IR 05000219/1998012 | 4 March 1999 | Insp Rept 50-219/98-12 During Periods 981214-18,990106-07 & 20-22.No Violations Identified.Major Areas Inspected: Review of Licensee self-assessment of Plant Environ Qualification Program & Corrective Actions for Open Items | |
IR 05000219/1998009 | 25 November 1998 | Insp Rept 50-219/98-09 on 980914-1025.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support | Shutdown Margin High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Hydrostatic Temporary Modification Foreign Material Exclusion Operability Determination Battery sizing Maintenance Rule Program |
IR 05000219/1998008 | 20 October 1998 | Insp Rept 50-219/98-08 on 980727-0913.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support | Safe Shutdown Shutdown Margin Temporary Modification Emergency Lighting Systematic Assessment of Licensee Performance Operability Determination Earthquake Fire Protection Program Coast down |
IR 05000219/1998005 | 26 August 1998 | Insp Rept 50-219/98-05 on 980614-0726.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support | High Radiation Area Temporary Modification Condition Adverse to Quality |
IR 05000219/1998007 | 2 July 1998 | Insp Rept 50-219/98-07 on 980615-19.No Violations Noted. Major Areas Inspected:Status of Plant motor-operated Valve Program to Determine Acceptability for Closure of NRC Review Under GL 89-10 | Stroke time Anchor Darling Operability Determination Weak link |
ML20217F664 | 22 April 1998 | Insp Rept 50-219/98-80 on 980223-0313 & 0330-0402.Violations Noted.Major Areas Inspected:Engineering | Safe Shutdown Stroke time Temporary Modification Power Operated Valves |
ML20216H191 | 15 April 1998 | Insp Rept 50-219/98-04 on 980226-0318.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support | Offsite Dose Calculation Manual |
IR 05000219/1997008 | 4 December 1997 | Insp Rept 50-219/97-08 on 971020-24.No Violations Noted. Major Areas Inspected:Onsite Emergency Plan | Locked High Radiation Area Earthquake |
IR 05000219/1997004 | 29 July 1997 | Insp Rept 50-219/97-04 on 970526-0706.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support | High Radiation Area Grab sample NJPDES Temporary Modification Job Performance Measure Process Control Program Siren |
IR 05000219/1997005 | 17 July 1997 | Insp Rept 50-219/97-05 on 970407-11.No Violations Noted. Major Areas Inspected:Engineering | Anchor Darling Squib |
ML20141G943 | 3 July 1997 | Insp Rept 50-219/97-03 on 970414-0525.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support | |
IR 05000219/1997002 | 19 May 1997 | Insp Rept 50-219/97-02 on 970224-0413.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support | High Radiation Area Grab sample Offsite Dose Calculation Manual Temporary Modification |
ML20137E949 | 21 March 1997 | Insp Rept 50-219/97-01 on 970113-0223.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support | Temporary Modification Double blade guide Systematic Assessment of Licensee Performance Flow Induced Vibration Operability Assessment |
IR 05000219/1996010 | 27 September 1996 | Insp Rept 50-219/96-10 on 960923-27.No Violations Noted. Major Areas Inspected:Radiological Source Term Assessment, Results of Exposure Reduction Initiatives & Evidence of Station ALARA Program | High Radiation Area Design basis earthquake Earthquake Scaffolding |
IR 05000219/1996011 | 2 January 1996 | Insp Rept 50-219/96-11 on 961021-1201.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support | Hydrostatic Temporary Modification Operability Determination |
IR 05000219/1993081 | 22 December 1993 | Insp Rept 50-219/93-81 on 930927-1015.Violations Noted.Major Areas Inspected:Engineering,Maint,Surveillance & Mgt & Corrective Actions | Hot Short Unanalyzed Condition Commercial Grade Dedication Hydrostatic Temporary Modification Emergency Lighting Operability Determination Earthquake Scaffolding |
IR 05000219/1993026 | 18 November 1993 | Insp Rept 50-219/93-26 on 931101-05.No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Access Control of Personnel & Packages & Vehicles | |
IR 05000219/1993024 | 18 November 1993 | Insp Rept 50-219/93-24 on 930921-1101.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering,Plant Support,Including Security & Emergency Preparedness & Safety Assessment/Quality Verification | |
ML20058A379 | 12 November 1993 | Insp Rept 50-219/93-23 on 931018-20.Onsite Response to Exercise Scenario Was Good.Major Areas inspected:full- Participation Ingestion Pathway Emergency Preparedness Exercise | |
IR 05000219/1993025 | 9 November 1993 | Insp Rept 50-219/93-25 on 931018-22.No Violations Noted. Major Areas Inspected:Design Mods & Engineering Support | |
ML20059F625 | 28 October 1993 | Insp Rept 50-219/93-22 on 930920-24.No Violations Noted. Major Areas Inspected:Addressed Open Items Associated W/Eop & Reviewed Licensee Actions in Response to Violations Associated W/Recirculation Loop Isolation Event | Condition Adverse to Quality Job Performance Measure |
IR 05000219/1993018 | 28 October 1993 | Insp Rept 50-219/93-18 on 930823-1020.No Violations Noted. Major Areas Inspected:Alara,Rirs,Qa Audits,Air & Swipe Sample Counting Facilities & Radiological Controls Organization Professional Staffing | Scaffolding |
IR 05000219/1993020 | 19 October 1993 | Insp Rept 50-219/93-20 on 930816-930917.No Violations Noted. Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs Including Mgt Controls & QA Audits | Grab sample Offsite Dose Calculation Manual |
IR 05000219/1993021 | 15 October 1993 | Insp Rept 50-219/93-21 on 930810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Safety Assessment/Quality Verification | Temporary Modification Fire Watch Hourly Fire Watch Operability Assessment |
IR 05000219/1993011 | 10 September 1993 | Insp Rept 50-219/93-11 on 930629-0809.No Violations Noted. Major Areas Inspected:Day Shift & Back Shift Hours of Station Activities | High winds Stroke time NJPDES GOTHIC |
IR 05000219/1993019 | 9 September 1993 | Insp Rept 50-219/93-19 on 930816-20.Violations Noted.Major Areas Inspected:Radiological Environ Monitoring Program & Meteorological Monitoring Program | |
IR 05000219/1993014 | 2 September 1993 | EP Insp Rept 50-219/93-14 on 930802-05.Concerns Noted. Major Areas Inspected:Epip,Equipment,Instrumentation & Supplies | Safe Shutdown Grace period |
IR 05000219/1993016 | 27 August 1993 | Insp Rept 50-219/93-16 on 930726-30.Major Areas Inspected: Erosion/Corrosion Insp Program,Per GL 89-08.Program & Program Implementation Generally Good.Staff Responsible for Program Development & Implementation Qualified | Non-Destructive Examination |
IR 05000219/1993012 | 26 August 1993 | Insp Rept 50-219/93-12 on 930706-09.No Violations Noted. Major Areas Inspected:Licensee Progress in Incorporating EQ Component Info Into GMS2 Computer Database | Operability Determination |
IR 05000219/1992022 | 19 March 1993 | Mobile NDE Lab Insp 50-219/92-22 on 921207-11 & 930111-15. No Violations Noted.Major Areas Inspected:Cs,Css,Sdc,Ms & FW Sys | Weld Overlay Nondestructive Examination Liquid penetrant Dissimilar Metal Weld |
IR 05000219/1992025 | 10 February 1993 | Insp Rept 50-219/92-25 on 921215-930118.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Maint & Surveillance,Engneering & Technical Support, Emergency Preparedness & Security | Shutdown Margin Non-Destructive Examination Anticipated operational occurrence Hydrostatic Coatings VT-2 Exemption Request Hardened vent Fuel cladding Coast down |
IR 05000219/1993001 | 29 January 1993 | Insp Rept 50-219/93-01 on 930104-08.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Postings & Other in Plant Radiological Controls,Work in Progress, Housekeeping & Self Reading Dosimeter Use | High Radiation Area Locked High Radiation Area |
IR 05000219/1992023 | 24 December 1992 | Insp Rept 50-219/92-23 on 921103-1214.No Violations Noted. Major Areas Inspected:Plant Operations,Security & Safety Assessment/Quality Verification | High winds Reactor Vessel Water Level Fire Barrier Hydrostatic Containment Hardened Vent Scaffolding |
IR 05000219/1991004 | 1 March 1991 | Partially Withheld Insp Rept 50-219/91-04 on 910204-07.No Violations Noted.Major Areas Inspected:Protected Area Physical Barriers,Isolation Zones & Lighting,Protected Area Access Control of Personnel & Security Training | |
IR 05000219/1990019 | 16 November 1990 | Insp Rept 50-219/90-19 on 900923-1020.Violations Noted. Areas Inspected:Radiological Protection,Surveillance & Maintenance,Emergency Preparedness,Security,Engineering & Technical Support & Safety Assessment/Quality Verification | High Radiation Area Temporary Modification Condition Adverse to Quality Scram Discharge Volume |
