ENCLOSURE 1

.

MEETING SUMMARY

'

Licensee:

Florida Power Corporation

Docket No.

50-302

License No.

DPR-72

l

Facility Name: Crystal River 3

'

'

7h/k f

' Approved by:

F. Jape, SectionPChibf

Date

,

L

1

SUMMARY

' A. meeting was held 'in the Region II office on May 12, 1989. Mr. S. Ebneter

opened the meeting by expressing the NRC's concern over the operational

reliability of several components and items procured and installed in the

plant and the various vendor interface weaknesses identified during

inspection 50-302/89-200.

The licensee presented evaluations and operability verifications

(excluding seismic considerations) for eight of the approximately

forty-one procurement deficiencies identified during ' the inspection.

These eight. sample items selected by the NRC team at the conclusion of

the inspection were believed to be representative of the licensee's'.

failure to perform adequate dedication for commercial grade items used. in

safety-related applications.

FPC senior management and technical

personnel also discussed their proposed corrective actions and enhancements

intended for improving the procurement and vendor interface programs as

described in the attached handouts.

This meeting was beneficial to both the licensee and the NRC.

The

licensee demonstrated operability for the eight sample items through a

thorouch review of their records, and taking credit for post-installation

and other periodic or maintenance testing of the installed component. As

a result, the NRC staff did not delay the re-start _of CR3. The licensee

was asked and agreed to perform a " backward look";

i.e., to perform

examined by the NRC) preventative sample of additional components (not

reverification of a re that have been dedicated to safety related

applications over. the past five years.

This commitment is contained in

FPC's letter to the NRC dated May 31, 1989, which also transmitted the

licensee's evaluations and operability reviews for the remaining

thirty-three ' inspector identified procurement problems.

A subsequent telephone conversation conducted July 5,1989, with CR3

management disclosed that they determined no items or components identified

for inadequate dedication were questionable, and consequently the licensee

has not, nor does it anticipate any replacement of these items. Likewise,

FPC has not begun the " backward look" orogram as yet.

Completion of this

activity is scheduled for the end of 1989.

8907210226 890713

PDR

ADOCK 05000302

l

G

PDR

9

- -

_ _ _ _ _ _ _ - -

_

. - - _ - - -

. _ .

,

.

'

EhcLOSURE 2

,

MEETING ATTENDEES

Florida Power Corporation

W. Wilgus, Vice President, Nuclear Operations

R. Widell, Director, Nuclear Operations Site Support

K. Baker, Manager, Nuclear Engineering Assurance

K. Lancaster, Manager, Site Nuclear Quality Assurance

G. Oberndorfer, Manager, Procurement and Material Quality Assurance

L. Tiscione, Manager, Nuclear Procurement Engineering Services

R. Watts, Manager, Purchasing and Contracting

K. Wilson, Manager, Nuclear Licensing

Nuclear Regulatory Commission

S. Ebneter, Regional Administrator

C. Hehl, Deputy Director, Division of Reactor Projects' (DRP)

R. Crlenjak, Chief, Reactor Projects Section 2B, DRP

H. Berkow, Director, Project Directorate II-2, Nuclear

Reactor Regulation (NRR)

W. Brock, Branch Chief, Vendor Inspection Branch, NRR

R. Pettis, Team Leader, Vendor Inspection Branch, NRR

E. Merschoff, Deputy Director, Division of Reactor Safety (DRS)

F. Jape, Chief, Quality Performance Section, DRS

R. Wright, Reactor Inspector Quality Program Section DRS

l

l

l

I

l

L

_

-

-

- - - _ _ _ _ _ _ _ _ - - _ _ _ _ _

-

_

_

w.,

..

,

,

ENCLOSURE 3

FLORIDA POWER CORPORATION HAND 0UTS

3A. Technical Evlauations of Items Nos. 1, 2, 3, 4, 6, 22, 29, and 40

3D. Vendor Interface

3C. Procurement Program Review

- - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ - _ _ -

__

_ _ _ - _ _ _ _ .

_ _ _ _

..

.

ATIACINENT 3A

~,. ~o

.

.

ITro4 1

LINK BAR AND ADAL'rJtSLt PLATE

.

