IR 05000219/1988005

From kanterella
Jump to navigation Jump to search
Insp Rept 50-219/88-05 on 880511-12.No Violations Noted. Major Areas Inspected:Emergency Exercise Conducted on 880511-12
ML20151A829
Person / Time
Site: Oyster Creek
Issue date: 06/30/1988
From: Amato C, Lazarus W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20151A826 List:
References
50-219-88-05, 50-219-88-5, NUDOCS 8807200134
Download: ML20151A829 (7)


Text

.

..

.

,

}

,

. 1

.

.- ,

V. S. NUCLEAR REGULATORY COMMISSION

REGION I

' Report N /88-05 Docket N License No. DPR-16 Priority ---

Category C Licensee: GPU Nuclear Corporation P. O. Box 388 Forked River, New Jersey' 08731-0388 Facility Name: Oyster Creek Nuclear Generating Station Inspection at: Forked River, New Jersey Inspection Conducted: Md1h2,194 ! f Inspectors: d _ eader 'Date R. J. Bailey, SG, RI R. K. Christopher, EPS, RI E. E. Collins, RI, Oyster Creek E. F. Fox, Jr. , Sr. EPS, RI C. Z. Gordon, EPS RI Approve g P kJo//f-e etion, FRSSB Inspection Summary: Inspection on May 11-12, 1988 (Report No. 50-219/88-05)

Areas Inspected: Routine, announced, emergency preparedness inspection of the licensee's Emergency Exercise conducted on May 11-12, 1988. The State of New Jersey, Ocean County and local governments' participated but were not observed by the V. S. Federal Emergency Management Agenc Results: No violation, dev 4tions or unresolved items were identifie Emergency response actions were adequate to provide protective measures for the health and safety of the public,

h![ $$0$k

_ _ _ - _ - _ - _ - - _ _

. - _ _ _ _

. . _

.

.

.

.

DETAILS 1.0 Persons Contacted

  • J. Barton, Deputy Director, Oyster' Creek
  • T. Blount, Lead Emergency Planner
  • J. Bontempo, Lead Emergency Planner
  • R. Ewart, Security Lieutenant
  • Fitzpatrick, Director, Oyster Creek
  • Giangi, Manager, GPU Corporate Emergency Planning
  • S. Kempf, Emergency Offsite Planner
  • J. Kowalski, Site Licensing Manager
  • D. MacFarlane, Manager Site Audits
  • S. Polan, Manager, Public Information
  • A. Rone, Director, Plant Engineering F. Sciarra, Security Officer
  • Stinztcum, Site Security Supervisor
  • J. Sullivan, Director, Plant Operations
  • S. Surgeoner, Manager, Public Relations
  • Slobodien, Director, Radiological Controls
  • K. Wolf, Manager, Radiological Engineering I

l * Denotes those present at the exit interview.

'

]

i

.

The inspectors also observed the actions of, and interviewed, other licensee I personne .0 Emergency Exercise The Oyster Creek Nuclear Generation Station announced, full participation, exercise was conducted on May 12, 1988, 5:00 p.m. to 10:30 pm. The State of New Jersey, Ocean County and 26 municipalities and 36 local government Agencies participated. The U. S. Federal Emergency Management Agency did a not observe the exercis .1 Pre-Exercise Activities The exercise objectives submitted to NRC Region I on January 12, 1988 were reviewed and, following revision, determined to be adequate to test the licensee's Emergency Plan. On March 29, 1988, the licensee submitted the complete scenario package for NRC review and evaluatio Region I representatives had telephone conversations with the licensee's emergency preparedness staff to discuss the scope and content of the scenario. As a result, minor revisions were made to the scenario which allowed adequate testing of'the major portions of the Oyster Creek Nucleati Generating Station Emergency Plan and Implementing Procedures and also provided the opportunity for licensee personnel to demonstrate thos areas previously identified by the NRC as in need of corrective actio .

m_.________ __.._ ______ __.__ . _ __

n -

=. .

.

'

.

