Support, Emergency Preparedness & Security IR 05000219/19930011993-01-29029 January 1993 Insp Rept 50-219/93-01 on 930104-08.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Postings & Other in Plant Radiological Controls,Work in Progress, Housekeeping & Self Reading Dosimeter Use IR 05000219/19920231992-12-24024 December 1992 Insp Rept 50-219/92-23 on 921103-1214.No Violations Noted. Major Areas Inspected:Plant Operations,Security & Safety Assessment/Quality Verification IR 05000219/19910041991-03-0101 March 1991 Partially Withheld Insp Rept 50-219/91-04 on 910204-07.No Violations Noted.Major Areas Inspected:Protected Area Physical Barriers,Isolation Zones & Lighting,Protected Area Access Control of Personnel & Security Training IR 05000219/19900191990-11-16016 November 1990 Insp Rept 50-219/90-19 on 900923-1020.Violations Noted. Areas Inspected:Radiological Protection,Surveillance & Maintenance,Emergency Preparedness,Security,Engineering & Technical Support & Safety Assessment/Quality Verification IR 05000219/19900201990-11-0202 November 1990 Insp Rept 50-219/90-20 on 901022-26.No Violations Noted. Major Areas Inspected:Internal Exposure Control & Review of Procedures for Drywell Occupancy During Fuel Movement IR 05000219/19900161990-10-18018 October 1990 Insp Rept 50-219/90-16 on 900823-0922.Violations Noted.Major Areas Inspected:Observation of Plant Activities,Review of Operational Events,Operation of Turbine Bldg Ventilation Sys & Walkdown of Emergency Diesel Fuel Oil Transfer Sys ML20058F3241990-10-0202 October 1990 Insp Rept 50-219/90-17 on 900918-21.No Violations Noted. Major Areas Inspected:Transportation & Solid Radwaste Programs IR 05000219/19900151990-09-20020 September 1990 Partially Withheld Safeguards Insp Rept 50-219/90-15 on 900820-24 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Support,Security Program Plans,Audits,Protected & Vital Areas Physical Barriers,Power Supply & Testing IR 05000219/19900111990-08-15015 August 1990 Insp Rept 50-219/90-11 on 900610-0711.Noncited Violation Noted.Major Areas Inspected:Observation & Review of Plant Operations,Review of Radiological Controls & Routine Observations of Maint Activities & Surveillance Tests ML20056A6191990-07-19019 July 1990 Insp Rept 50-219/90-09 on 900422-0609.Violations Noted. Major Areas Inspected:Observation & Review of Routine Plant Activities & Operational Events,Site Radiological Controls & Events & Observations of Corrective Maint Activities IR 05000219/19890291990-02-16016 February 1990 Insp Rept 50-219/89-29 on 891203-900106.Major Areas Inspected:Observation & Review of Plant Operational Events, Condenser Vacuum Transient,Unusual Events Due to Low Intake Water Level & Simultaneous Movement of Two Control Rods IR 05000219/19890181989-09-13013 September 1989 Insp Rept 50-219/89-18 on 890724-28.No Violations Noted. Major Areas Inspected:Review of Licensee Actions on Previous NRC Concerns,Atws Rule Implementation,Procurement Control & non-licensed Operators Training IR 05000219/19890201989-09-0707 September 1989 Insp Rept 50-219/89-20 on 890829-30.No Exercise Weaknesses Noted.Major Areas Inspected:Licensee Emergency Preparedness Exercise Conducted on 890829-30 ML20246J6261989-08-18018 August 1989 Insp Rept 50-219/89-16 on 890702-29.Violations Noted.Major Areas Inspected:Plant Operational Events,Control of High Radiation Areas,Evaluation of Plant Operation W/High Canal Water Temps & Security Response to Vital Area Door Problem IR 05000219/19890191989-08-15015 August 1989 Insp Rept 50-219/89-19 on 890802-04.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys & Transportation Programs,Including Mgt Controls,Audits,Qa & Implementation of Subj Programs IR 05000219/19890151989-08-0909 August 1989 Insp Rept 50-219/89-15 on 890627-30.No Violations Noted. Major Areas Inspected:Organization & Qualifications of Radiological Controls Personnel in Site Organization IR 05000219/19890141989-08-0303 August 1989 Insp Rept 50-219/89-14 on 890604-0701.No Violations Noted. Major Areas Inspected:Core Spray Booster Pump Trips,Under Voltage Relay Failure,Monthly Surveillance Observations, Emergency Svc Water Pump Operability & Oyster Creek Drawing IR 05000219/19890111989-07-25025 July 1989 Insp Rept 50-219/89-11 on 890606-08.Major Areas Inspected: Emergency Preparedness Insp of full-participation Exercise of Licensee Emergency Plan Conducted on 890607.Exercise Did Not Meet Requirements for Annual Test of Emergency Plan IR 05000219/19890121989-07-21021 July 1989 Insp Rept 50-219/89-12 on 890430-0603.Violations Noted.Major Areas Inspected:Plant Operational Events Including Three Reactor Startups & Licensee Corrective Actions Re Reactor Coolant Pressure Boundary Hangers Being Pinned 1999-03-04
[Table view] Category:UTILITY