CREPAIR

NO MATERIAL)

-

WHERE INSTALLED /OOMPONENT I .D

/SUBCOMIX)NENT UST

.

RC PUMP

RCH-622

SUPIN)RT SUBOOMIN)NEN"

,

HOW PUPOHASED

-

VENDOR /OEM

.

F9041437D

NOCrRAR

( COMMlUiCI AL GRADE

INSTALLATION

S A F .I C 1 ' Y RELATED)

SERVICE

S AFli"I'Y

FUNC"I'T ON

C'R T T T CA T . CHAR.

IPOR S A F ri"'1*

.

siutC2LON

PASSIVE-MAINTAIN

(FOR THIS SERVICE)

,

STRUCT.

INTEGRITY

THIREAD DIMENSIONS

.

OF THE RC PIPE / PUMP

THREAD ENGAGEMENT

.

VERIFICATION OF CRITICAL CHARAurtstdSTICS

.

THREAD DIMENSIONS AT REus.LL'r INSPECTION

.

( P T."I W GAUGE)

POST INSTAR.r ATIONS INSPEC.

CONFIRt4Tcn THREAD

.

ENGAGEMENT PER LINK BAR DHG.

I

_ _ - _ _ _ _ - - _ _ _

,

_ _ _ _ _ _ _ _ _ _ _ _

1

l

ITrcM 12

l

>

s.

,

l

.

1

-

STRUCTURAL Sricacr - NOTS

( ~7/8 " -9 )

.

i

!

WHERE INSTAT J Jam /COMPONEb7f I.D./SUBOOMPONENT US3

.

l

INTENDED FOR RCP

RCP

STRUCT.

BOLTINt

STRUCT BOLTING

(NON-FETPFG RET

HOW PURCHASED

-

VENDOR /OEM

.

F9043960C

BOLT INDUSTRIES

(COMMERCIAL GRADE

.

SAvrrY RTCT JLTED)

SAlfrrY FUNCTION

CRITICAL CHAR.

FOR SAvrr2

.

FUNCTION

MAINTAIN STRUCTURAL

.

DIMENSIONS

INTEGRITY

(MECH.

JOINTS)

.

MATERIAL STRENGTI

( 11A RDNiCBS )

HOW CRITICAL CHAR.

VERIFIED

.

RECEIPT INSFEC.-THREAD DIMENSIONS & HARDNESS

.

CRACKS IDENTIFIED PRIOR TO INSTALLATION

.

(CRACKS BhCAME VISIBLE AU"lM SM4DBLASTING

FOR PAINTING)

FC7risNTIAL NON-CONFORMING ITEMS RKruuNED

.

NM INSTATT m

ADDITIONAL TESTING CONFI9Mr4m ITEMS WERE

.

ACUist'rAr4T Jc l'Isu CRITIEMIA OF A-563 GR C

__-

_ _ _ _ _ _ _ _ _ - _ -

.

.

.,

u-

,

ITFM 3

.

Tcr RCTRONIC TRIP MODULE

.

WHERE INSTAT.r.rcn/ COMPONENT I.D./SUBOOMPONENT USI

..

EFIC ROOM A

EF-100-LS2

E24ER .

Irn*:ta MATEl

(MILD ENVIR.)

INITIATION TRIl

MODULE

HOW ruMCHASED

-

VENDOR /OEM

.

F902443*7K

VITRO CORP.

/ B & W

SAlfrrY FUNCTION

CRITICAL CHAR.

FOR SAlfwrY

.

FUNCTION

ENERGIZE INITIATION

INPUT / OUTPUT VOLTAGE

RFhYS

HCM CRITICAL CHAR.

VERIFIED

.

.

CEL'<f .

RECEIVED

TRACEABILITY TO ORIG

P.O.

RECEIPT INSPEC.

VERIFIED MEG.

MARKINGS,

.

PHYSICAL CONDITION

POST INSTALL.

TESTING VERIFIED

.

