Environ Qualification Enforcement Conference Rept 50-219/85-39 on 881020.Major Areas Discussed:Significance of Concerns Re Environ Qualification of PVC Tape Splices & Limit Switches Associated W/Msivs.Related Info Encl
ML20206D013
Person / Time
Site: Oyster Creek
Issue date: 11/01/1988
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20206C998 List:
References
50-219-85-39-EC, GL-88-07, GL-88-7, NUDOCS 8811160503
Download: ML20206D013 (40)


See also: IR 05000219/1985039

Text

f-

-)

.

.

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report No.

50-219/85-39

Docket No. 50-219

License No.

DPR-16

Licensee: CPU Nuclear Corporation

Facility Name: Oyster Creek

Conference At: NRC Region I, King of Prussia, Pennsylvania

M.eeting Conducted: October 20, 1988

Approved by:

dch

L

//

6'T

,

J. Ourr, Chief, Engineering, Branch

' dhte

Conference Summary:

Environmental Qualifiation (EQ) enforcement conference

held to discuss the significance of concerns about the environmental

qualification of PVC tape splices and Limit Switches associated with the MSIVs

and to discuss the findings of an investigation by the NRC Office of

Investigation (OI) concerning the accuracy and completeness of information

provided to the NRC concerning the identity and equipment qualification status

of terminal blocks.

8011160503 nej jo4

gDR

ADOCK 05000219

PNU

_.

.

.._

__

-

__

.

.

.

.

DETAILS

I

.

'

1.

Attendees

I

GPU Nuclear Corporation

E. E. FitzPatrick, Vice President and Director, Oyster Creek

i

R. F. Wilson, Vice President and Director, Technical Functions

K. Neddenien, Communications

0. K. Cronenberger, Director of Engineering and Design

J. L. Sullivan, Licensing Manager

'

M. W. Laggart, BWR Licensing Manager

i

Y. Nagai, Licensing Engineer

P. S. Smith, Systems Engineering

l

A. P. Agarwal, Technical Functions

-

E. Pagan, Equipment Qualification Manager

i

J. Mancinalli, Manager Equipment Qualification

!

1

Shaw. Pittman. Potts and Trowbridge

!

i

l

j

T. A. Baxter

l

l

New Jersey Bureau of Nuclear Engineerina

l

M. Jacobs

i

R. E1 bright

!

4

Nuclear Regulatory Commission

T. Martin, Director of Division of Reactor Safety

l

'

j

W. Kane, Director of Reactor Projects

3

'

W. Johnston, Deputy Director of Division of Reactor Safety

l

1

L. Cheung, Sr. Reactor Engineer

l

J. Luehman, Enforcement Specialist. Office of Enforcement

H. Walker, Reactor Engineer, NRR

"

j

A. Oromerick, Project Manager, NRR

-

W. Baunack, Project Engineer

j

,

E. Collins, Resident Inspector

,

L. Marsh, Branch Chief EMEB, NRR

[

1

i

L. Bettenhausen, Chief of Projects Branch 1

D. Holody, Enforcement Officer

!

,

)

J. Gutierrez, Regional Counsel

!

C. Cowgill, Chief of Projects Section 1A

[

<

!

C. Anderson, Chief of Plant Systems Section

1

2.

Conference Scope

-

L

The enfo.;ement conference considered the following potential EQ

!

4

j

violations:

!

)

PVC tape splices

j

,

,

!

!

!

i

__________-- _

~

.

.

!

-

!

3

.

-

i

Namco Limit Switches

The scope of the discussions included:

l

t

Number of deficiencies and number of systems and components

affected

i

<

t

Specific and underlying cause of each potential violation

~

Actions taken or planned to correct the individual potential

'

violations to ensure overall compliance

i

,

A discussion of each potential violation in light of the Modified

Enforcement Policy for EQ requirements, GL88-07

1

'

The enforcement conference also included a discussion of the findings of an

investigation by the NRC Office of Investigation (N) concerning the accuracy

and completeness of information provided to the NL concerning the identity

and equipment qualification status of terminal blocks.

'

The scope of discussion regarding the terminal blocks included:

EQ walkdowns for terminal block identification

!

The basis for the statement on December 5, 1985 that only three

types of qualified blocks were used at Oyster Creek

,

i

The basis for the conclusion on December 5, 1985 that Weidmuller

terminal blocks were qualified despite known de?iciencies in the

i

terminal box enclosures

3.

Licensee Presentation

b

The licensee presented their position on the issues of concern. The

licensee presentation is outlined in their handout which is provided as

Attachment A to this document.

4.

Conclusion

The NRC staff stated that the licensee input will be considered in

assessing the NRC handling of the potential enforcement items. The

licensee will be notified of appropriate enforcement actions in the

future.

l'

e HvLed

A

'

I.