MONTHYEARIR 05000219/19900201990-11-0202 November 1990 Insp Rept 50-219/90-20 on 901022-26.No Violations Noted. Major Areas Inspected:Internal Exposure Control & Review of Procedures for Drywell Occupancy During Fuel Movement IR 05000219/19900161990-10-18018 October 1990 Insp Rept 50-219/90-16 on 900823-0922.Violations Noted.Major Areas Inspected:Observation of Plant Activities,Review of Operational Events,Operation of Turbine Bldg Ventilation Sys & Walkdown of Emergency Diesel Fuel Oil Transfer Sys IR 05000219/19900111990-08-15015 August 1990 Insp Rept 50-219/90-11 on 900610-0711.Noncited Violation Noted.Major Areas Inspected:Observation & Review of Plant Operations,Review of Radiological Controls & Routine Observations of Maint Activities & Surveillance Tests ML20056A6191990-07-19019 July 1990 Insp Rept 50-219/90-09 on 900422-0609.Violations Noted. Major Areas Inspected:Observation & Review of Routine Plant Activities & Operational Events,Site Radiological Controls & Events & Observations of Corrective Maint Activities IR 05000219/19890291990-02-16016 February 1990 Insp Rept 50-219/89-29 on 891203-900106.Major Areas Inspected:Observation & Review of Plant Operational Events, Condenser Vacuum Transient,Unusual Events Due to Low Intake Water Level & Simultaneous Movement of Two Control Rods IR 05000219/19890181989-09-13013 September 1989 Insp Rept 50-219/89-18 on 890724-28.No Violations Noted. Major Areas Inspected:Review of Licensee Actions on Previous NRC Concerns,Atws Rule Implementation,Procurement Control & non-licensed Operators Training IR 05000219/19890201989-09-0707 September 1989 Insp Rept 50-219/89-20 on 890829-30.No Exercise Weaknesses Noted.Major Areas Inspected:Licensee Emergency Preparedness Exercise Conducted on 890829-30 ML20246J6261989-08-18018 August 1989 Insp Rept 50-219/89-16 on 890702-29.Violations Noted.Major Areas Inspected:Plant Operational Events,Control of High Radiation Areas,Evaluation of Plant Operation W/High Canal Water Temps & Security Response to Vital Area Door Problem IR 05000219/19890191989-08-15015 August 1989 Insp Rept 50-219/89-19 on 890802-04.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys & Transportation Programs,Including Mgt Controls,Audits,Qa & Implementation of Subj Programs IR 05000219/19890151989-08-0909 August 1989 Insp Rept 50-219/89-15 on 890627-30.No Violations Noted. Major Areas Inspected:Organization & Qualifications of Radiological Controls Personnel in Site Organization IR 05000219/19890141989-08-0303 August 1989 Insp Rept 50-219/89-14 on 890604-0701.No Violations Noted. Major Areas Inspected:Core Spray Booster Pump Trips,Under Voltage Relay Failure,Monthly Surveillance Observations, Emergency Svc Water Pump Operability & Oyster Creek Drawing IR 05000219/19890111989-07-25025 July 1989 Insp Rept 50-219/89-11 on 890606-08.Major Areas Inspected: Emergency Preparedness Insp of full-participation Exercise of Licensee Emergency Plan Conducted on 890607.Exercise Did Not Meet Requirements for Annual Test of Emergency Plan IR 05000219/19890131989-06-15015 June 1989 Insp Rept 50-219/89-13 on 890522-26.No Violations Noted. Major Areas Inspected:Licensee Liquid & Gaseous Radioactive Effluent Control Programs & Radiological Environ Monitoring Program IR 05000219/19890101989-05-24024 May 1989 Insp Rept 50-219/89-10 on 890402-29.No Violations Noted. Major Areas Inspected:Action of Plant Deficiencies Discovered During Startup,Instrument Air Sys Problems, Surveillance Testing & Control Rod Scram Timing Testing IR 05000219/19890071989-05-17017 May 1989 Insp Rept 50-219/89-07 on 890226-0401.No Violations Noted. Major Areas Inspected:Activities in Progress at Completion of Outage,In Preparation for Startup & Plant Startup Activities IR 05000219/19890061989-05-10010 May 1989 Insp Repts 50-219/89-06 on 890217-24.Violations Noted.Major Areas Inspected:Review of Preliminary Safety Concern Process Including Concerns Involving Standby Gas Treatment Sys, Automatic Depressurization Sys & Containment Spray Sys IR 05000219/19890081989-04-28028 April 1989 Insp Rept 50-219/89-08 on 890313-17.No Violations Noted. Major Areas Inspected:Implementation of Relief & Safety Valve Position Indication Sections of NUREG-0737 & Procedures Re Handling of Emergency Diesel Generator Fuel IR 05000219/19890041989-04-14014 April 1989 Insp Rept 50-219/89-04 on 890115-0225.Violations Noted.Major Areas Inspected:Activities in Progress,Including Air Accumulator Testing,Environ Qualification,Reactor Pressure Vessel Testing,Operations & Physical Security IR 05000219/19882031989-03-13013 March 1989 SSOMI Rept 50-219/88-203 on 881128-1216.Major Areas Inspected:Adequacy of Licensee Mgt & Control of Mods Performed During Major Plant Outage & to Identify Strengths & Weaknesses in Licensee Mod Programs ML20236A5571989-03-0303 March 1989 Safety Insp Rept 50-219/89-03 on 890117-20.No Violations, Deviations or Unresolved Items Noted.Major Areas Inspected: Licensee Emergency Preparedness Program ML20245H9681989-02-21021 February 1989 Insp Rept 50-219/88-38 on 881204-890114.No Violations Noted. Unresolved Items Observed.Major Areas Inspected:Maint & Surveillance Activities,Radiation Control & Physical Security,Including Security Events Re Unauthorized Entry ML20235H2681989-02-0303 February 1989 Insp Rept 50-219/89-02 on 890117-20.Violations Noted.Major Areas Inspected:Licensee Activity Re Info Notice 86-053 (Raychem Splices) IR 05000219/19880311988-11-29029 November 1988 Insp Rept 50-219/88-31 on 881003-07,20 & 1031-1104. Violations Noted.Major Areas Inspected:Status of Outstanding Items,Radiological Controls Re 12R Refueling Outage & Review of Circumstances Concerning Radioactive Spill Incident IR 05000219/19880321988-11-28028 November 1988 Insp Rept 50-219/88-32 on 881017-21.Violation Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits, Protected & Vital Area Physical Barriers,Access Control, Detection & Assessment Aids,Testing & Maint & Power Supply IR 05000219/19880281988-11-15015 November 1988 Insp Rept 50-219/88-28 on 880911-1004 & 1014-29.Apparent Violation Noted.Major Areas Inspected:Activities in Progress,Including Plant Operations,Radiation Control, Physical Security,Maint & Forced Shutdown Activities ML20206D0131988-11-0101 November 1988 Environ Qualification Enforcement