INPUTS /Otrrrtr1E ,

AND LOGIC

NCrrE :

VITRO ONLY HAS A NOCr.F3kR QA PROGRAM -

REGARDr.r*m OF HOW ITEMS ARE ORDERRn

,

,

THEY ARE Sut'2' LIED UNDER THEIR NOCr.F3kR

1

l

QA PROGRAM - ITEMS WERE EVALUATED AS

NOCr.F3kR GRADE,

P.O.

INCORRECTLY PLACED

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _

r:

--

- - - - - - - - - - - - - - - - -

-

,

ITli'M 4

.,

.,

ErRCTRONIC TRIP MODULE

.

,

WImte INSTAR.r.m/ COMPONENT I.D./SUBOOMPONENT USE

..

EFIC ROOM

EF-100ZS

EMER.

Jtno ;s >vfATER

(MILD ENVIR.)

EF-2OO-ZS INITIATION TRIP MODULE

HOW ru1C3ASED

-

VENDOR /OEM

.

F90SSO78K

VITRO CORP.

/ B& W

(COMMERCIAL GRADE

SAFETY RELATED)

SAFETY FUNCTION

CRITICAL CHAR.

FOR SAJtrJtr.L7

.

FUNCTION

SEAL IN EUW INITIATE

ACTUATE FOR EDW >

10'%

SIGNAL TO EEW FLOW

(OR)

VECTOR E M 3LE

CONTROL VALVES

SIGNAL

( IEIC )

HOW CRITICAL CHAR.

VERIFIED

.

vtuff- RECEIVED--TRACEABILITY TO ORIG.

P.O.

.

RECEIPT INSPEC.

VERIFIED MEU.

MARKINGS,

.

DTMRNSIONS FOR CONFIGURATION

POST I N S T A L f_dkT I O N TESTING FULLY TESTED MODULE

.

OUTivrS & LOGIC

NCrl'E -

VITRO ONLY HAS A NOCr RAR QA PROGRAM -

REGARDLESS OF HOW ITEMS ARE ORDERED

THEY ARE Suret.IED UNDER THEIR NOCLEAR

QA PROGRAM - ITEMS WERE EVALUATED AS

k

NOCrRAR GRADE,

P.O.

INOORRJtsLrrL.Y PLACEC

I

- _ _ _ - _ _ _ . _ _ - _ _ _ _ _ _ _ _ _ - - _ - _ _ _ _ _ - .

__ _

. - _ .

I Tic 4_ G

,

.o

BEARING SHELt. ASSIniBLY

.

WHERE INSTALT.irn/ COMPONENT I.D./SUBOOMPONENT US)

.

DIESEL ROOM

ID3DG--1B

ALUMINUM MAIN

BEARING SFrTrr.r.

ASSIDiBLY

HOW PURCHASED

-

VENDOR /OEM

.

F9032244K

COLT IND.

CCOMMFRCIAL GRBZ)E

SAFTrYY R F "1 J L T E D )

SAFETY FUNCTION

CRITICAL CHAR.

FOR SAww.L'3

.

FUNCTION

MAINTAIN STRUCTURAL

-

DIMENSIONS

INTEGRITY;

PROVIDE

.

VISUAL INSPEC TO D E T E C "]

SUPPORT

NICKS,

SCRATCHES,

IrfC .

HOW CRITICAL CHAR.

VERIFIED

.

1

l

Umtfr .

RECEIVED FROM OEM

.

l

'

RECE1Pr INSFEC.

VERIFIED DIM.

CONFIGURATION

.

AND NO DEFECTS

POST INSTALLATION TESTING VERIFIED LMOPER

.

!

'

FIT-UP,

CLEARANCES,

ETC.

ADDITIONAL PERIODIC TESTING VERIFIES NORMAL

.

OIL PRTN URE AND TEMt'Et<ATURE

ADDITIONAL DIMENSIONAL INSPEC.

PERFORMTcn ON

-

STORES INVEtTTORY .

1

!

l

l

l

l

l

<

__.

. _ _ _ _ _ _ _ _ _ _ _ - .

..

'

., ,

ITind 22

.

,

)

RTcrJLY

(AGASTAT 7012)

.

WIttu(E INSTAR.r.m/OOrdPONENT I.D./SUBCOMPONENT USh

.