NRCENFORCEMENTCONFERENCE

I

XINGOfPRUSSIA,PA

OCTOBER 20,1988

I

AGENDA

I

o

INTRODUCTION

I

o

STANWICKTERMINALBLOCKS

I

SE@ENCE Of EVENTS AND RELATED ISSUES

J.MANCINELLI

'l

01 SYN 0PSIS

R.F. WILSON

I

o

LIMITSWITCHES/PVCTAPE

E.J. PAGAN

I

BACXGROUND

-

UN Of "S

'I

E@lPMBI AffECTED

g

CORRECTIVEACTIONSTAKEN

AWARENESSPRIORTONOV.30,1985

.I

,I

I

I

I

I

g.

.

I

l

SE@ENCE Of EVENTS

I

APRIL,1984:

TOTALREVIEWOf0.C.-EQPROGRAM

g

g

MAY,1984:

RECEIVED NRC LETTER Of MAY 9, RE@ESTING RECERTIFICATION

-PROVIDEDADDITIONALGUIDELINES

l

SEPTEMBER-

I

OCTOBER,1984:

COMPLETEDMASTERLISTREVIEW-SUBSTANTIALGPANSION

I

DECEMBER,1984:

GPUNRESPONDEDTONRCMAY9,1984 LETTER

I

W,1985:

NRCISSUESSAFETYEVALUATIONGRANTINGANEXTENSIONFOR

I

10CfR50.49(g)TONOVEMBER30,1985

I

OCTOBER 19,1985:

BEGINNINGOf10H0VTAGE,FOREQUIPHENTQUALIFICATION

I

NOVEMBER 15,1985:

0VSTERCREEKCOMPUTES10HOUTAGE,COMPUTINGEQ

l

M00lfIGTIONS

I

NOVEMBER 26,1985:

GPUN ISSUES ETTER DOCUMENTING R IA E WITH 10 U R

50.49

g

.I

I

lI

<

I

'

I.

I

DECEMBER 5,1985:

DISCOVERYOfSTANWICKTERMINALBLOCK

DECEMBER 6,1985:

GPUNDOCUMENTSTHEOPERABILITYOffHESTANWICKTERMINAL

g

BLOCK

I

DECEMBER 13,1985

FINAlllATIONOfSTANWICKTERMINALBLOCKEQfiLE

I

HARCH24-27,1986:

NRCINSPECT10N0FOYSTERCREEKEQPROGRAM

g

g

MY,1986:

GPUNINITIATESCOMMONITEMREVERIflCATIONPROGRAM

l

RY,1986:

REVERIFICATIONPNAMISCOMPLETED

I

AUGUST 8,1986:

NRCISSUESINSPECTIONREPORT86-08,WITHFIVEP0TENTIAL

ENFORCEMENTlVNRESOLVEDITEMS

g

l

AUGUST 2,1988:

NRCISSUESENFORCEMENTCONFERENCENOT!CE

.I

I

I

I

I

I

-.

l-

-

swWICK mMInl block

-

I

0YSE CREEK PERAM FOR IDENTIFICATION /VERIFIGTION

,

I

'

GPUN C0fl00CTED A TOTAL PROGRAM RE-EXAMINATION PER flRC'S MAY 9, 1984

I

REQUESTINGURTIFICATIONANDPROVIDINGADDITIONALGUIDE

I

ESTABLISHPLANILEVELFUNCTIONALCRITERIA

l

SELECTBR$WENVIBMENTEVENTS

I n n e sYs s $

I

EVELOPCOMPONENTLIST

I

,

I

Basis FOR THE LIST, IN ACm0ANa WITH THE mY 9,1984 lmER, M$:

,

I

TECHNICAL SPECIFIGTIONS

I

EMEENCY OPEWING PROG 0VRES

I

PEES $ANDINSTRUSTATIONDIAGRAMS

l

ELECTRIGLDISTRIBUTIONDIAGRANS

I

I

I

I

_-

-

- _ - - - - - - - -

f

THECOMP0NENTLISTHETH000LOGYUSEDTAGNUMBERSASTHEPRIMARY

[

10ENTIflCATIONFOREVALUATION:

[

FOR COMP 0NENTS WIh0VT TAG NUMBER'S (COM G ITEMS), NEITHER

TECHNICAL SPECIflGTIONS

[

EHERGE C OPERATING PROCEDURES

[

PIPINGANDINSTRUMENTATIONDIAGRAMS

[

ELECTRIGL DISTRIBUTION DIAGRAMS

[

COULD BE USED FOR COMPONENT IDENTIFIGTION

[

c0H e ITEMS WERE IDENTIFIED USING:

[

PROCUREHENTRECORDS

REVIEW 0F PREVICOS AND ONG0ING PLANT K00lflGTIONS

[

[

[

[

[

[

f

- - -

- - -

g.

.

I

'

flELD WALK 00WNS FOR EQ DOCUMENTATION WERE CONDUCT

I

VERIFY:

LOCATION,MANUFACTURERANDMODEL

RECONCILE:SPECIALEQREQUIREMENi$

I

IDENT!fY:

SUBCOMP0f0TS Of PREVIOUSLY IDENTIFIED WOST COM

I

FOR MG ITEMS IT W S @CLUDED TMI MLK00MS WERE SOMETIME

I

INCONCLUSIVEANDIMPRACTICAL.