Conference Rept 50-219/85-39 on 881020.Major Areas Discussed:Significance of Concerns Re Environ Qualification of PVC Tape Splices & Limit Switches Associated W/Msivs.Related Info Encl ML20205P6101988-10-31031 October 1988 Insp Rept 50-219/88-30 on 880929.Notice of Violation Withdrawn.Major Areas Inspected:Emergency Preparedness Activities Re Licensee Response to Notice of Violation & Inspector Followup Items IR 05000219/19880801988-10-28028 October 1988 Augmented Insp Team Rept 50-219/88-80 on 881005-13.Major Areas Inspected:Circumstances Surrounding Steaming Phenomenon on Both Isolation Condensers in Late Aug & Sept 1988 & Electrical Fault on Diesel Generator 2 on 881002 IR 05000219/19880291988-10-22022 October 1988 Insp Rept 50-219/88-29 on 880914-15.App R Violation Re High & Low Pressure Interface During Design Basis Fire Which Could Cause Loss of Reactor Coolant Noted.Major Areas Inspected:Interviews W/Personnel & Inspector Observations ML20205J7301988-10-11011 October 1988 Insp Rept 50-219/88-26 on 880909 & 0912-15.No Violations Noted.Major Areas Inspected:Licensee Inservice Insp Program to Ascertain That Program Complies W/Applicable ASME Code & Regulatory Requirements & Response to Generic Ltr 88-01 ML20207N2331988-10-0404 October 1988 Insp Rept 50-219/88-25 on 880829-0902.No Violations Noted. Major Areas Inspected:Licensee Actions in Response to NRC Bulletins 79-02 & 79-14,Deficiencies Noted in Some Pipe Support & Pipe Support Base Plates IR 05000219/19880231988-09-27027 September 1988 Insp Rept 50-219/88-23 on 880731-0910.Violation Noted. Major Areas Inspected:Plant Operations & Startup,Radiation Control,Physical Security,Maint & Forced Shutdown Work Activities & Isolation Condenser Sys Operability IR 05000219/19880241988-09-0909 September 1988 Insp Rept 50-219/88-24 on 880715 & 18-0812.No Violation Noted.Unresolved Item Identified.Major Areas Inspected: Failure of MSIV NS03A Stem,Including Sequence of Events, Maint & Surveillance Test History & Stem Matl ML20151Y3081988-08-15015 August 1988 Insp Rept 50-219/88-15 on 880523-0726.Violations Noted. Major Areas Inspected:Licensee Action in Response to Mark I Containment Mod Requirements of NUREG-0661,review of Design Analyses & Plant Unigue Analysis Rept IR 05000219/19880221988-08-12012 August 1988 Insp Rept 50-219/88-22 on 880718-22.No Violations Noted. Major Areas Inspected:Gaseous & Liquid Radioactive Effluent Control Programs,Licensee Action on Previous Insp Findings, Effluents,Instrumentation,Audits & Air Cleaning Sys IR 05000219/19880171988-07-26026 July 1988 Insp Rept 50-219/88-17 on 880613-17.No Violations Noted. Major Areas Inspected:Previously Identified Findings,Spds & Planned Mods to Institute Corrective Measures to Satisfy ATWS IR 05000219/19880181988-07-11011 July 1988 Mgt Meeting Rept 50-219/88-18 on 880609.Major Areas Discussed:Status of Licensee Action/Plans & Schedules for Work Per IE Bulletins 79-02 & 79-14 IR 05000219/19880121988-07-0808 July 1988 Insp Rept 50-219/88-12 on 880425-29.No Violations Noted. Major Areas Inspected:Review of Licensee Program Implementation of 10CFR21 Regulation & Review of Station Procurement Program IR 05000219/19880051988-06-30030 June 1988 Insp Rept 50-219/88-05 on 880511-12.No Violations Noted. Major Areas Inspected:Emergency Exercise Conducted on 880511-12 IR 05000219/19880141988-06-27027 June 1988 Insp Rept 50-219/88-14 on 880516-20.Violation Noted.Major Areas Inspected:Selected Areas of Fire Protection & Electric Power Sys,Including Reviews of Administrative Control, Surveillance & Fire Brigade Procedures IR 05000219/19880131988-06-14014 June 1988 Insp Rept 50-219/88-13 on 880424-0521.One Violation Noted. Major Areas Inspected:Plant Operations,Physical Security, Radiation Control,Housekeeping,Fire Protection & Emergency Preparedness & Annual Emergency Exercise Participation IR 05000219/19880091988-05-26026 May 1988 Insp Rept 50-219/88-09 on 880320-0423.No Violations Noted. Major Areas Inspected:Plant Operations,Radiation Control, Physical Security,Surveillance,Maint & Environ Qualification Files for Reactor Vessel Pressure Switches IR 05000219/19880111988-05-11011 May 1988 Safety Insp Rept 50-219/88-11 on 880411-15.Violations Noted. Major Areas Inspected:Status of Items Identified During 1987 Integrated Performance Assessment Team Insp & Status of Measures to Control Drywell Access IR 05000219/19880041988-05-0606 May 1988 Insp Rept 50-219/88-04 on 880207-0319.Violations Noted.Major Areas Inspected:Activities in Progress,Including Plant Operation,Physical Security,Radiation Control,Housekeeping, Fire Protection & Emergency Preparedness ML20153D8181988-04-29029 April 1988 Insp Rept 50-219/88-06 on 880222-26.Violation Noted.Major Areas Inspected:Emergency Implementing Procedures & Plans, Emergency Facilities,Equipment,Instrumentation & Supplies & Application of IE Info Notices 83-28 & 84-80 IR 05000219/19880081988-04-29029 April 1988 Mgt Meeting Rept 50-219/88-08 on 880308.Major Areas Discussed:Licensee Activities Re NRC Bulletins 79-02 & 79-14.Licensee Presentation Encl IR 05000219/19870421988-03-14014 March 1988 Insp Rept 50-219/87-42 on 871220-880206.No Violations Noted. Major Areas Inspected:Activities in Progress,Including Operations,Radiation Control,Physical Security,Surveillance & Maint IR 05000219/19880021988-02-29029 February 1988 Insp Rept 50-219/88-02 on 880125-29.Violations Noted.Major Areas Inspected:Safety Implications of Freezing Conditions Identified in Reactor Bldg on 880106 & Effectivness of Licensee Corrective Measures IR 05000219/19880011988-02-19019 February 1988 Insp Rept 50-219/88-01 on 880104-08.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previously Identified NRC Concerns,Util Offsite Review Committee & Organization & Administration & QA Audits IR 05000219/19870401988-01-21021 January 1988 Physical Security Insp Rept 50-219/87-40 on 871106.No Violations Noted.Major Areas Inspected:Three Allegations Re Deficiencies in Security Program.Allegations Were Not Substantiated 1990-08-15