NRC observers attended a licensee briefing on May 11, 1988. Suggested i NRC changes to the scenario made by the licensee were discussed i during the briefing. A licensee representative stated that certain 1 emergency resporsse activities would be simulated and that controllers would intercede in exercise activities to prevent scenario deviations or disruption of normal plant operation The exercise scenario included the following events:

-

Notification of possible terrorist action against unidentified reactors in New York, New Jersey, and Connecticu Vehicle accident within the Protected Area, fuel oil spill. and fire.

'

-

Compressed gas cylinders set free by the accident penetrate an Augmented Off-Gas Treatment Building wall producing a ground level, unmonitored release; localized site contamination occur Penetration of Protected and Vital Areas by two intruder Bomb detonation with resulting damag Electromagnetic relief valve stuck in the ooen positio Release of radioactive material to the reactor buildin Elevated, filtered release to the off-site environmen .2 Activities Observed During the conduct of the licensee's evcise, NRC team members made detailed observations of the activation and augmentation of the Emergency Response Organization (ERO), activation of Emergency Response Facilities (ERFs) and actions of emergency response personnel during the operation of the ERFs. The following activities were observe . Diagnosis of events and recognition of symptoms by reactor operator . Selection and use of the correct Administrative Procedures, Abnormal Operating Procedures, Emergency Operating Procedure Emergency Plan Impleaenting Procedures and Security Contingency Procedure . Fire fighting, Radiation Control support of the Fire Brigade, contamination and hazardous material spill contro o .

-

,

.

.,

... .--

.

.

-

i

! Protected and Vital Area intrusio . Simulated placement of two bombs one of which went of . Apprehension and questioning of the intruder . Location of ~ the' other bomb prior to detonation and its deacti-vation by a bomb ~ disposal tea ' Emergency Classification and timely notification to off-site authoritie . Assessment of accident condition . Dispatch of on-site and off site monitoring team . Dispatch.or~ teams from the Operations Support Center, including-

,two security teams, 1 Calculation of projected doses and dose commitment . Consideration of Protective Action.'

1 Preparation of press release .0 Exercise Observations 3.1 Exercise Strengths The NRC team noted that the licensee's activation and augmentation'of the Emergency Response Organization (ER0), Security-Organization, and Emergency Response ~ Facilities, and use of these facilities were generally consistent with their Emergency Plan, Emergency Plan Implementing Procedures and Security Contingency Pla The team also noted the following licensee actions that provided positive indications of their ability to cope with abnormal plant conditions and security events:

-

Prompt and correct response to events and symptoms by the Emergency Control Center staff;

-

Good command and control and internal communications;

-

Excellent response to the fire and recognition of the need to control a hazardous material spill, use of means to do so and notification of cognizant governmental authorities;

-

Environmental Assessment Control Center staff were very aggressive and coordinated activities well;

- _ _ .

. '.'

f,

'

.

. 5 *

Good Radiation Control of Operations Support Center (OSC) teams;

-

-

Excellent response by OSC teams tasked with repairing.the Augmented Off-Gas (A0G) Treatment facility;

-

Timely evacuation of the Reactor Building;'

-

Excellent communication with the bomb disposal team by the accompanying Security Officer;

.

-

Good interface between the Emergency Control Center (ECC) and local law enforcement agencies;

-

The Emergency Director corre'ctly applied barrier breach analysis and followed recovery procedures;

-

.The modified Implementing Procedure re-locating the Emergency Director from the Emergency Control: Center to the Technical Support Center was effective;

-

Good, overall, consistent Security Organization response ~to threats, intrusion, intruder and bomb search and accountab(lit .2 Exercise Weaknesses The NRC identified the following areas that need to'be evaluated by the licensee (the licensee conducted an adequate self critique of the exercise which also identified some of these areas). These items will be evaluated during a subsequent Emergency Preparedness inspectio Cordon control was not complete around the Augmented Off-Gas Treatment Building. Inadvertent-entry into the fire zone was possible. (50-219/88-05-01)

-

After the fire was extinguished, contamination control techniques were inadequate. Only one Health Physics Technician wa_s'available who did not survey all potentially contaminated individuals and equipment. A controller was not assigned to provide dat (50-219/83-05-02)

The Technical Support r,oordinator did not, apparently, at all

-

times' respond satisfactorily to the Emergency Support Director's questions as to the possible effects of varying torus water level. (50-219/88-05-03)

L_

-

. .