I

THE F0LLOWING MLK00MS WERE CONDUCTED PRIOR T0 fl0VEMBER 30,1985:

I

SAMPE MLK00MS Of H0ST CCMONENTS TO SUPPORT THE ORIG

'

I

MSTEk LISI SUBMITTAL IN 1980

CCT08ER, 1984 WALK 00 M Of ALL H0ST D P0NENTS CURRENTLY ON TH

'

l

MSTER LIsi

I

NOVEMBER 1984 TO JULY 1985, MLKCCM Of ALL NEW HOST GPONENTS

'

ADDED TO THE MASTER LIST PLUS EXISTING H0ST M P0NENTS

g

g

NOVEMBER 1984 TO JULY 1985, MLKCCM Of CERTAIN COMP 0NENTS T0

'

IDENTIFYSUB3P0!aTSANDSPECIALINTERfACESe.g.LIMITORQUES,

,

l

MOTOR @ TROL CENTERS, TERNIE L B0XES, PENETRATIONS

I

I

_

- ---

- --

t

0YSTERCREEKTERMINALBLOCK10ENTIflCATION

'

IT WAS ORIGINALLY DETERMINED THAT TERMINAL BLOCKS SHOULD NOT B

.

IDENTIFIEDBYWALK00WN

- DECISION NOT TO DISCONNECT TERMINAL BLOCKS FOR SAFETY REAS

(

(

'

ORIGINAL IDENTIFIGTION WAS BASED UPON REVIEWING PROCUREMENT

RECORDS,EVALUATINGORIGINALPl!SCONSTRUCTIONANDREVIEWING

H00IFIGT10NS TO THE PLANT

'

(CALIFICATION WOULD BE PERFORMED FOR WRST GSE PEAK TEMPERATURE,

PRESSURE RATATION AND HVH10lTY TO ENSURE CONSERVATISH FOR ALL

APPLIGTIONS

(

[

[

[

{

{

I*

'

.

I.

I

BASELINE EVALVATION Of PROCUREMENT 0%UMENTATION AND OR

g

CONSTRUCTION INF0MATION IDENTIFIED - GENERAL ELECTRIC E

I

Bl%KS

I

IN RESPONSE TO TER H, GPUN REPUCED ALL DRYWELL TEMIML BLXX$

'

I

WITWWEIDMULLERBLIX$

I

INSPECTIONSWERECONDUCIEDTOVERIfYENCLOSUREREQUIREMENT

'

l

WEEP H0LES FOR WEIDMULLER TEMIBL Bl%XS

CiRTAINTYPESOfEQUIPMENTCONTAININGTERMIMLBLXX$ASI

'

I

COMP 0NENTS WERE INSPECTED, LIMITORQUE VALVE OPERATOR $, MOTO

CENTERS,$WITCHGEAR

I

OURING AN INSPECTION Of GE MOTOR CONTROL CENTERS A ST

TERMINAL BLOCX MS IDENTIFIED IN JULY 1985, IT MS $USSEQUENTLY

I

QUALIflED AND ADDED TO THE EQ MSTER LIST

I

I

I

I

I

- - -

I'

'

I

l

EMS PRECEDIE DECEMBER 5,1985

I

PROCEDURE 105.3, "MAINTENANCE OF ENVIRONMENTALLY @ALIFIED

I

EQUIPMENT" IDENTIFIED G000 PRACTICES WHICH WERE

I

'

DEVIATION REPORT ISSUED NOVEMBER 26, 1985 REPORTED VARIOUS

g

DEVIATIONSASSOCIATEDWITHTHERE-23PRESSURESWITCHES

I

THE DEVIATION REPORT E CONVERSATION WITH PBNT MGEMENT

I

CONFIRMEDTHATALLDEVIATIONSWOULDBEREPAIREDBYNOVEMBER30,1985

I

I

'

NOVEMBER 29,1985 A FELCW-UP CONVR$ATION WITH MAINTERE PBM

AND MGER 0F EQ CONFIRMED THAT DEVIATIONS 't0A0 BE CO

l

NOVEMBER 30,1985

I

I

I

I

I

'I

lI

L

I

'

.

I.

I

'

IT WAS DISCOVERED DURING THE F0LLOWING WEEK THAT THE DE

I

NOTBEENCORRECTED

I

g

THEEQSTAffCLARIFIEDANDINTERPRETEDDEFICIENCIES:

- DID MY APPLY TO THE PRESSURE SWI!G OR TllE

g

TERHIML B0X OR M TERMINAL BLOCK OR A G8tE

l

JUNCTIONB0X?

- WMI SGEW'S E RENNERS WERE HISSING?

I

I

M ONLY P0TMIAL DEVNION MS M MISSING GASKET ON M TEMIM

'

B0X

I

l

MEQFILESFORSWESZWMMGEMEEBDIDNOTREQUIREGASKETE

'

TEMINAL E0XES AND BOTH flLES WERE BASED UPON TESTING

g

BLCCKS TO M OIRECT EFFECTS OF STEAM AND M0ISTURE, FURTHEMORE T

l

EQ FILE FOR WEICMULLER TEMINAL BLOCKS DID NOT R

TESTING DID EXPOSE M BLOCKS TO STEAM WITHIN M N M 4

I

I

I

I

I'

'

.