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999 PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power IR 05000219/19980121999-03-0404 March 1999 Insp Rept 50-219/98-12 During Periods 981214-18,990106-07 & 20-22.No Violations Identified.Major Areas Inspected: Review of Licensee self-assessment of Plant Environ Qualification Program & Corrective Actions for Open Items IR 05000219/19980091998-11-25025 November 1998 Insp Rept 50-219/98-09 on 980914-1025.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20196C6071998-11-25025 November 1998 Notice of Violation from Insp on 980914-1025.Violation Noted:On 981014,security Force Vehicle Escort Left Non licensee-designated Vehicle Unattended in Protected Area & Failed to Ensure That Vehicle Ignition Locked & Key Removed IR 05000219/19980081998-10-20020 October 1998 Insp Rept 50-219/98-08 on 980727-0913.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19980051998-08-26026 August 1998 Insp Rept 50-219/98-05 on 980614-0726.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000219/19980991998-07-17017 July 1998 SALP Rept 50-219/98-99 for 961201-980613 IR 05000219/19980071998-07-0202 July 1998 Insp Rept 50-219/98-07 on 980615-19.No Violations Noted. Major Areas Inspected:Status of Plant motor-operated Valve Program to Determine Acceptability for Closure of NRC Review Under GL 89-10 ML20249B3661998-06-15015 June 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Prior to 980304, Licensee Failed to Establish Adequate Design Control Measures to Verify Adequacy of Design Voltage ML20237E4491998-06-10010 June 1998 EN-98-047:on 980615,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Involving Inoperability of Three of Five Automatic Depressurization Valves ML20217F6641998-04-22022 April 1998 Insp Rept 50-219/98-80 on 980223-0313 & 0330-0402.Violations Noted.Major Areas Inspected:Engineering ML20217F6491998-04-22022 April 1998 Notice of Violation from Insp on 980223-0313 & 0330-0402. Violations Noted:On 980226,seismic Deficiency W/Containment Spray Heat Exchanger,That Had Been Identified in Late 1996 by Licensee,Had Not Been Adequately Corrected ML20216H1911998-04-15015 April 1998 Insp Rept 50-219/98-04 on 980226-0318.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20216H1701998-04-15015 April 1998 Notice of Violation from Insp on 980226-0318.Violations Noted:Since Initial Plant Operation,Operators Implemented Procedure 307,isolation Condenser Sys,Permitting Fill & Make Up to Isolation Condensers During Normal Plant Operations ML20216J0181998-04-14014 April 1998 Notice of Violation from Insp on 971229-980208.Violation Noted:Written SE Was Not Performed to Provide Bases for Determination That Change in Facility as Described in SAR Did Not Involve USQ IR 05000219/19970081997-12-0404 December 1997 Insp Rept 50-219/97-08 on 971020-24.No Violations Noted. Major Areas Inspected:Onsite Emergency Plan ML20199G7881997-11-17017 November 1997 Notice of Violation from Insp on 970707-970824.Violation Noted:In Oct 1993,vendor Specification for Emergency Svc Water Pump Bowl Assemblies Was Changed from Cast Iron to Stainless Steel PNO-I-97-045, on 970801,electricians Restoring One Set of Main Generator Exciter Brushes,Following Routine Surveillance,When One of Brushes Sparked Excessively & Disintegrated.Electricians Exited Area & Notified CR1997-08-0404 August 1997 PNO-I-97-045:on 970801,electricians Restoring One Set of Main Generator Exciter Brushes,Following Routine Surveillance,When One of Brushes Sparked Excessively & Disintegrated.Electricians Exited Area & Notified CR IR 05000219/19970041997-07-29029 July 1997 Insp Rept 50-219/97-04 on 970526-0706.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000219/19970051997-07-17017 July 1997 Insp Rept 50-219/97-05 on 970407-11.No Violations Noted. Major Areas Inspected:Engineering ML20141G9431997-07-0303 July 1997 Insp Rept 50-219/97-03 on 970414-0525.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20141G9401997-07-0303 July 1997 Notice of Violation from Insp on 970414-0525.Violation Noted:On 970423,CROs Placed a & B Loops of Shutdown Cooling Sys in Svc W/O Placing Suction Pressure Interlocks in Svc for a & B Pumps by Opening Ps Isolation Valves IR 05000219/19970021997-05-19019 May 1997 Insp Rept 50-219/97-02 on 970224-0413.