SUBJECT:
ANNUALASSESSMENT LETTER FOR OYSTER CREEKGENERATING STATION (REPORT 0500021 9/201 0001 )
Dear Mr. Pacilio:
On February 11,2011, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Oyster Creek. The NRC reviewed the most recent quarterly performance indicators (pls) in addition to inspection results and enforcement actions from January 1,2010 through'December 31, 2010. This letter informs you of the NRC's assessment of youi facility duringl this period and its plans for future inspections at your facility. This p"riorranre ieview -and enclosed inspection plan do not include security information' A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, Oyster Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Oyster Creek during the most recent quarterwas within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the nominat, 6xpected,ahgJ (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2012. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections iisted during ine tast nine months of the inspection plan are tentative and may be revjsed at the mid-cycljperformance review. The NRC provides the inspection plan to allow fo-r the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as roon as poslibte to discuss changes to the inspection plan should circumstances warrant any changes.
ln accordance with 1O CFR 2.3g0 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the publicly Available Reiords (pnnS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5200 with any questions you have regarding this letter.
Sincerely, Ronald R. Bellamy, Ph.D., Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos: 50-219 License Nos: DPR-16 cc w/encl: Distribution via ListServ Oyster Creek Inspection/Activity Plan is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5200 with any questions you have regarding this letter.
Sincerely,
/RA/
Ronald R. Bellamy, Ph.D., Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos: 50-219 License Nos: DPR-16 cc Mencl: Distribution via ListServ Oyster Creek Inspection/Activity Plan Distribution dencl:
W. Dean, RA D. Lew, DRA D. Roberts. DRP J. Clifford, DRP P. Wilson, DRS R. Bellamy, DRP G. Barber, DRP C. Newport, DRP N. Lafferty, DRP J. Trapp, RIOEDO DRS Branch Chiefs (6)
N. McNamara, Rl, SLO D. Tifft, Rr, slo D. Screnci, Rl, PAO N. Sheehan, Rl, PAO R. Barkley, Rl, ORA J. Kulp, DRP, SRI J. Ambrosini, DRP, Rl J. DeVries, DRP, OA RidsN rrPMOysterCreek Resource RidsNrrDorlLpll -2 Resource RidsNrrDirslpab ROPreports Resources ROPassessment Resource DOCUMENT NAME: S:\\ROP-11 EOC Review\\Branch 6\\Oyster Creek\\OC ROP-11 EOC Cover Ltr.Docx SUNSI Review Complete: RRB (Reviewer's lnitials)
MLl10620196 After declaring this document "An Official Agency Record" it g!!! be released to the Public.
lndicato ln tho box: "C" =
"E" wilh
=No OFFICE mmt RI/DRP RI/DRP RI/DRP NAME JKulp/JK SBarber/SB RBellamv/RB DATE 02t23t11 02t24111 02t28t11 OFFICIAL RECORD COPY
Page 1 of2 O2/2U2011 08:45:02 Report 22 Oyster Creek Inspection / Activity Plan 01t0112011 - 0613012012 No. of Staff on Site Unit Number 03t1412011 03t2812011 03t21t2011 03t21t2011 o3t21t2011 o3t21t2011 03t21t2011 o3t21t2011 oa2lnor o5t23t2011 06t13t2011 07t1'U2011 07t11t2011 07t11t2011 07t1112011 07t11t2011 ogt12t2011 0912612011 09t26t2011 o9t26t2011 o9t26t2011 09t26t2011 10t17t2011 10t17t2011 10t17t2011 1011712011 10117t2011 0311812011 o4lo1l2o11 031251201',!
03t25t2011 0312512011 0312512011 03125120'11 0312512011 0312512011 0512712011 0611712011 0712012011 07t15t2011 07t15t2011 071151201'l 0711512011 09/16/201 1 09/30/201 1 09t30t2011 09t30t2011 0913012011 0913012011 1012112011 10t21t2011 10t21t2011 1012112011 10t21t2011 lP 71111057 lP 71111057 u01831 u01831 tP 60855.1 tP 71124.05 tP 71124.06 TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION Fire Protection [riennial]
Fire Protection Iriennial]
HP-71124 - ACCESS/ALARA/AIR/DOSE/INSTRUMENTS/WASTE tP 2515t179 tP 71124.01 lP 71124.02 tP 71124.03 lP 71124.04 lP 71124.05 tP 71124.08 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls In-Plant Airborne Radioactivity Control and Mitigation Occupational Dose Assessm ent Radiation Monitoring I nstrum entation Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 7111118 - OC REOUAL INSP w/ P/F RESULTS tP 71111118 Licensed Operator Requalifi cation Program O7l11EXM - OPERATOR LICENSING INITIAL EXAMS FY1 1-OYSTER CREEK, INITIAL OL EXAM FY1 1-OYSTER CREEK, INITIAL OL EXAM HP.71124. INSTRUMENTS/REMP/ISFSI Operation of an Independent Spent Fuel Storage Installation at Operating Plants Radiation Monitoring lnstrumentation Radioactive Gaseous and Liquid Effluent Treatment lP 71124.07 Radiological Environmental Monitoring Program TI-177
- MANAGING GAS ACCUMULATION IN ECCS tP 2515t177 EP EX tP 7111401 lP 7111404 tP 71 151-EP01 tP 71151-EPO2 tP 71151-EP03 tP 71124.01 tP 71124.02 lP 71124.03 tP 7'1124.04 tP 71124.05 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System
- EP EXERCISE EVALUATION Exercise Evaluation Emergency Action Level and Emergency Plan Changes Drill/Exercise Performance ERO Drill Participation Alert & Notification System HP-71124 - ACCESS/ALARA/AIR/DOSE/INSTRUMENTS/PI Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls ln-Plant Airborne Radioactivity Control and Mitigation Occupational Dose Assessment Radiation Monitoring I nstrumentation lr nrs repon lThis report L-a-o,n=r:-,
does not include INPO and OUTAGE activities.
shows only on-site and announced inspection procedures.
=..---"*-._*:Jt'
Page 2 ol 2 02t28t2011 Report 22 08:45:02 Oyster Creek Inspection / Activity Plan 0110112011 - 0613012012 Unit Number No. of Staff on Site
1 I
10t17t2011 10t17t2011 1011712011 04t16t2012 05t14t2012 0112312012 02t06t20't2 0311212012 03t12t2012 03t12t2012 03t12t2012 10t2'U2011 1012112011 1012112011 04t20t2012 05t18t2012 0112712012 o?t10t2012 03t16t2012 03t16t2012 03t16t2012 03t16t2012 tP 25151175 tP 71124.01 lP 71124.02 lP 71124.04 HP.7 1 124 - ACCESS/ALARA/AIR/DOSE/INSTRUMENTS/PI lP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation lP 71151-OR01 OccupationalExposureControlEffectiveness IP71151-PR01 RETS/ODCMRadiologicalEffluent 5/14EXAM. OYSTER CREEK INITIAL EXAM U01848 FY12-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM U01848 FY12-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM 7111117 - PERMANENT PLANT MODS lP 71111171 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications lP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications INSP
- ACCESS/ALARA/AIRBORNE/DOSE ASSESS Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls Occuoational Dose Assessment
1
.l fhis reDort does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.