CRD AC BKR CUB

CRD AC BKR

K6 BRT.AY

HOW PURCHASED

-

VENDOR /OEM

.

MQF 1413-88

AMERACE / B & W

(NON SAFwrf BRrATED)

SAFETY FUNCTION

CRITICAL CHAR.

FOR SArrn

.

FUNCTION

NO ELEC SAb'Lcrf FUNC

P/N 7012

.

SEISMIC INTEGRITY ONLY

CONFIGURATION

(DIM)

.

HOW CRITICAL CHAR.

VERIFIED

.

EQU3CVAr 1U9CY EVALUATION t'steORMRn TO ORIGINAL

.

DESIGN DOC.

RECEIPT INSPEC VERIFIED MM.

MARKINGS AND

.

CONFIGURATION TO CATALOG,

OOIL RATING,

TIME

RANGE,

CONTACT l'ntt MARKINGS

POST I N S T A L T_dLT I O N TEST PERFORMRn FOR

!

.

FUNCTIONAL VERIFICATION

i

. .

.

1T104 2a

. .,. - . . - ,

.

MECHANICAL GOVERNOR

.

WEinst<E INSTAR.r.Rn/OCRdPONENT I.D./SUBOOMEONENT USD

-

EJtfrM-1

I!TP-2

INGV-1

4

HOW Emt< CHASED

VENDOR /OEM

.

-

F9028919K

HOODNARD/I-R ET:fMP

(COMMrcRCIAL GRADE

rist<RY (TURBINE)

SAirErY RELATED)

WOODNARD

(GOVLURNOR)

SAirrrY FUNCTION

CRITICAL CHAR-

FOR SAlfrrY

.

FUNC"rION

CONTROL

ruin 3INE SPl*:Ki)

.

ACCELERATION RAMP

-

SMOCTIH - ACCELERATION

St'Istnu CONTROL

-

.

CONTROL ON STAITP-UP

CONFIGURATION

.

HOW CRIT.

CHAR.

VERIFIED

.

RECEIPT INSPEC.

VERIFIED P/N,

MODEL * * ,

RAMP,

.

w x xx2 CONTROL-

MEU.

TEST TO VERIFY COMPLIANCE TO SPEC.

.

MFG.

utstcr .

TO ORIG.

CONFIGURATION

.

l

OEM CORRESPONDENCE-NO OEM MOD.

TO MFG.

EQUIP.:

.

i

l

l

l

_ _ _ _

..

.

.

.c

ITT<M 40

,

.

.

70A CIRCUIT BREAKER

CITE)

.

WHERE INSTAR.r.m/OOMEONENT I.D./SUBCOMPONENT US]

.

V e<< n'-5/27

DIST PANEL C

R.

PLANT SECURI7"

MILD ENVIR.

DIST.

BREAKEI

HOW FURCHASED

VENDOR /OEM

.

-

MQF 1084-86

NON SAirirrY/ITE

CNON SAFETY RELATED)

INVENTORY

SALCirrY FUNCTION

CRITICAL CHAR.

FOR SAirm.n

.

FUNCTION

MAINTAIN CIRCUIT

CONTINUITY

.

.

I h r12A5 R I T Y

CURRENT RATING

.

CIIANGE STATE FOR

OPERABILITY

.

.

OVERCURRENT

P/N

.

HOW CRITICAL CHAR.

VERIFIED

.

REuls.LL'r INSPEC.

VERIFIED P/N,

MEG.

MARKINGS

I

.

OF CURRENT RATING AND CONTINUITY

POST INSTALLATION VERIFIED CONTINUITY,

.

Ihr12AsttITY

INSTAR.r.rm IN ACCORDANCE WITH AN AFFROVED

.

DESIGN MODIFICATION

NOTE:

FUSE FRCrrisx.;rION IN SERIES,

WITH CIRCUIT

BREAKER

l

,

--

-

--

- - - - - - - - -

--

""""

3 :.

'

0

'

'

VEND 0R INTERFACE

!