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20141J5221997-05-19019 May 1997 Notice of Violation from Insp on 970224-0413.Violation Noted:Permanent Change,Dec 95,made to Facility,As Described in SAR Involving Removal of Isolation Condenser Radiation Monitors W/O Considering All Relevant Portions of SAR PNO-I-97-024, on 970422,Oyster Creek Nuclear Generating Station Commenced Controlled Shutdown of Unit Due to Equipment Problems.Unit Expected to Be Shut Down for Six Days for Correction of Diaphram Problem1997-04-23023 April 1997 PNO-I-97-024:on 970422,Oyster Creek Nuclear Generating Station Commenced Controlled Shutdown of Unit Due to Equipment Problems.Unit Expected to Be Shut Down for Six Days for Correction of Diaphram Problem PNO-I-97-022, on 970410,GPU,Inc Announced,Addition to Continued Operation of Oyster Creek & Also Exploring Options of Sale.Util Will Begin Next Wk to Develop Plans to Support Sale of Plant,Decommissioning & Personnel Retention1997-04-10010 April 1997 PNO-I-97-022:on 970410,GPU,Inc Announced,Addition to Continued Operation of Oyster Creek & Also Exploring Options of Sale.Util Will Begin Next Wk to Develop Plans to Support Sale of Plant,Decommissioning & Personnel Retention ML20137E9411997-03-21021 March 1997 Notice of Violation from Insp on 970113-0223.Violation Noted:Procedure 108.7, Lockout/Tagout Procedure, Rev 4, Did Not Include Appropriate Quantitative or Qualitative Acceptance Criteria ML20137E9491997-03-21021 March 1997 Insp Rept 50-219/97-01 on 970113-0223.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19960991997-01-0909 January 1997 SALP Rept 50-219/96-99 for Oyster Creek Nuclear Generating Station for 950625-961130 ML20133D6781997-01-0202 January 1997 Notice of Violation from Insp on 961021-1201.Violation Noted:Written Safety Evaluation Was Not Performed to Provide Bases for Determination That Change to Station Procedure 336.3 Did Not Involve Unreviewed Safety Question PNO-I-96-078, on 961025,licensee Manually Scrammed Reactor Due to Turbine Runback,Resulted from Problem in Stator Cooling Sys.Resident Will Continue to Follow Event1996-10-29029 October 1996 PNO-I-96-078:on 961025,licensee Manually Scrammed Reactor Due to Turbine Runback,Resulted from Problem in Stator Cooling Sys.Resident Will Continue to Follow Event IR 05000219/19960101996-09-27027 September 1996 Insp Rept 50-219/96-10 on 960923-27.No Violations Noted. Major Areas Inspected:Radiological Source Term Assessment, Results of Exposure Reduction Initiatives & Evidence of Station ALARA Program IR 05000219/19960111996-01-0202 January 1996 Insp Rept 50-219/96-11 on 961021-1201.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19920991994-01-26026 January 1994 SALP Rept 50-219/92-99 for Period 920719-931211 ML20059B6331993-12-23023 December 1993 Notice of Violation from Insp on 930927-1015.Violation Noted:All NRC Violations & Ten Licensee Event Repts Issued in 1992 & 1993 Did Not Receive Required Independent Safety Reviews IR 05000219/19930811993-12-22022 December 1993 Insp Rept 50-219/93-81 on 930927-1015.Violations Noted.Major Areas Inspected:Engineering,Maint,Surveillance & Mgt & Corrective Actions IR 05000219/19930261993-11-18018 November 1993 Insp Rept 50-219/93-26 on 931101-05.No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Access Control of Personnel & Packages & Vehicles IR 05000219/19930241993-11-18018 November 1993 Insp Rept 50-219/93-24 on 930921-1101.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering,Plant Support,Including Security & Emergency Preparedness & Safety Assessment/Quality Verification ML20058A3791993-11-12012 November 1993 Insp Rept 50-219/93-23 on 931018-20.Onsite Response to Exercise Scenario Was Good.Major Areas inspected:full- Participation Ingestion Pathway Emergency Preparedness Exercise IR 05000219/19930251993-11-0909 November 1993 Insp Rept 50-219/93-25 on 931018-22.No Violations Noted. Major Areas Inspected:Design Mods & Engineering Support ML20059M3211993-11-0909 November 1993 EN-93-081A:on 930812,notice of Proposed Imposition of Civil Penalty in Amount of $75,000 Issued to Licensee.Action Based on Five Radiological Controls Violations ML20059F6251993-10-28028 October 1993 Insp Rept 50-219/93-22 on 930920-24.No Violations Noted. Major Areas Inspected:Addressed Open Items Associated W/Eop & Reviewed Licensee Actions in Response to Violations Associated W/Recirculation Loop Isolation Event IR 05000219/19930181993-10-28028 October 1993 Insp Rept 50-219/93-18 on 930823-1020.No Violations Noted. Major Areas Inspected:Alara,Rirs,Qa Audits,Air & Swipe Sample Counting Facilities & Radiological Controls Organization Professional Staffing IR 05000219/19930201993-10-19019 October 1993 Insp Rept 50-219/93-20 on 930816-930917.No Violations Noted. Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs Including Mgt Controls & QA Audits ML20059A2201993-10-15015 October 1993 Notice of Violation from Insp on 920719-0825.Violation Noted:Licensee Determined That Records Required to Be Maintained by Commission Regulations or License Conditions Not Complete & Accurate in All Matl Respects IR 05000219/19930211993-10-15015 October 1993 Insp Rept 50-219/93-21 on 930810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000219/19930171993-09-14014 September 1993 Exam Rept 50-219/93-17OL on 930810-12.Exam Results:All 16 Licensed Operators Passed All Portions of Exam That Was Administered & All Three Crews Performed Satisfactorily in Simulator ML20149D5021993-09-13013 September 1993 Notice of Violation from Insp on 930629-0809.Violation Noted:On 930709,NRC Identified Condition Adverse to Quality That Had Existed Since 920709 IR 05000219/19930111993-09-10010 September 1993 Insp Rept 50-219/93-11 on 930629-0809.No Violations Noted. Major Areas Inspected:Day Shift & Back Shift Hours of Station Activities ML20149D7051993-09-10010 September 1993 Notice of Violation from Insp on 930816-20.Violation Noted: as of 930820,appropriate Measures Were Not Established to Assure Adequate Quality Was Suitably Included in Documents for Procurement of Svcs 1999-09-16
[Table view] |
Text
_ - _ _ _ _ _ _ - - _
. I
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Report N /87-17 Docket N I i
License N DPR-16 Licensee: GPU Nuclear Corporation !