I.

I

l

'

ON DECEMBER 5, 1985, BASED UPON THE EQ 10ENTlflCAT10N Eff0RT, ONE

THREEBLOCKSCOULDHAVEBEENINSTALLEDWITHTHERE-23'S: GENER

I

ELECTRICEB,WEIDMULLERORSTATESZWM

I

DURING AN INSPECTION THAT DAY IT WAS DETEMINED THAT THE

'

I

TEMINAL BLOCKS IN QUESTION WERE STANWICK TEMINAL BL

I

-

'

WITHIN A MITER Of HOURS, GPUN B0 RBS0MBLE ASSUMNCE IMI THE

I

BLOCKSCOULDPERF0MTHEIRSAFETYFUNCIl0N

I

'

DECEMBER 6, 1985 GPUN DOCUMENTS THE CONCLUSION THAT STANWICK

I

TEMINAL BLCCKS ARE OPEMBLE AND QUAllflABLE

I

'

ON DEUMBER D,1985 GPUN CCMPLETED THE EQ file FOR SIMICK

g

TEMINAL BLOCKS

I

I

I

I

,I

I

- --

.

I

I'

E.

\\

I

GPUNEQEVALUATIONOfWEIDMUI.LERTERMINALBLOCKS

I

'

TEST BLOCKS WERE SUBJECTED TO A 29 HOUR STEAM AND CHEM

g

WITHTEMPERATURESANDPRESSURESINEXCESSOFOYSTERCREEKWORSTCA

l

OBEPROFILE

I

'

TEST BLOCKS WERE MOUNTED IN NEMA 4 ENCLOSURES WITH N0

I

ANDWITHOVERSIZE0 CONDUIT 80LES

I

'

EXISTING EQ FILE DID NOT HAVE ANY LIMITATIONS REQUIR

I'

GASKETS

I

'

RE-2T S PRES $URE SWITC H ERE LCO TED OUTSIDE THE DRYWELL

I

TURBINEBUILDINGAWAYFROMTHEDIRECTIMPACTOFANHSLBANDWITHOU

EXPOSURE TO CHEMIGL ! PRAY

g

I

I

I

I

I

I

g.

.

I

I

I

I

SIEEWEI0MULLERTERMINAL6LOCKSWEREEXPOSEDTOTHEDIRECTEffE

'

l

Of STEAM AND M0ISTURE AND SIEE N0 OTHER ASPECTS Of THE EX

g

QUALIFICATIONWEREINQUESTIONTHEEQSTAffC0ELUDEDTHA

JUETIONB0XcASKETWASNOTREQUIREDANDTHATIfWEIDMULLERT

I

BLOCKS WERE eSCCIATED WITH RE-23A, B, C, 0 THEHERE QUALIFIED

I

I

'

THE EQ SWF ALS0 DETMINE0 THAT USE Of "GENERIC @0

I

105.3WASMISLEADINGANDOVERCONSERVATIVEANDTHATAREVISIONW

I

RE0JIRE0

I

I

I

I

I

I

I

I'

'

.

t

I

A REVERIFICATION COMPLETED I U ULY, 1986 IDENTIFIED THE EXISTE U 0F

I

THREETYPESOFGENERALELECTRICTERMINALBLOCKS:

I

GEEBTYPE

I

GE CR 151 A

GECR1518

,g

ALLCONSTRUCTED0FGEELPURPOSiPMLICSWHICHEREDETEMIE

g

TO BE SIMILAR AND @ALIflE0 USING THE SAME DBE TEST

g

I

E

I

A SEEMEMIML BLCG CONSTRUCTED 0F GEMt PURPOSE PMLIC

>I

WHICHAS ALS0 @ALIFIED UTILIZING EXISTING TEST DATA.

'I

I

I

-

1

I

g.

.

.

I

I

CONCLUSION

I

I

GPUN'STECHNICALJUDGEMENTPRIORTOAWDAfTERDECEMBER5,1985HASBEEN

I

C0iiiiRMED TO BE CORRECT AND THERE RAS N0 SAFEiY SIGNIflCANCE

'l

THEDISCOVERYOfTHESTAMCXTERMINALBLOCK.

'I

I

I

I

\\

I

.

I

ll

'i

1

ll

t

.

.

I,

01SY9PSIS

I

I

I

o THE 01 SYN 0PSIS CONCLUDES THAT:

g

.

"

GPUk Provided false information with careless disregard for its

!

accuracyandcompletenesstotheNRC..."

...

I

A MAJOR CONTRIBUTOR FOR THIS CONCLUSION N A STATEHENT MADE BY

PLANTSYSTEMBRANCH(PSB)INDIVICUALWHILHSAID:

g

"

GPUN should have completed a 10M field "walkdown' prior to November

...

I

30,1985toensurecompliancewith10CFR50.49."