IR 05000219/1990020 | 2 November 1990 | Insp Rept 50-219/90-20 on 901022-26.No Violations Noted. Major Areas Inspected:Internal Exposure Control & Review of Procedures for Drywell Occupancy During Fuel Movement | High Radiation Area Locked High Radiation Area Scaffolding |
IR 05000219/1990016 | 18 October 1990 | Insp Rept 50-219/90-16 on 900823-0922.Violations Noted.Major Areas Inspected:Observation of Plant Activities,Review of Operational Events,Operation of Turbine Bldg Ventilation Sys & Walkdown of Emergency Diesel Fuel Oil Transfer Sys | |
ML20058F324 | 2 October 1990 | Insp Rept 50-219/90-17 on 900918-21.No Violations Noted. Major Areas Inspected:Transportation & Solid Radwaste Programs | |
IR 05000219/1990015 | 20 September 1990 | Partially Withheld Safeguards Insp Rept 50-219/90-15 on 900820-24 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Support,Security Program Plans,Audits,Protected & Vital Areas Physical Barriers,Power Supply & Testing | |
IR 05000219/1990011 | 15 August 1990 | Insp Rept 50-219/90-11 on 900610-0711.Noncited Violation Noted.Major Areas Inspected:Observation & Review of Plant Operations,Review of Radiological Controls & Routine Observations of Maint Activities & Surveillance Tests | Stroke time Safe Shutdown Earthquake Operating Basis Earthquake Siren |
ML20056A619 | 19 July 1990 | Insp Rept 50-219/90-09 on 900422-0609.Violations Noted. Major Areas Inspected:Observation & Review of Routine Plant Activities & Operational Events,Site Radiological Controls & Events & Observations of Corrective Maint Activities | |
IR 05000219/1989029 | 16 February 1990 | Insp Rept 50-219/89-29 on 891203-900106.Major Areas Inspected:Observation & Review of Plant Operational Events, Condenser Vacuum Transient,Unusual Events Due to Low Intake Water Level & Simultaneous Movement of Two Control Rods | |
IR 05000219/1989018 | 13 September 1989 | Insp Rept 50-219/89-18 on 890724-28.No Violations Noted. Major Areas Inspected:Review of Licensee Actions on Previous NRC Concerns,Atws Rule Implementation,Procurement Control & non-licensed Operators Training | |
IR 05000219/1989020 | 7 September 1989 | Insp Rept 50-219/89-20 on 890829-30.No Exercise Weaknesses Noted.Major Areas Inspected:Licensee Emergency Preparedness Exercise Conducted on 890829-30 | |
ML20246J626 | 18 August 1989 | Insp Rept 50-219/89-16 on 890702-29.Violations Noted.Major Areas Inspected:Plant Operational Events,Control of High Radiation Areas,Evaluation of Plant Operation W/High Canal Water Temps & Security Response to Vital Area Door Problem | Unanalyzed Condition High Radiation Area Ultimate heat sink Locked High Radiation Area Main transformer failure |
IR 05000219/1989019 | 15 August 1989 | Insp Rept 50-219/89-19 on 890802-04.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys & Transportation Programs,Including Mgt Controls,Audits,Qa & Implementation of Subj Programs | |
IR 05000219/1989015 | 9 August 1989 | Insp Rept 50-219/89-15 on 890627-30.No Violations Noted. Major Areas Inspected:Organization & Qualifications of Radiological Controls Personnel in Site Organization | Locked High Radiation Area |
IR 05000219/1989014 | 3 August 1989 | Insp Rept 50-219/89-14 on 890604-0701.No Violations Noted. Major Areas Inspected:Core Spray Booster Pump Trips,Under Voltage Relay Failure,Monthly Surveillance Observations, Emergency Svc Water Pump Operability & Oyster Creek Drawing | Fire Barrier Scram Discharge Volume Fuel cladding Unidentified leakage Siren |
IR 05000219/1989011 | 25 July 1989 | Insp Rept 50-219/89-11 on 890606-08.Major Areas Inspected: Emergency Preparedness Insp of full-participation Exercise of Licensee Emergency Plan Conducted on 890607.Exercise Did Not Meet Requirements for Annual Test of Emergency Plan | |
IR 05000219/1989012 | 21 July 1989 | Insp Rept 50-219/89-12 on 890430-0603.Violations Noted.Major Areas Inspected:Plant Operational Events Including Three Reactor Startups & Licensee Corrective Actions Re Reactor Coolant Pressure Boundary Hangers Being Pinned | Hydrostatic Temporary Modification Condition Adverse to Quality |