Oyster Creek Nucleat Generating Station P.O. Box 388 Forked River, New Jersey 08731 j i
Facility Name: Oyster Creek Nuclear Generating Station I Inspection At: Forked River, New Jersey l
!
Inspection Conducted- May 11-15, 1987 i
!
Inspectors-g~Nj#X /dce 6 7-( - 67 P. H. Biss6tt,~ Reactor Engineer, DRS date
&W W/bc D. T. Wallace, Reactor Engineer, DRS 9-/-89 date I
Approved by: d- N [A N . J . Bl umbe rg , Cl/i e f 7-/-M date Operational Programs Section Operations Branch, DRS Inspection Summary: Routine, unannounced inspection on May 11-15, 1987 (Report No. 50-219/87-17)
Areas Inspected: Routine unannounced inspection of licensee action on previous inspection findings, licensee surveillance activities, and the inservice testing of pumps and valve Results: No violations were identifie B707150030 070707 ,
PDR ADOCK 05000219 '!
G PDR j l
1
.
.
.
DETAILS 1. Persons Contacted i 1.1 GPU Nuclear Corporation J. Barton, Deputy Director,' Oyster Creek P. Crosby, Supervisor, Operations Engineering V. Foglia, Preventive Maintenance Programs Manager J. Maloney, Manager, Plant Material D. Robillard, Quality Assurance Lead Auditor 3 J. Rogers, Licensing Engineer !
A. Rore, Plant Engineering Director 1 B. Shumaker, Plant Operations Supervisor U.S. Nuclear Regulatory Commission i
W. Bateman, Senior Resident Inspector !
J. Wechselberger, Resident Inspector i The inspectors also held discussions with other licensee personnel ,
during the course of the inspection, including operations, '
maintenance, engineering and administrative personne All individuals listed above were present at the exit meeting conducted on May 15, 198 . Licensee Action On Previous Inspection Findings 2.1 (Closed) Inspector Follow-up Item (219/84-06-06): Licensee to strengthen the controls over temporary changes to procedure A review of the Control Room Temporary Change Notice Log Book indicated that it was being maintained and kept up-to-date on a daily l basis. Also, several temporary changes were reviewed to verify that l they have been recorded in the respective procedures in which the temporary change had been written against. Discussions were also held by the inspector with the control room Group Shift Supervisor to provide added assurance that the necessary controls were in place and were being implemented as required. Based on this review, this item is close .2 (Closed) Noncompliance (219/81-08-01): Licensee to install service water flow instrumentation for inservice test purposes. This item involved several concerns, all of which were previously reviewed and closed out in inspection 219/85-01, with the exception of the installation of the flow meter in System II of the Emergency Service Water system. The inspector verified through direct observation that
, an Annubar flow sensor had been instal. led on the Emergency Service Water, System II. Based upon this review, this item is close .
s
.
,
2.3 (0 pen) Violation (219/83-26-01): Fire pump surveillance procedure ,
failed to incorporate new changes as a result of a Technical '
Specification (TS) amendmen Through a review of the affected fire i pump surveillance procedure, discussions with Oyster Creek personnel and a review of responses and other documents pertaining to the violation, the inspector determined that the fire pump surveillance procedure had been updated to reflect the latest T.S, requirement However, during review of Licensee Event Report (LER) No.85-008, it was noted that in 1985, the licensee had again failed to incorporate a TS amendment into applicable surveillance procedures. This LER i stated that the apparent cause of the occurrence was due to a
" breakdown in the administrative controls which are intended to assure that the necessary actions required to implement changes in :
T.S. are properly assigned and monitored for completion." One such control mechanism utilized at the site is the Licensing Action Item l (LAI). LAI's are issued by Licensing to track the cycle of TS i amendment incorporation into plant procedures. However, during this
'
inspection, the inspector noted that LAIs had not been issued for a ;
number of recent TS amendments. No additional instances were !
identified in which T.S. amendments had not been incorporated into applicable surveillance procedures. The licensee stated that it was not deemed necessary to generate LAIs for those instances identified j by the inspector. They also stated that additional mechanisms were i in place which provided added assurance that necessary actions would ;
be completed. (The inspectors were however unaware of any other existing mechanisms in place prior to the exit meeting.) Prior to !
the conclusion of the inspection, LAIs were generated and issued against these T.S. amendment Subsequent to the inspection through a telephone conversation with i the licensee on June 18 1987, the inspector was informed by a licensee representative of other actions that had been taken or are q planned in regard to the above concern. These actions include the followin ]
i
The licensee will review all TS amendments issued since January l 1985 to provide assurance that appropriate action (ie.,
procedure change) was completed. LAIs will be generated against all T.S. amendments even if appropriate action has ,
already taken plac For further TS changes, an LAI will be issued in regard to the TS change request and another LAI will be issued upon receipt i of the respective TS amendmen The inspector concludes from the above review and subsequent telephone call, that the licensee has adequately addressed NRC concerns in this area. However, until such time that the licensee demonstrates that the above mentioned actions are being properly accomplished, this item remains ope _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ ._
- - - - - - _ - _ - - _
I
.
e
.