I

I

.

I

I

~

I

'I

I

I

I

1

--.A

.

g.

.

'

I

'

IDENTIFICATIONVS. VERIFICATION

'I

I

I

I

oINITIALEff0RTSTOCOMPLYWITHTHEEQRULECANBEBROKENDOWNINTO2 AR

>l

- IDENTIflCATION 0F WHAT SHOULD BE INCLUDED IN THE MASTER LIST.

g

- VERIFICATION Of THE IDENTif!ED COMP 0NENTS AND THE TYPE (e.g.,

.

MANUFACTURER,M00L)0FCOMPONENTSINTHEFACILITY.

O

o 01 SYN 0PSIS IS CONCERNED WITH VERiflCATION ASPECT (i.e., A LACK Of 1001

g

WALKDOWN).

!l

I

I

I

I

I

I

I

I

L.

.

6

I

VERIFICATION M IREMENT

[

.,

(

o BASED ON OUR REVIEW Of EXISTING DOCUMENTATION,1001 WALMN WAS NOT BEEN A

REQUIREMENTOfNRC.

o M HENTATION REVIEWS INCLUDED:

[

- NRC CORRESPONDENCE T0 GPUN:

- M LATION (50.49)

- NRC GUIDAKE DOCUMENTS

[

- INSPECTION REPORTS FOR GPUN OR OTHER FACILITIES

0 NRC INSPECTION HISTORY f0R OTHER PLANTS ACCEPTED LESS THAN 1001 W

[

[

[

[

[

[

[

[

f

-

-

_ -

g.

.

I

'

I

a man

I

I

l

0 IT IS UNCLEAR WHAT GLD CONSTITUTE A E WALK 00WN IN THE CONTE)(T O

01 SYN 0PSIS

-VERIFICATION 0FSUSCOMP0NENTSELOREQUIREDISASSEMBLY0FEACHP

I

MPONENT

I

- VERIFICATION 0F SCHE CO M ITEMS (e.g. ALL CABLE AND HIRING) IS NOT

l

PRACilCAL

I

o GPUN PMAM PROVIDED REASONABLE ASSURE THAT EQ FILES REPRE

$

CONFIGURATION

I

lI

'I

'I

lI

I

I

- - - - - - -

E

C

GPUPOSITION~

0 GPUN AGREES WITH THE 01 SYN 0PSIS CONCLUSION THAT DURING THE DECEMBER S,

1985 TELEPHONE CONFERENCE, THE GPUN MANAGER 0F EQ 010 NOT KNOWINGLY OR

r'

INTENTIONALLY PROVIDE INACCURATE INFORMATION.

[

0GPUNBELIEVESTHATAPPR0ACHESTAKENT0 IDENTIFY,VERIFYANDQUAllFYEQ

[

COMP 0NENTSATOYSTERCREEKWEREDONEINAREASONABEMANNER

TOASSURETHATOYSTERCREEKMEEISTHEREQUIREHENTSOF10CFR50.49.

[

[

[

[

[

r

L

[

[

_ - - _ - - _ - _ - _ .

_

-

--- ---

.

.

l

f

0 HOWEVER, GPUN STRONGLY DISAGREES WITH THE CONCLUSION THAT A LACK Of 1001

(

WALX00WN(VERIflCATION) CONSTITUTE"Carelessdisregardforitsaccuracyand

completeness".

.

l

-N0REGULATORYGUIDANCEREQUIRING1001WALX00WN

- NRC KNEW OR SHOULD HAVE XN0WN THAT 1001 WALX00WNS Of COMON ITEMS HA

l

NOT BEEN CONDUCTED AT OCNGS, BASED ON GPUN NOVEMBER 26,1985 LETTER.

-

- STANDARD Of CARE BEING PURSUED BY INDUSTRY AT THAT TIME, CONSISTENT WIiB

.

GPUN EQ PROGRM

- ONE STlFF MEMBER'S OPINION 3 YEARS LATER ABOUT WHAT "SHOULD HAVE" B

DONEiESNOTESTABLISHAREIR0AUIVESTANDARDWHICHGPUNFAIRLYCANBE

FOUNDTOHAVEKNOWNAN0l0RIGNORED.

'

-GPUN15NOTAWAREOfEQMASTERLISTOMISSIONSBYOTHERUTILITIESWHICH

HAVE BEEN FMD TO CONSTITUTE CARELESS DISREGARD FOR THE ACCURACY OR

COMPLETENESSOfTHEINFORMATIONBECAUSEA1001WALX00hNWASNOT

r

l

CONDUCTED.

!

I

,

L

- - - - - - - - -

-

--

-

-

- - - - - - - - - -

f

(

(

LIMITSWITCHESFORWS!V'S(86-08-04)

BACKGROJND

[

[

' four Main Steam Isolation Valves (HSIV'S)

[

' Each HSIV is Equipped With Three (3) Sets of Limit

r

L

SwitchesTcatAreRequiredToBeQualified.

r'

Position A - full Open - Position Indication

[

Position B - Full Closed - Position Indication

[

Position 0 - Ten Percent Closed - Scram Signal

[

[

[

[

[

[

L

[

I

---

--

L.

