ML20247R375

From kanterella
Revision as of 18:59, 9 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Rev 14 to Physical Security Plan Consistent W/ Provisions of 10CFR50.54(p) & Acceptable
ML20247R375
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/25/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8906070218
Download: ML20247R375 (2)


Text

_ _ - - . _ _ _ _ - _

r .

<. , ;g

.. Q . '

Y*

4' In Reply' Refer To: MAY 2 51989

. Dockets: 50-498.

..- 50-499 0-j'.

Houston Lighting & Power Company l ATTN: .'J. H. Goldberg, Group Vice President,-Nuclear P.O. Box 1700-Houston,: Texas 77001-

Gentlemen

C

[ This-acknowledges the receipt of your letter. dated April 7, 1989, by which you

^ transmitted. Revision Number 14.to the Physical Security Plan for your facility.

.We find the. changes in the subject letter and the attachments thereto to be consistent with the provisions of 10 CFR 50.54(p). Accordingly, they are-acceptable 'for inclusion into the plan.

4 The. enclosures to your letter contain Safeguards Information'of a type

specified in 10 CFR 73.21 and are being withheld from. public disclosure.

Sincerely,

%j L. J. Callan', Director -

Division of Reactor Projects CC:

. Houston Lighting' & Power Company

' ATTN: .M. A. McBurnett, Manager Operations Support Licensing P.0 Box 289.-

t- 'Wadsworth,1 Texas -77483 Houston ~ Lighting & Power Company TTTN: ' Gerald E. Vaughn, Vice President Nuclear Operations P.O. Box 289 Wadsworth, Texas 77483 Houston Lighting & Power Company ATTN: J. T. Westermeier, General Manager South Texas Project P 0. Box'289

.Wadsworth,' Texas _.77483 \

-RIVdPS:RPB C: E :RPB C:RPB //

gj U[:d}SS h I 89-107 D: DRPH (t3 EarMt/ sir JEv t BMurray tFEBe&ch Callan 5/p/89' 5/f/89 f 54%/89 5 /Z4/89 f // 6/89 CASEWORK NUMBERS': 50-498/08-XA; 50-499/08-XA i

. gR .o607021s 890525

,p - ADOCK 0500049s _E-

?

g [\

-- . __Jann

g, ,

h9 V.

+ 9

'i, .:  %. "

V

. Houston (Lighting.& Power-  : ,

s .

I

~

L . Central- Power & Light Company

. ATTN: R.'L. Range /R. P. Verret-l- :P.0, Boxi2121.

L Corpus Christi,0 Texas 78403

  1. City of Austin-Electric Utility J' -ATTN: - R. J. ' Miner, Chief Operating:

H . .0fficer-721'Barton. Springs Road

' Austin,. Texas ~ 78704

~

.Newman &.Holtzinger, P.C.

ATTN: J. R.-Newman,' Esquire-x1615 L Street, N.W.

FWashington, D.C. 20036 Houston: Lighting & Power Company

~ ATTN: 'S. L. Rosen P.O. Box'289-Wadsworth, Texas -'77483. ,

. Houston Lighting &' Power Company-ATTN: R. W.EChewning, Chairman.

. Nuclear Safety Review Board P 0. Box ^289- '

L

.Wadsworth,-Texas 77483

, City Public Service Board ATTN: . R. J. .Costello/M. T.. Hardt P.O. Boxil771 San Antonio, Texas 78296 Houston Lighting'& Power Company-ATTN: : Licensing Representative Suite.610.

_Three Metro Center Bethesda, Maryland 20814

' Texas Rediation Control Program Director bec w/nonsafeguards portion of -letter dated April 7,1989:

DMB '(RG01)

R. D. Martin, RA DRP

., R. L..Bangart, DRSS- Branch Chief, RPB Security Inspector- Section Chief, SEPS:RPB

.Section Chief DRP/D Resident Inspector j

.m -P.-A. Starcher, RSGB/NRR RITS Coordinator 50.54(p) Book . SEPS:RPB Security- File

~

Physical Security. File. RIV File R.-E.-Hall, DRSS' Project Engineer, DRP/D DRS MIS G. Dick'_, NRR Project Manager b

_ _ _ . _ . . . _.__._____._______.___.___.__.____._______._____-______________.________w

. . . . SAFEGUARDS INFORMATION a

The Light company . ox 00 Houston. Texas 77001 (713) 228 9211 l{o,uston Lighting &: Power April 7,1989 ST-HL-AE-3049 File No.: G09.09 g _

@ f^EIg p fi 10CFR73.55 1 'y 10CFR50.54(p)

JM  !'

! '\ \ ' TA , ~ :+:-

\\

-U.'S.' Nuclear Regulatory Commission > L" _

Attention: Document Control Desk Washington, DC 20555 - -

South Texas Project Electric Generating Station Units 1 & 2 Docket Nos. STN 50-498 & STN 50-499 Thy =isal Security Plan, Revision 14 Enclosed are four copies of Revision 14 of the South Texas Project Physical Security Plan. In addition, two copies of the revision are being forwarded to NRC Region IV. This document supersedes all previous revisions.

None of the changes described in this revision represent any lessening of plan effectiveness. Therefore, this document is being submitted in accordance with 10CFR50.54(p)(2).

Changes have been made to Sections 3, 4, 5, 6, 7, and 9 and Appendix A of the Physical Security Plan. Descriptions of the changes are provided in Attachment 1.

The revised Sections and Appendix of the Physical Security Plan provided with this letter require protection as Safeguards Information in accordance with 10CFR73.21. When separated from the revised Section and Appendix, this letter is not considered Safeguards Information.

I If you have an) questions on this matter, please contact rne at (512)772-8530.

~

\

4fMc 3w M. A. McBurnett i Manager Operations Support Licensing l MAM/ PIN /km

Attachment:

Physical Security Plan, Revision 14 l . . . ,

l NFC e 'lFARATION THISI

' <:. IS Ci: CONTROL'.ED!

NL.89.096.01 r,, .

? r b '! '

( ljm7 X A Subsidiary of Houston Industrics incorporated 9yjjy

.}:,n,

e ..

,. , SAFEGUARDS IWORMATION t heuison 1.ighting & l'ower Company ST-HL- AE-3 04 9 --

B File No.: G09.09 Page 2 cc: Without Attachments-

    • Regional Administrator, Region IV Rufus Se-Scott Nuclear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company Arlington, TX 76011 P. O. Box 1700 Houston, TX 77001 George Dick, Project Manager U. S. Nuclear Regulatory Commission INFO.

Washington, DC 20555 Records Center 1100 Circle'75 Parkway Jack E. Bess Atlanta, Ga. 30339-3064 Senior Resident Inspector-Unit I c/o U.'S. Nuclear Regulatory Commission Dr. Joseph M. Hendrie P. O. Box 910 50 Be11 port Lane Bay City, TX 77414 Be11 port, NY 11713 J.-I. Tapia Senior Resident Inspector-Unit 2 c/o U. S. Nuclear Regulatory Commission P. O. Box 910 Bay City TX 77414 J. R. Newman, Esquire Newman & Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 R. John Miner (2 copies)

Chief Operating Officer City of Austin Electric Utility 721 Barton Springs Road Austin, TX 78704 R. J. Costello/M. T. Hardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296

    • Regional Administrator will receive ALL ATTACHMENTS r- - - - - - .

lUPON S._ARAT rr 0N 9!s; 9]/M!SDECONThogij Revised 12/21/88 NL.DIST SAFEGUARDS INFORMATION

, , WEGUARDS INFORMATION

SUMMARY

OF 10CFR 50.54(p) CHANGES TO STPEGS PHYSICAL SECURITY PLAN Revision 14 UPON SEPARATION THIS PAGE IS DECONTROLLED (Page 1 of 2) 3.2.4 Delete responsibility for Security Plans and specify that procedural responsibility entails only "certain procedures".

3.2.5 Add responsibility for security plans and "certain procedures".

3.2.5.1 New paragraph indicating that Manager, Nuclear Security Department is approval authority for procedures originating in the Nuclear Security Support Division.

3.2.6 Reflects organizational change creation of supervisor for receipt of direct report from security department training staff.

3.2.8 Added language allowing the Manager, Nuclear Security Department to designate sucession other than that specified in this section, to S11ow greater management flexibility.

3.3.4 Added words " security-related" to egree with 10CFR 73 Appendix B 1anguage.

4.1.1 Added exception to angled barbed wire topping on Protected Area Boundary to reflect vertical topping in the vicinity of the West Gatehouse.

4.1.5 Correction of typographical error, "Gatehouse" instead of "Gatehoue".

4.1.9 Repunctuated second sentence for clarity. Wording is otherwise identical to revision 13.

4.4.6 Change of organizational responsibility for keycards from Equipment and Systems Section to Operations Division.

5.1.4.1 Clarified that unescorted access granted at fingerprint submission is " temporary". Added new final sentence to indicate use of criminal history records in final access authorization decisions.

5.1.4.2 Restored Revision 12 language at request of NRC Region IV.

5.4.1.3 Add new final sentence describing turnstile keypads.

6.2.1 Amended final line to permit usuage of " dedicated security force personnel" instead of restricting function to alarm station operators.

6.2.1.1 Corrected grammatical error " surveyed" instead of "surveilled". l Added "or CAS" to end of final sentence to reflect capability of I either alarm station to perform the function.

SAFEGUARDS INFORMATION

- - _ _ - - _ - - _ - 1

bMtUUAIG)5 INFORMATION

SUMMARY

OF 10CFR 50.54(p) CHANGES TO STPEGS PHYSICAL SECURITY PLAN Revision 14 UPON SEPARATION THis PAGE IS DECONTROLLED (Page 2 of 2) 6.7.2.1 Amended to reflect correct location of security computers.

7.1.1.1 Modified to reflect engineering study of communications system "as-built".

7.1.1.2 Modified to reflect engineering study of communications system "as-built".

7.1.2.1 Modified to reflect engineering study of communications system "as-built".

7.1.2.2 Modified to reflect engineering study of communications system "as-built".

7.1.2.5 New paragraph regarding command control consoles occasioned by engineering rtudy of communications system "as-built".

7.1.2.6 Formerly 7.1.2.5, changed to reflect role of command control consoles in "hard-wired intercom" as delineated in communications system "as-built" engineering study.

7.1.2.7 Formerly 7.1.2.6, No textual changes.

9.2.1 Deadly force statement modified to rely on Tex 0s State Law and Company Policy. Former statement did not addr ss several force justifications permissable under Texas Law.

App. A A.8 Deleted word " enhanced".

l t

i SAE3 GUARDS IPORMATION

!