4 ,
!
.,
3.0 Surveillance and In-Service Testing (IST) Activities 3.1 References / Requirements
--
10 CFR 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plant Regulatory Guide 1.33, Quality Assurance Program Requirement American National Standard (ANSI) N18.7-1976, Administrative l Controls for Nuclear Power Plant Technical Specifications 3.2 Surveillance Testing, Procedures and Records This portion of the inspection included a review of the surveillance-program, procedures, and applicable record . Surveillance Program
!
The inspector reviewed the program to determine that a master l schedule for surveillance testing / calibration has been established and included the followin The frequency for each surveillance
--
The plant group responsible for performing each surveillance
--
The status of each surveillance test In addition, the inspector reviewed the formalized methods that have been defined for the review and evaluation of surveillance data, including procedures for reporting and reviewing deficiencie .2.2 Surveillance Procedure Review i
The inspector reviewed a random sampling of surveillance procedures (listed in Attachment 1) for the following 4 attribute The presence and adequacy of prerequisites
--
The incorporation of acceptance criteria in accordance with Technical Specification (TS) requirements
--
The provisions for restorati.on of equipment and systems L
_____________m.______ _ - _ _ _ _
.
.
.
.
t
--
The adequacy of procedure content
--
The incorporation of Technical Specification amendments, f where applicable 3. Review of Completed Surveillance Activities I A sample of surveillance records corresponding to the procedures reviewed in section 3.2.2 of this report were reviewed against the following applicable requirement Surveillance were conducted in conformance with TS [
requirements
--
Completed surveillance were reviewed as required by administrative procedures {
l
--
Surveillance were performed within the time. frequencies specified in the Technical Specifications 1
--
Appropriate action was taken for any item failing the l acceptance criteria d Attachment 1 contains a complete list of surveillance records that were reviewe .2.4 Findings By reviewing the applicable administrative procedures, the l surveillance procedures themselves, and a sample of completed !
surveillance records, the inspector determined that the surveillance reviewed during the inspection conformed to regulatcry and administrative requirement Procedures were noted to specify acceptance criteria as designated in the TS. In almost all cases, procedures were written in such a way as to distinguish between TS acceptance criteria requirements and other less critical criteri This clarification in the acceptance criteria section of surveillance procedures aids in the determination of whether a component or system is to be declared inoperabl The master schedule for surveillance was found to indicate all the information specified in section 3.2.1 of this repor Tracking of TS surveillance was being performed by the Plant Material Group. The inspector did not identify any surveillance that had not been performed, or had exceeded their time limit interval.
- _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _
- - - _ _ - _ _ _
!
.
.
.
.
The sampling of surveillance procedures reviewed contained the latest TS amendments and had restoration steps incorporated into each individual procedur Deviation Reports had been initiated for surveillance which had failed the acceptance criteri Surveillance records identified these deviations, and displayed proper documentation in the j records reviewed. Further review indicated that appropriate l corrective actions had been taken in regard to these deviation The inspector also reviewed the " Cross Reference of Surveillance Procedures and Technical Specification," which is attached to Administrative Procedure 116, Surveillance Test Program, Re . The cross-reference was observed to be current through TS Amendment No. 9 Because the current TS had Amendment No. 116, i the inspector questioned the licensee concerning the length of .)
time involved since TS Amendment No. 9'l became effective q (approximately 1 year earlier). The licensee stated that a more (
current cross reference was in the review process. The inspector {'
verified that the prospective revision did include all TS amendments current at the time the review process for this document revision commence The inspector determined that the document was being updated periodically, and had no further ,
questions at this tim i
!
No viclations or deviations were identifie j 3.3 Inservice Testing of Pumps and Valves I
3. Scope of Review !
l The inspector reviewed various administrative and surveillance l test procedures to ascertain compliance with 10 CFR 50.55a(g)
which requires Inservice Testing (IST) of pumps and valves in accordance with Section XI of the ASME Boiler and Pressure Vessel Code. A major portion of this review was an evaluation of the licensee's IST program with respect to procedures, conduct of tests, and analysis of result . Review / Implementation The inspector reviewed applicable administrative procedures and ;
various IST surveillance (listed in Attachment 1) for technical
'
adequacy and to ascertain compliance with the requirements of Technical Specifications,Section XI of the ASME Boiler and Pressure Vessel Code, and 10 CFR 50.55a(g).
'
A random sampling of completed IST surveillance verified that
-
the following attributes were being accomplished with respect to inservice testing.
l
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - ~ - ' '- - ' - - - " - - ^ "
!
l i
&
i
'
~.
!
!