~ .

. _.

_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ .

.

E

.

[

[

- _

.

- -

[

NS03A

ggo35

V-t- 7

y. g . g

75"

V8 Liwi

uwT @v

,o,

S w. gn

(

Ag sw.

_

.

[

OAvwgLL

>

< /// sis,1111111,111111,11111111111111111111,, rs ,11 ,1 ,11 ,2

L

v i ,117 ,n i.

r

<

E

E

NSC4A

NSoAs

"

4

L

v-i- 9

y.t.io

Tr

v3 Luir

tuir gv

v

C

OM Su

sw 30

=

p

L

y

d

p

mtCIRC.

[

d

T11MWHCN 200M

g

L

y

tr11111111b M*

/ ,77777111


11gg----r111111111111111111111111111.

g: . :

t

L

~.

-

-

/

QATlR SAY

L

,,

sW

-

L

[

-

5

-

-

-

- - - - _ _ _ _ _ _ _ _ __ . _ _ . _

_

_

- - - -

-

- -

- - - - - -

.

.

I

BACKGROUND

g

I

  • NAMC0 MODEL EA740 - 50100 SERIES

g

l

' @ALIFIED PER NAMC0 QIR III

I

' $ WITCH LEAD $ WERE PIPE 0 OVi Of TEST CHAMBER

'I

'NAMC0INDICATESPERQTR111;

I

"itisthecustomer'sresponsibilitytomaintainthe

integrityoftheswitchenclosure&preventtheentrance

g

ofhostileenvironmentthroughtheconduitentrance."

I

'GPUN'SPOSITIONATTHATTIg

I

MSlyNAMC0LIMITSWITCHINTERNALSWEREISOLATEDFROM

l

HAR$H ENVIRONMENT BASE 0 ON THE C0!iilGURAIION.

g

- LI@l0 TIGHT flTT!NGS

-LIQUIDTIGWiFLEXIBLEWlRlhGCONDUIT

l

-GASKETEDTERMINAL60X(WITHWEEPH0LES)

-RIGIOWIRINGCONDUli

I

I

I

I

---

a

__1

. _ _ . - _ .

. - - - . *

s

__A_

a

34_ . _

a

-,-

--aa

m

- . . . ,

s --. .

.--*

Ih

e

.

s{s

.

\\

g

d

\\

.

w

I

g2

,

-

w u s111s

_

I

.-

. .

i

'

g

y

.

  • * --* Q

,

,

G

_0

e1

. .y.

-

-

g

.

G

'

'

-

g

e

1 ~3

t

3-

mE

p

o

O$

. h

<n

f

h

g

7

8

. ,

m

=

E

'

tJ

5

b3

i

.

a

,

B

l

.

e

l

r.

1

3

%

l

2

-

"

.

y

% W e'

>

'. e

o es

7)

{

-

- 3

QE

s

!

a48

e

u

d

.

,

4

!

we

Fa

a

-

t

4p

. Q

uU

>

-

y

g

au

W

!

3

'

t-

'

I

a

'

I

'

'

,

'

i

I

I

'

,

'

I

r

f

i

l.

I

1

.----. , , .--.

_.e+

, , _ _ _ _ _ _ _ _

.

.

.

I

C M LOGY Of EV M S

I

'

WOVEMBER 25, 1985:

GPUNCOMPLETESREV.20FNE0llHIT

I

SWITCHEQfiLE

l

'

MARCH 24 TO 27, 1986:

NRCINSPECTION86-08

g

april 12, 1986:

END Of CYCLE 10, BEGINNING Of THE

llROUTAGE

I

'

APRll 22, 1986:

GPUNISSUESWORKREQUESTT0 INSTALL

g

QUAllflE0 CON 0VIISEALS

AUGUST 20, 1986

GPUN10ENTIflESSEALINSTALLATIONAS

g

COMPLETED

I

'

SEPTEMBER 12, 1986:

EQ FILE REVISED TO REfi.ECT THE

SEALED CONflGURATION

g

'

DECEMBER 28, 1986:

0YSTERCREEKWENTCRITICAL

'

JANUARY 8, 1987:

GPUNSENDSLETTERTONRCINRESPONSE

I

T0INSPECTIONREPORT86-08

I

I

I

I

I

I

-

- - - -

l

(

EQUlfMENTAffECTED

,

NUMBER Of P0TENTIAL DEFICIENCIES

'

'

-ONE-

-

(

NUMBEROfSYSTEMSP0TENTIALLYAffECTED

'

-TWQ-

-REACTORISOLATIONINDICATION-

- REACTOR PROTECTION SYSTEM -

NUMBEROfCOMP0NENTSP0TENTIALLYAffECTE0

'

- 16 NAMC0 LI C SWITCHES -

(F0URSWt!CHESPERHSIV)

[

[

[

{

(

[

L---

- -- -

-

,.

.

i

I

C0ECTIVEACTIONS

I

I

'

R s CAUSE

I

- OlfFER E ES I N V E MENT BETWEEN GPU U E

I

IF:!0R$REGARDINGHETH005FORPREVENTINGTHE

ENiWJ Of HOSTILE ENVIPONMENT INTO THE SWIKW

I

INTERRALS.

I

'

CON 0VII S BLS WERE INSTALLED ON ALL HSIV K E 0 llHIT

I

SWITCHES DURING THE llR MAGE WHICH BEUN april 12,1986.

I

EQ FILE WAS REVISED PRIOR TO RESTART TO REFLECT THE

'

g

SEALEDCONflGURATION.

I

'

'

ON A PREARUIC BAS 15, GPUN HAS REFSATTED

g

APPR0XIRATELY351OfALLEQFILESANDWASNOT10ENTlflE9

l

ANYSIMILARPROBLEMS

'

I

I

I

I

,.

.

i

l

AMRDESSMORT0PBBEU0,1985

I

'

GPUN BD VB00R SUPPLIED (EUMBTATION 080NSTRATING TBT

I

NAE 0 LIMIT SWIKHES WERE @AllflED

I

'

'

GPUN 010 PERf2 FIEu .sRIflGTION A2 JUDGE 0 THAT THE

g

INSTALLEDCONflGURATIONHAKHEDTHATOfTHETEST

l

CONFIGURATION

'

GPUN 010 OT HAVE PRIOR NOTICE THAT ANY DEflCIBCIES MIGHT

I

mST,NORWEREWEAMREOFOTHBLICBSEESIDENTImNG

@ALIFIGTION PROBLEMS.

.

'

E

I

I

I

I

,

I

I

I

.

..

-

, . .

.

i

sumRy

I

"BEST Eff0RT TO MPLUE EQ WINN THE DB0UNE"

'

I

-0YSTERCREEKEQFILESWEREALLCOMPLETEDBYTHENOVEMBER

g

30,1985 DEADLINE

- 0VSTER CREEK WA0 A DEDICATED SHVIGN FROM OCTOBER 19,

g

1985 TO NOVEMBER 15,1985 TO IMPLEMENT EQ MPLIAEE

l

H00lflCATIONS

- MSIV NAK0 LIMIT SWIKHES WERE ALL REPLACED WITH

g

QUALIflE0 LIMIT SWIKHES IN ACCORDANCE WITH fRC IER

i

  1. 64

I

'

SUBSEQUENT TO INSPKTION 86-08, GPUN DETERMINE 0 THAI THE

COMP 0NENTINTERfACEASPKTOfTHENAMC0EQflLENEEDEDT0

g

BE ADDRE55E0 FURTHER

I

'

NEW QUALIFIED SBLS WERE INSTALLED

'

GPUN SHCOLD NOT HAVE KNChN

g

I

I

I

.

I

I

~

- - - - -

- - - - - _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _

S

9

PVCTAPESPLICE,(86-08-05)

.

BACKGROUND

)

1

EQ file OC-388 @ALIflED PVC TAPE SPLICES.

'

INSPECTION REPORT 86-08, @ESil0NED THE FACT THAT FUNCTIONAL

'

PERFORMANCE RE@lREHENTS, E.G., INSULATION RESISTANCE, FOR PVC TAPE

WERENOTARALYlE0.

0YSTERCREEKUSEDPVCIAPEONTHEF0LLOWINGINSTRUMENTCIRCUITS:

'

-

IP-15B AND 0, HIGH DRYWELL PRESSURE SWITCH - CONTAINMENT SPRAY

-

RV-46A, B, C, & 0, HIGH DRYWELL PRES $URE SWITCH - CORE SPRAY

ANDADS

GPUN'S @AllflCATION RAS BASED UPON ANALYSIS AND GENERIC TESTING,

'

FUNCTIONALACCEPTANCECRITERIAR;$BASEDONSPLICEABILITYTOCARRY

,

0)RRENT AND HOLD V0LTAGE DURING DBA SIMULAil0N.

'

(

(

[

(

-

- - -

-

_ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _

, . .

.

i

CNRON m 0 n a s

E

EVEMBER 15,1985:

GPUNCWLETESPVCWEEQfiLE

'

g

g

'

HARCH 24 T0 27, 1986:

NRCINSPECTION86-08

l

APRIL 12,1986:

BEGINNINGOfTHEllR0VTAGE

'

!

JUNE 26,1986:

GPUN M flRMS PLANNED REMOVAL Of PVC

'

TAPE. SPLICES

g

I

EVEMBER7,1986:

GPUN IDENT!flES W E W AL AS M ETE

'

I

DECEMBER 1,1986:

REVISIONOfEQfilE15MPLE'E

'

I

DECEMSER28,'.986

0YSTERCREErWENTCRITICAL

'

JANUARY 8,1987:

GPUNSE9SLETTERTONRCINRESPONSET0

'

l

INSPEC!!0NREPORI86-08.

I

I

I

I

I

I

.

.

..