(

FPC HAD IN PLACE SEVERAL PROCESS

'

ENHANCEMENTS TO ADDRESS TIMELINESS AND

DEPTH 0F REVIEW,

CORRECTIVE ACTION

TRACKING,

AND FOCUSSED ACCOUNTABILITIES

TEAM IDENTIFIED CONCERNS

Oo

TEAM IDENTIFIED WEAKNESS IN INPUT

PROCESS

(DISTRIBUTED RESPONSIBILITY

THROUGHOUT FPC)

o

TEAM PROVIDED FPC FEEDBACK ON GL 83-28

(SALEM /ATWS)

NOT TRANSMITTED TO FPC

EARLIER

o

TEAM IDENTIFIED SOME P0TENTIALLY

' MISSING'

VEND 0R INFORMATION

O

__

'

.

-

i

7.,

O

FPC ACTIONS

o

FPC ESTABLISHED FORMAL AGREEMENTS WITH

C0LT,

BROWN-BAVARI AND B&W

o

FPC ESTABLISHING POINTS OF CONTACT AND

LIST OF VENDOR INFORMATION FROM ALL

SAFETY RELATED SUPPLIERS

o

FPC WILL MODIFY PROGRAM TO ASSURE MUCH

GREATER ACCOUNTABILITY FOR RECEIPT,

()

INITIAL REVIEW AND ASSIGNMENT OF VENDOR

INFORMATION FOLLOW-UP

i

l

.

_ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ . _

- - - -

_ - - - - -

--

.:..

o

l

I

o

FPC BELIEVES DEPTH AND TIMELINESS

IMPROVEMENTS EVIDENCED BY:

1

,

ROSEMOUNT TRANSMITTERS PRIOR TO

-

RECEIPT OF IEIN WHICH ALERTED THE

INDUSTRY TO THIS POTENTIAL CONCERN

K LINE BREAKER REPORTING,

JC0,

-

AGGRESSIVE TESTING SCHEDULE

O

-_

-

- - .

.

..

ATTACHMENT 3C

'

-

i

,

)

.,-; .s

g,

,

..

e

FLORIDA.

POWER

CORPORATION

1

\\

i

HOC 11RBEMP HOGRAM REVII!N

'

SW9EME OF RESUIES

FPC

ir=*milation testing aditmanan ocmcerns

Iniaad by EPRI rpihlines.

Fbtzr (4) specific programmatic concerns.

Seven (7) progrannatic concerns rnIand by FPC

self evaluation 1ere confimad.

l

!

FPC self identification has wadoed well.

l

(1)

_

-__

J

'

,

,

> a ; o.

  • s

,

I

a

F.LORIDA

POWER

CORPORATION

I

l

l.

HOCIRDENP HOCRAM REVIEW

SPECTFIC CONCIENS FEM REVIEN

ll

1

1.

OCNCEFE:

'Ibe ernifarturens' QA programa applied to -rcial grade

ih=w: my rot be clearly docxamented.

FN ACTICN:

Specify armifacturers' 10CFR50, Apperrilx B supam

Wenever possible.

>-t

Ebr armifacturers with multiple programs, specify

aauuslate program climble to eacti proaa- =>L.

2.

CINCERN:

Proctu===il method fear relW parts my not be consistet

with original perxxu===it.

FPC ACTICN:

Initial spare parts purt:hase will use same s=w-iffmtions as

origiml purttese.

I

i

t

(~'

I

_ _ _ _ _ _ _ _

_ - _ _ _ _ _ - -

-

.

.

,, . .. ,

'

.

FLORIDA

POWER

CORPORATION

PRXIIBENT HOGRAM REVIEN

SPECIFIC CCNCENS FBCM REVIEN

(Cbntinued)

3.

OCNCERN:

CriHm1 ' de *=ristim cannot always be adegtetely verified

througn receipt, venixr, or source irWdm.

FPC ACTICH:

Incitzle post-irm+allatim testing in Mimtion lau3mm when

required to verify critical characteristic.

4.

omcgN:

Parts my be placed in inventory with iWwte verificatim of

critimi characteristics.

FFC ACTION:

supplemt existing visual and mechanical inspectim with

additimal

electrical

testing deze

required to provide

assurance that invmtary itas meet specifimtims.

(3)

i

_ _ _ _ _

___ _ _ _ _ _ _ _

l

.

.