--
Applicable surveillance test procedures were approved and l up-to-date i
--
Any applicable temporary changes were noted within the procedures
--
Calibrated test equipment utilized during the performance )
of the surveillance was listed J
--
Acceptance criteria were listed within the procedure
--
Appropriate steps were taken, i.e., increased testing frequency, corrective maintenance, retests, were taken if acceptance criteria were not met
--
Appropriate reviews were performed following completion of the test Further reviews of IST program implementation, including evaluation of test results, trending, recording, etc. is "
detailed in paragraph 5.0 of this repor . Findings No violations were identified; however, the inspector did i express a concern over the timeliness to which completed '
surveillance are filed in the document control cente Instances were noted where as long as 9 months had expired since i the completion of the test and it had not yet been stored in the ,
respective record fil The licensee acknowledged the {
inspectors' concern and stated that this area would be reviewed and appropriate action would be taken. The inspector had no further question I l
4.0 Independent Calculations l
4.1 Verification of Reactor Building to Suppression Chamber Vacuum Breaker Operability 1 Technical Specification (TS) 3.5.A.4 requires that the Reactor l Building to Suppression Chamber Vacuum Breakers actuate with less than a 0.5 psi differential pressure across the valve sea These valves are 20-inch, self actuated type, and are installed to prevent a vacuum from being created in the suppression poo During a plant tour, the inspector noticed that the valves in question did not have weights installed on the weight levers. These weights can be utilized to allow a che.ck valve to open with less force applied to the valve than without the weights installed. The
- _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
__ _ _ _ _ . - _ - _
..
-
-
.
l 8 H
.
.
q l
inspector subsequently reviewed the system design to verify that the valves would open with less than .5 psi across their seats. After .J obtaining applicable drawings and other valve specification, such as j weight of the valve seat, weight _of the weight. arms and certain i distances, the inspector calculated whether the valves should actuate j when a .5 psi differential pressure was-applied to.their seats. The
. inspector determined that'the valves should open as required assuming that excessive friction was not present in the valves hinges. The ,
inspector then checked surveillance records for the. valves in' order to compare actu'al forces to open the valves against the calculated- j valv I
<
The actual force values, as recorded on' completed surve'111ance records were determined to be in an' expected range, based on the ;
inspector's calculations. The inspector then mathematically verified
.
j that the acceptance criteria for the applicable surveillance (procedure 604.4.003, Rev. 3) was'in conformance to TS! requirement ]
The results'of the inspector's calculations agreed with the
.
surveil. lance acceptance criteria which were derived from TS .{
requirements and incorporated into the surveillance procedur Actual force values'to open the valves were determined to represent a j small fraction of the maximum force allowable (maximum force q represents the maximum force based on the TS differential. pressure .{
requirement). The inspector concluded that TS requirements a'r !
accurately incorporated into the surveillance and that the acceptance criteria have been met in previous performances of the surveillanc ]
1 No violations or deviations were identifie l 5.0 Engineering Involvement
- i As noted previously, engineering is primarily responsible for controlling the conduct of IST activities. They also perform reviews of all completed IST tests and subsequently track, document and trend components .
performanc The inspector discussed with both the IST Pump and IST Valve !
Coordinators, various aspects of the IST program implementation. Also j reviewed were Pump Operability Test' Summary Sheets, Cold Shutdown and Refueling Test Lists, Valve Test Summary Sheets, Valve Trend Analysis Sheets, etc. The inspector found these records being maintained and i i
up-to-dat .0 Exit Interview The inspectors met with licensee representatives on May 15, 1987, to '
summarize the scope and findings of the inspectio _
A subsequent telephone disucssion concerning licensee' action, in regard to previous inspection finding 219/83-26-01, was conducted between the inspector and Mr. J. Rogers on June 18, 19 __ _ _ -____ __=___ _ ___ _ - - _ __- . - l
'
!
,
.
.
At no time during the inspection was written material provided to the l licensee by the inspectors. The licensee did not indicate that any 'l proprietary information was contained within the scope of this inspectio '
i
i i
!
,
l
!
!
!
!
l i
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _
__.;
i
.
I
.
.
Attachment 1 Surveillance Procedures Reviewed
.
Reactor Building to Suppression Chamber Self Activating Vacuum Breaker Surveillance Test and IST, Procedure No. 604.4.003, Rev. ,
'
Core Spray Header Differential Pressure Test and Calibration, Procedure No. 610.3.004, Rev. 1 i
Excess Flow Check Valves Functional Test, Procedure No. 604.3.00 * Control Rod Scram Insertion Time Test and Valve IST Test, Procedure N !
617.4.003, Rev. ]
l
ARPM Surveillance Test and Calibration, Procedure No. 620.3.003, Rev. 1 *
ADS Actuation Circuit Test and Calibration, Procedure No. 602.3.005, Re . '
l
High Flow in the Main Steam Line Test and Calibration, Procedure N I 619.3.005, Rev. 1 j
-
Main Station Weekly Battery Surveillance, Procedure No. 634.2.002, Re .
Diesel Generator Load Test, Procedure No. 636.4.003, Rev. 2 *
Diesel Generator Inspection, Procedure No. 636.1.010, Rev. *
Diesel Generator Automatic Actuation Test, Procedure No. 636.2.001, Rev. 1 *
Shutdown Cooling Valve Operability and IST Valve Test, Procedure N .4.002, Rev. 3, *
Emergency Service Water Valve Operability Test Procedure No. 608.4.001, Rev. *
Scram Discharge Volume Vent and Drain Valve Functional Test Procedure N .4.022, Rev. *
Reactor Building Closed Cooling Water System Valve Test, Procedure N .4.002, Rev. 5.
- _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ . l
-
l s
Attachment 1 2
.
Other Documents Reviewed
Administrative Procedure 112.1, Technical Specification Supporting 1 Installed Instrumentation, Rev. 2 i
Administrative Procedure 116, Surveillance Test Program, Rev. 2 i
- Administrative Procedure 104, Control of Nonconformances and Corrective !
Action Rev. 1 i
Licensing Procedure 006, Plant Technica'l Specification / Operating License ,
Change Control, Rev. *
Licensing Procedure 002, Regulatory Correspondence Control, Rev. * Deficiency Reports: ,
{
87-017 87-146 )87-045 87-168 1 87-091 87-169 87-092 87-210 l
l
-
Oyster Creek Station Tech Spec Log Sheet, Procedure 106, Attachment )
l
Inservice Testing Program Submittal, Rev. 5, 3/12/8 I