Forwards Insp Repts 50-327/86-49 & 50-328/86-49 on 860906-1005.Violation Re Repeated Failure of upper-head Injection Isolation Valve Response Time Surveillances Being Considered for Escalated Enforcement Action
ML20207P326
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/08/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20207P327 List:
References
NUDOCS 8701150413
Download: ML20207P326 (2)


See also: IR 05000327/1986049

Text

-

E t-

!~ c & c. Q

w -

q_. --G

JAN08f957

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

Jennessee Valley Authority

ATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Merket Street

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-327/86-49 AND 50-328/86-49

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

K. M. Jenison on September 6 - October 5, 1986. The inspection included a review

of activities authorized for your Sequoyah facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. These areas

include a review of licensee action on previous inspection' findings, required

surveillance testing, inadvertent starts of the Emergency Diesel Generators, IE

Information Notices, and License Conditions. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observation of activities in progress.

Sequoyah has had a repeated history of failed UHI isolation valve response time

surveillances. The cause of the repeated surveillance failures was not adequately

determined by Sequoyah and corrective action was not taken to preclude further

failures. This violation, described in the enclosed Inspection Report, is under

consideration for escalated enforcement action. Accordingly, no Notice of

Violation is being issued at this time, and no response to this letter is required.

However, please be advised that the number and characterization of violations

described in the enclosed Inspection Report may change as a result of further NRC

review. You will be advised by separate correspondence of the results of our

deliberations on this matter.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

8701250413 87otog

gDR ADOCK 05000327

PDR

r

' {

rJFoi

, -

..

1

,

.-

.

.

Tennessee Valley Authority 2

JAN 0 81M

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original signed by

M. L. Ernst (for)

J. Nelson Grace

Regional Administrator

Enclosure:

NRC Inspection Report

cc w/ enc 1:

M L. Abercrombie, Site Director

Sequoyah Nuclear Plant

M R. Wallace, Plant Manager

(K. W. Cantrell, Acting Director

Nuclear Engineering

LR'. L. Gridley, Director

Nuclear Safety and Licensing

d. R. Harding, Site Licensing

Manager

bcc w/ encl:

G. G. Zech, RII

LX ,R. Denton, NRR

W. L. Thompson, NRR

/.M. Taylor,IE

t.M B. Hayes, OI

V R. Connelly, OIA

K. P. Barr, RII

tNRC Resident Inspector

NRC Document Control Desk

State of Tennessee

RTT DTT - nTT- - "

'

RII RII kE.

GM M tbr B arr011 8- '#5 I

11hS/86 13/y/86 #[

it IGG Wl n/7/es

J