.

.

,

1

. . . . . ,

.

FLORIDA

POWER

CORPORATION

,

PROCIRBENT IBDGRAM FEVIFW

l

OtNGENS CCNFTIMP BY REVIBf

{

l

!

1.

(IN 3RN:

Additional amarrance is rwnbd that practa===mai gitirblires are

omsistently applied to procta====il pas kagus.

FPC ACTION:

All procxu==uc=it pk. asps will be reviewed by the skdicated

Nuclear Procta====al Ergineerirq D@artment.

2.

CINORN:

%=oritatics of eqttivalency needs inptuvement.

FPC ACITCH (Isle ===(ud ard effective 06-01-89):

Nuclear Engineering PIrrwitive 254 definEE the ptgmirq aTd

@==itation of eqt11 valency evaluations.

i

(4)

_ _ _ _ _ _ - _

_-____-___ _______ _-

-.

_ _ _ _ _ _ _ - - _ ,

.. *'

s

.. a .

,

j

.

FLORIDA

POWER

CORPORATION

.l

mxumerr mxmm man

00NORf6 OMPIRMED BY REVHN

'

(contirued)

i

3.

OCHCERN:-

'D e Material

O nlification Pbra

(My*,

prmaaa does rxt,

ad f=tely ad& cess current concerns regardirg tranaahility arut

equivalecy.

FPC ACTIW:

Eliminate M:)F ps.

Upgradirg will be performed only in

ammrdaire with the EPRI gt11& lines arut p..--Mires will be

developed to inplesment this prmaan.

4.

(INGEN:

PWrres to assure tramanhility of Wala to the natiu-

facturer den partimaad throtxp third parties are rot adarymte.

FPC ACTICH:

6

l

Material win te piremw frta aEx wmnever pnamiwle.

-

,

,

Additional safeguard g..--Mires will be applied to

,

third party pludasser:i.

(5)

I

!

_.- - _ . _ - - _ _ _ _ - _ _ _ _ _ - - .

i

-

.. . _ _ - .

. - - .

-

_

.

< .

,

,

,

1

., ., .r , -

e

.

,

FLOkIDA

POWER

CORPORATION

PRXHtDE!NT PIOGRAM REVGN

OCNCERS CGEDUED BY REVIBt

{

(Oartimed)

5.

(WCEM:

Criteria far approval of supplier Q1L programs for tv=wrcial

grade items ruwwh impromnent.

rm AcrIcs:

FPC will survey rmmarcial grade suppliers in arrvwtlance with

EPRI cfildalires.

6.

CONO:RN:

k

i

Identificaticri and h;--dotics of critical ctiaracteristics,

had cri intended safety function, rwwvh inpromnet.

)

i

l

l

i

l

1

l

1

l

(6)

o

. _-- _ - ------- - - _ - -_------_-----_-_----_-_;

. _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

_

.

,

.

.

.. .. a

.

,

F L O Vt I D A

POWER

CORPORATION

,

IBOCI]REMENT PROGUM REVIEW

!

b

OtNGRE 03EDDED BY REVIIN

(continued)

j

FFC MrICN:

Tag ruh(s) . or equtivalent data smari to define

safety

functions

will

be

documented

in

procta-a, systen.

Prmartirlas will be reviwri to inplanent EERI

entialines regarding identification of critical

characteristic.

critical characteristics will be verified by

vendar, FIC receivirg, or installation in ,--ticn

and testing.

1

1

(7)

t

-

.-__ _ _ - - _ - - - - - _ _ _ _

. _ .

__

-_

,

w

,

s , ,.s

,.

e

4

FLORIDA

POWER

CORPORATION

190COREMENr 202AM REVIBf

CIIMMS CDUTRMED BY REVIDF

(Cbntirued)

7.

(INCElPN:

verificaticm of critical cimu-4

stics were waived by-

Quality (bntrol Department (QC).

FIC ACTIN (Already imlananted):

Waiver of test or inapar+irri requirm concurrence of lxth QC and

F fier (Quality Engineer or Prtxxa-d. Engineer) to assure

i

that %_ ate alternate inapar+1rwis are perfcxaned.

(8)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ -