Forwards Insp Rept 50-289/87-17 on 870904-1002.No Violations Noted.Util Encouraged to Continue Efforts in Reducing balance-of-plant Trips That Originate in Secondary Plant Due to 870916 Reactor Trip
ML20236E077
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 10/22/1987
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20236E080 List:
References
NUDOCS 8710290056
Download: ML20236E077 (2)


See also: IR 05000289/1987017

Text

-_

m

-,

g j

,_

USNRC-DS I

OCT 221987 nn oct 28 A D 01 l

Docket No. 50-289

GPU Nuclear Corporation

ATTN: Mr. H. D. Hukill

Vice President and Director, TMI-1

P. O. Box 480

Middletown, Pennsylvania 17057

Gentlemen:

Subject: Inspection Report No. 50-289/87-17

During the period from September 4, to October 2, 1987, members of NRC Region I

staff conducted routine safety inspections at your facility. We documented the

results of that inspection in the enclosed report. At the conclusion of the

inspection period, Mr. D. Johnson of my staff summarized the inspection

findings with you and other members of your staff. l

With respect to the reactor trip of September 16, 1987, you are encouraged to

continue your efforts in reducing balance of plant trips that originate in the

secondary plant. As we previously discussed, the NRC staff regards these trips

as challenges to reactor safety systems, and your efforts expended on increas-

ing the reliability of the balance of plant trip system are worthy of

additional attention.

This letter also, acknowledges the receipt of licensee internal correspondence

provided to our Office of Nuclear Reactor Regulation (NRR) on July 21, 1987,

which included an explanation of the circumstances surrounding the early

criticality experienced during the startup of June 24, 1987.

No response to this letter is required. Thank you for your cooperation in

these matters, j

Sincerely,

$U g O al ,&)>u d Y9

Lee L. Bettenhausen, Chief

Reactor Projects Branch No. 1

Enclosure: NRC Region I Inspection Report No. 50-289/c! 17

,

8710290056 87.1022

PDR ADOCK 05000289 l

G PDR 7()

i

l l

l

_______________________J

..

.

2

cc w/ enc 1:

T. G. Broughton, Operations and Maintenance Director, TMI-1

C. W. Smyth, TMI-1 Licensing Manager

'R J. McGoey, Manager, PWR Licensing

E. L. Blake, Jr.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

'

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

Region 1 Docket Room (with concurrences)

l J. Goldberg, OELD:HQ

Management Assistant, DRMA (w/o encl)

L. Bettenhausen, DRP Branch Chief

C. Cowgill, DRP Section Chief

W. Travers, NRR

G. Edison, PM, NRR

K. Abraham, RI

R. Conte, RI

D. Johnson, RI

R. Summers, RI

R [ RI:DRPTf

DJohnson/cph RConte CCowgill LBettenhausen