IR 05000219/2013001

From kanterella
Jump to navigation Jump to search
ROP-14 2013 Oyster Creek Nuclear Generating Station Annual Assessment Letter, Report 05000219-13-001, and Inspection Plan
ML14062A036
Person / Time
Site: Oyster Creek
Issue date: 03/04/2014
From: Kevin Mangan
NRC/RGN-I/DRP/PB6
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
MANGAN, KA
References
IR-13-001
Download: ML14062A036 (5)


Text

UNITED STATES rch 4, 2014

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR OYSTER CREEK NUCLEAR GENERATING STATION (REPORT 05000219/2013001)

Dear Mr. Pacilio:

On February 12, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Oyster Creek Nuclear Generating Station. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2013, through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Oyster Creek Nuclear Generating Station operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that the performance at Oyster Creek Nuclear Generating Station during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, Green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year (CY) 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The CY 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an ISFSI at Operating Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610)337-5234 with any questions you have regarding this letter.

Sincerely,

/RA/

Kevin A. Mangan, Acting Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-219 License Nos.: DPR-16 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ

ML14062A036 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME mmt LCline/ LC KMangan/ KAM DATE 02/27/14 03/03/14

Page 1 of 2 Oyster Creek 02/28/2014 12:58:32 Inspection / Activity Plan Report 22 01/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 5/19EXAM - OYSTER CREEK INITIAL EXAM 3 1 04/21/2014 04/25/2014 U01893 FY14-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM 1 05/19/2014 05/23/2014 U01893 FY14-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM 71124.08 - RADWASTE 1 1 02/03/2014 02/07/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation TRI FI - TRIENNIAL FIRE PROTECTION 5 1 03/24/2014 03/28/2014 IP 7111105T Fire Protection [Triennial]

1 04/07/2014 04/11/2014 IP 7111105T Fire Protection [Triennial]

EP EX - EP EXERCISE INSPECTION 3 1 03/17/2014 03/21/2014 IP 7111401 Exercise Evaluation ISFSI - ISFSI OPERATION INSPECTION 2 1 04/07/2014 04/11/2014 IP 60855 Operation Of An ISFSI 1 04/07/2014 04/11/2014 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124 - HP INSPECTION RAD HAZARD ALARA PRE R25 1 1 08/11/2014 08/14/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/11/2014 08/14/2014 IP 71124.02 Occupational ALARA Planning and Controls 7111108G - INSERVICE INSPECTION 1 1 09/22/2014 09/26/2014 IP 7111108G Inservice Inspection Activities - BWR 71124 - HP INSPECTION IP 71124.01 .02 .03 04 R25 1 1 09/22/2014 09/26/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 09/22/2014 09/26/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 09/22/2014 09/26/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 09/22/2014 09/26/2014 IP 71124.04 Occupational Dose Assessment EP PROG - EP PROGRAM INSPECTION 1 1 09/22/2014 09/26/2014 IP 7111402 Alert and Notification System Testing 1 09/22/2014 09/26/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 09/22/2014 09/26/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71152B - PI&R BIENNIAL 4 1 11/03/2014 11/07/2014 IP 71152B Problem Identification and Resolution 1 11/17/2014 11/21/2014 IP 71152B Problem Identification and Resolution 71124 - 71124.05 RAD MONITORING INSTRUMENTATION 1 1 10/20/2014 10/24/2014 IP 71124.05 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Oyster Creek 02/28/2014 12:58:32 Inspection / Activity Plan Report 22 01/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71151 - 71151 PI VERIFY 71124.01.02.03.04 CLEANU 1 1 11/17/2014 11/21/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 11/17/2014 11/21/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 11/17/2014 11/21/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 11/17/2014 11/21/2014 IP 71124.04 Occupational Dose Assessment 1 11/17/2014 11/21/2014 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 11/17/2014 11/21/2014 IP 71151-PR01 RETS/ODCM Radiological Effluent 71124 - HP INSPECTION 71124.01 .02 POST R25 1 1 01/26/2015 01/30/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 01/26/2015 01/30/2015 IP 71124.02 Occupational ALARA Planning and Controls 7111107T - TRIENNIAL HEAT SINK 1 1 03/09/2015 03/13/2015 IP 7111107T Heat Sink Performance MODS - PERMANENT PLANT MODIFICATIONS 3 1 04/06/2015 04/10/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1 04/20/2015 04/24/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 71124 - RADIOACTIVE EFFLUENT CONTROL RETS 1 1 05/25/2015 05/28/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111111B - OC REQUAL INSP W/P/F RESULTS 2 1 06/08/2015 06/12/2015 IP 7111111B Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.