ROP-14 2013 Oyster Creek Nuclear Generating Station Annual Assessment Letter, Report 05000219-13-001, and Inspection Plan
ML14062A036
Person / Time
Site: Oyster Creek
Issue date: 03/04/2014
From: Kevin Mangan
NRC/RGN-I/DRP/PB6
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
MANGAN, KA
References
IR-13-001
Download: ML14062A036 (5)


Text

March 4, 2014

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR OYSTER CREEK NUCLEAR

GENERATING STATION (REPORT 05000219/2013001)

Dear Mr. Pacilio:

On February 12, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Oyster Creek Nuclear Generating Station. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2013, through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Oyster Creek Nuclear Generating Station operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that the performance at Oyster Creek Nuclear Generating Station during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, Green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year (CY) 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The CY 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an ISFSI at Operating Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes

to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610)337-5234 with any questions you have regarding this letter.

Sincerely,

/RA/

Kevin A. Mangan, Acting Chief Projects Branch 6 Division of Reactor Projects

Docket Nos.: 50-219 License Nos.: DPR-16

Enclosure: Inspection Plan

cc w/encl: Distribution via ListServ

ML14062A036 SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available

OFFICE RI/DRP RI/DRP

NAME mmt LCline/ LC KMangan/ KAM

DATE 02/27/14 03/03/14

Page 1 of 2 02/28/2014 12:58:32 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oyster Creek Inspection / Activity Plan 01/01/2014 - 06/30/2015 5/19EXAM

- OYSTER CREEK INITIAL EXAM

1 FY14-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM U01893 04/21/2014 04/25/2014

FY14-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM U01893 05/19/2014 05/23/2014 71124.08

- RADWASTE

1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 02/03/2014 02/07/2014 TRI FI

- TRIENNIAL FIRE PROTECTION

1 IP Fire Protection [Triennial]

7111105T 03/24/2014 03/28/2014

IP Fire Protection [Triennial]

7111105T 04/07/2014 04/11/2014 EP EX

- EP EXERCISE INSPECTION

1 IP Exercise Evaluation 7111401 03/17/2014 03/21/2014 ISFSI

- ISFSI OPERATION INSPECTION

1 IP Operation Of An ISFSI 60855 04/07/2014 04/11/2014

IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 04/07/2014 04/11/2014 71124

- HP INSPECTION RAD HAZARD ALARA PRE R25

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/11/2014 08/14/2014

IP Occupational ALARA Planning and Controls 71124.02 08/11/2014 08/14/2014 7111108G

- INSERVICE INSPECTION

1 IP Inservice Inspection Activities - BWR 7111108G 09/22/2014 09/26/2014 71124

- HP INSPECTION IP 71124.01.02.03 04 R25

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/22/2014 09/26/2014

IP Occupational ALARA Planning and Controls 71124.02 09/22/2014 09/26/2014

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/22/2014 09/26/2014

IP Occupational Dose Assessment 71124.04 09/22/2014 09/26/2014 EP PROG

- EP PROGRAM INSPECTION

1 IP Alert and Notification System Testing 7111402 09/22/2014 09/26/2014

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/22/2014 09/26/2014

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/22/2014 09/26/2014 71152B

- PI&R BIENNIAL

1 IP Problem Identification and Resolution 71152B 11/03/2014 11/07/2014

IP Problem Identification and Resolution 71152B 11/17/2014 11/21/2014 71124

- 71124.05 RAD MONITORING INSTRUMENTATION

1 IP Radiation Monitoring Instrumentation 71124.05 10/20/2014 10/24/2014 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 02/28/2014 12:58:32 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oyster Creek Inspection / Activity Plan 01/01/2014 - 06/30/2015 71151

- 71151 PI VERIFY 71124.01.02.03.04 CLEANU

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/17/2014 11/21/2014

IP Occupational ALARA Planning and Controls 71124.02 11/17/2014 11/21/2014

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/17/2014 11/21/2014

IP Occupational Dose Assessment 71124.04 11/17/2014 11/21/2014

IP Occupational Exposure Control Effectiveness 71151-OR01 11/17/2014 11/21/2014

IP RETS/ODCM Radiological Effluent 71151-PR01 11/17/2014 11/21/2014 71124

- HP INSPECTION 71124.01.02 POST R25

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/26/2015 01/30/2015

IP Occupational ALARA Planning and Controls 71124.02 01/26/2015 01/30/2015 7111107T

- TRIENNIAL HEAT SINK

1 IP Heat Sink Performance 7111107T 03/09/2015 03/13/2015 MODS

- PERMANENT PLANT MODIFICATIONS

1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 04/06/2015 04/10/2015

IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 04/20/2015 04/24/2015 71124

- RADIOACTIVE EFFLUENT CONTROL RETS

1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/25/2015 05/28/2015 7111111B

- OC REQUAL INSP W/P/F RESULTS

1 IP Licensed Operator Requalification Program 7111111B 06/08/2015 06/12/2015 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.