I

a

EQUIPMENTAffECTED

g

'

'

NUMBER Of DEflCIENCIES:

I

-ONE-

'

NUMBER Of SYSTEMS AfFECTE0:

-

g

l

-THREE-

I

CONTAINMENTSPRAY

l

CORESPRAY

g

AUT0DEPRESSURllATION

l

NUMBEROfC0kP0ENTSAffECTED:

'

I

- SIX CGPONENTS -

I

SIX HIGH DRYWELL PRESSURE SWIKHES

I

I

.

I

I

._

- - - - - - _ _ , _ _ _ _ _ _ , . _ _ _ _ . _ _

_ _ _ _ _

9

$

CORRECTIVEACTIONSTAKEN

'

ROOT GUSE

- PERFORMANCE SPEClflCATIONS WERE ADDRESSED USING TECHNIGL

I

JUDGEMENT IN LIEV 0F NUMERICAL ANALYSIS.

'

PVC WE SPLICES WERE REED AND REPUCED WITH CONTIWOUS WIRE.

'

,

- REPLACEHENT ACCOMPLISHED BECAUSE Of LER 82-25 COMMITHENT WH

RASNOTBASEDONEQ. CONCERNS

- REPLACEMENT NVER RESOLVED CONCERNS FOR FUNCT10BL

)

PERFORMANCEREQUIREMENTS

,

'

'

ADMINISTRATIVECONTROLSHAVEBEENIMPLEMENTEDTRATPR0HIBITTHE

FUTUREUSEOfTAPESPLICES.

(

(

[

t

(

[

.

- - - -

_ _

_ _ _ _ . _ _ _ _ _ _ _ . _

. _ _ _ _ _ _ .

_ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _

g. .. .

.

I

AWARENESSPRIORTONOVEMBER30,1985

I

i

I

'

GPUN @AllflCATION MS BASED ON AMLYSIS A@ GENERIC TESilNG

I

6 PUN COMPARED AS INSTALLED CONflGURATION WITH WALIflED

l

'

l

CONflGURATIONBASEDONFIELDINSTALLATIONPRACTICES.

l

LdNMSNOTAWARETHENNORAREWEAWAREN0WOfANYINFORMATION

'

'l

PROVIDEDTOLICENSEESBINRCORINDUSTRYONPVCTAPESPLICES.

L

I

~

I

! I

-

'I

I

I

I

I

I

-

- -

_ _ _ _ _ _ _ _ _ _ , .

, . . . .

b

I

l

sumy

.

1

- 0YSTER GEEK EQ FILES WERE ALL JLETED BY THE NOVEMBEU0,

1

1985 DEADLINE.

I

- 0YSTER GEEK HAD A DE0!GTED SHUMURCN0BER 19,1985 T0

g

NOVEMBER 15,1985, T0 IMPLEMENT EQ DPLIANCE H00lflGTIONS.

l

INSPEUION 86-08 RAS CMDUCTED REH 24 - 27,1986.

'

I

ilROUTAGEBEGANONAPRIL12,1986.

'

PVCTAPESPLICESREPLACEDNOVEMBER7,1986.

'

E

GPUNSHOULONOTHAVEKG

'

I

I

,

I

,

I

.

,

I

I

_-

,, o

,

0

I

NRC ENFORCEMENT CONFERENCE

D ,!

OCTOBER 20, 1988

GPb NUCLEAR VIEWS ON APPLICATION OF

NRC ENFOhrEMENT POLICY TO THE O! SYNOPSIS

While the O! Synopsia does not use the phrase "Haterial

False Statement," it concludes that GPUN provided false in-

formation to the NRC Ouring the December 5,

1985 telephone

co.tfererce "vitn care 10ss disregard for its accuricy and

completeness."

In adopting its final rule on Completeness and Accuracy of

Informatio3 on December 24, 1987, the Commission noted that

the term "naterial f alse statement" may be applied to cir-

cumstances cf "careless disregard" for completeness and ac-

curacy, where

bare is "a reckless regard or callou,9 indif-

forence towards one's responsibilities or the consequences

of one's actions."

The Appendix C (10 CFR 2) Enforcement Policy applies to the

alleged communication violation (not the separate EQ en-

forcement policy).

In adopting its rule, the Commission stated:

"a charge of

material false statement is equated by most people with

l

lying and an intention to mislead.

Because of this connota-

i

tion, the Commission believes the charge should be reserved

for such communication f ailures."

".

. the Commission is

.

reserving the use of this label as an addition.t enforcement

tool in egregious situations, which vill be determined on a

case-by-case basis."

"The Commission expects to use the

term rarely because with the adoption of this rule, the Com-

mission vill have the mechanism to apply the full range of

enforcement sanctions to inae urate communications or

records without reliance on ',he term material f alse state-

ment.'

'

The Commission reiterated that prior consultation with the

Commission vill continue for those cases in which the staff

recommends using the material false statement label.

The Commission also recognized the reasons why oral in-

l

farmation may in some situations be inherently less reliable

l

than written submittals.

In considering enforcement action on the communication, note

the short life of the inaccuracy, and the fact that if the

correct information had been provided initially, no adverse

regulatory action vould have been varranted.

l

l

L