.

'

. 6

-

The Emergency Operations Facility (EOF) Security Support Coordinator was not involved in the Emergency Support Director's initial E0F manager's meeting. As a result, infonation as to the status of the security event, implementation of the Security Contingency Procedures and their interrelations with operational safety were not initially available. (Reference IE Infonnation Notice 83-27)(50-219/88-05-04)

-

Operations Support Center connand and control was not always clear and consistent as to who was in charge. (50-219/88-05-05)

-

-

Operations Support Center activity was based on declaration of a Site Area Emer ency one hour before it was declare (50-219/88-05-06

-

Radio consnunications capability and radio net control procedures used during security events should be reviewed. (50-219/88-05-07)

-

An apparent discrepancy between the Security Contingency Plan, Emergency Plan Implementing Procedures and the reporting requirements of 10 CFR 50.72 and 10 CFR 73.71 h have resulted in failure to update the NRC in a timely manner as to the progress of the security event. (50-219/88-05-08)

-

The licensee did not provide adequate initial assistance upon arrival of the bomb disposal team. (50-219/88-05-09)

-

There is an inconsistency between the wording of Section 3.5 of and Attachment I, Category S to Procedure 9473-IMP-1300.01, Rev. 4. Paragraph 3.5 does not include Security related events as the basis for declaration of a Site Area Emergency (SAE).

(50-219/88-05-10)

4.0 Licensee Action on Previously Identified Items Based upon discussions with licensee representatives, observations of the exercise and review of records, the following items, identified in Inspection Reports 50-219/86-07, 87-11 and 88-06, were not repeated or satisfactory corrective actions are in progress and the following are closed or continued as note (Closed) IFI (50-219/86-07-01). The Control Room was not advised there was radioactivity in the fire plum (Closed)IFI(50-219/86-07-04). Access control and frisking of personnel entering the Technical Support Center was not conducted in accordance with Procedure 6430-IMP-1300.2 _ _ - _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _

_ _ _ _ _ _ _ _ _ _

_-

. .

.

'

.

-

(Closed) IFI (50-219/86-07-05). Infonnation flow to ar,d from the Technical Support Center (TSC) was inadequat (Closed) Ici 50-219/86-07-06). The Parsippany Technical Functions Center (PTEC)(did not respond promptly to TSC request (Closed) IFI (50-219/87-11-01). The Emergency Director (ED) analyzed data, and failed to concentrate on priority corrective action (Closed) IFI (50-219/87-11-02). The Fire Brigade exhibited poor fire fighting technique (0 pen) IFI (50-219/87-11-05). Evacuation Time Estimates (ETEs) were not considered when declaring a General Emergency (GE) and developing a Protective Action Recomendation (PAR). This exercise did not escalate to a GE, therefore no PARS were necessary and it was not possible to observe use of ETE (0 pen) IFI (50-219/87-11-06 and 50-219/88-06-05). Excessive air sample volume appears to be collected by field teams. The licensee has reviewed this natter and will provide documentation describing results of their revie (Closed) IFI (50-219/87-11-07). A Radcon technician could not use a portable (laptop) computer and software to calculate projected dose (Closed) IFI (50-219/87-11-08). Containment high range monitor readings were not used to estimate core damag (0 pen) IFI (50-219/88-06-04). The licensee has reviewed conservatisms in the methodology for computing projected doses and dose comitment calculations and will submit a revised Oyster Creek Emergency Dose Manual (9300-ADM-4010).

5.0 Exit Meeting The inspectors met with the licensee personnel listed in Section 1 of this report at the conclusion of the inspection. The licensee was informed no violations, deviations or unresolved items were identified. The inspectors also discussed areas for improvemen The licensee acknowledged these findings and agreed to evaluate them, institute corrective actions as necessary and include needed corrections in the Corporate Emergency Plan, Oyster Creek Implementing Procedures, and the Oyster Creek Emergency Dose Manual. At no time during the course of the inspection did the inspectors give the licensee written materia _ _ _ _ _ _ __ _ _ __ - _ _ __ _ _ . _ -