Forwards Summary of 890512 Meeting Re Issues Raised During Vendor Interface & Procurement Team Insp.Topics Discussed Included,Corrective Actions Re Suitability of safety-related Components Installed at Plant
ML20246K603
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/13/1989
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20246K608 List:
References
NUDOCS 8907180216
Download: ML20246K603 (2)


Text

= -- -

.3 j

I.M l July 13, 1989.

a_

M Florida Power Corporation ,

L -Mr. W. S. Wilgus . .

1

- Vice President, Nuclear Operations

. ATTN: 1M anager, Nuclear Operations Licensing

P. O. Box.219-NA-2I
y Crystal River, FL' 32629 1

Gentlemen:

o- j

SUBJECT:

MEETING 0N ISSUES RAISED DURING THE VENDOR INTERFACE AND- -l PROCUREMENT TEAM INSPECTION

. This letter refers to the meeting held at our request on May 12, 1989. This

~ meeting' concerned activities authorized for your Crystal River 3 Facility.

The topics discussed at this meeting included technical evaluations performed and interim and proposed corrective actions'taken by your staff in response to operability concerns raised oy the inspection team involving procurement and vendor interface. and the suitability of certain safety-related components for their application which were procured and installed in the plant. A summary, and a. list of: attendees are enclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2 Title 10,' Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public. Document Room.

.Should you have any questions concerning this letter please contact us.

Sincerely.,

(ORIGINAL SIGNED BY E. W. MERhiuti IDR) -

Albert F. Gibson,- Director Division of Reactor Safety

Enclosures:

1.. Meeting Summary

2. Meeting Attendees
3. . Florida Fower Corp. Handouts w/ attachments cc w/encls: .

' P. F. McKee, Director. . Nuclear Plant Operations R. C. Widell, Director, Nuclear Site Support 4 State of Florida bec w/encls: (Seepage 2) 8907180216'090713 PDR ADOCK 05000302 ,

G. [G W

'I< .

Florida Power Corporation 2 July 13, 1989 bec w/cncis:  !

W. Brock, Branch Chief Vendor Inspection Branch, NRR NRC Resident Inspector p cument Control Desk The contents of this memo were discussed with R. Pettis (Team Leader) VIB, NRR on July 6, 1989, to enhance NRR-RII communications and to obtain their agreement prior to transmittal to the licensee.

<g[J 25 6 & ,/ ales Robert W. Wri t - July 11, 1989 RII RII RI RII RII RII god 6e 'Rwd e v?  ; DJ#

i RWright:obw FJape TAfe[eales Affi ' on MSin le L 89 0

06/2./89 0 / c/89 06/g(/89 y/j/89 06/} 89 l