Category:NOTICE OF DEVIATION/NONCONFORMANCE FROM A REGULATORY
MONTHYEARML20215G9881987-04-10010 April 1987 Notice of Nonconformance from Insp on 870223-27 & 0324 ML20206D8851987-04-0808 April 1987 Notice of Nonconformance from Insp on 870309-11 ML20207S2921987-03-17017 March 1987 Notice of Nonconformance from Insp on 870126-30 ML20211B8481987-02-13013 February 1987 Notice of Nonconformance from Insp on 870112-14 ML20210E9201987-02-0606 February 1987 Notice of Nonconformance from Insp on 861020-24 ML20210A9591987-02-0505 February 1987 Notice of Nonconformance from Insp on 861202-05 ML20210G0331987-02-0202 February 1987 Notice of Nonconformance from Insp on 861117-21 ML20213A0131987-01-29029 January 1987 Notice of Nonconformance from Insp on 861119-21 ML20207P4351987-01-0202 January 1987 Notice of Nonconformance from Insp on 860825-29 ML20207S2711986-12-24024 December 1986 Notice of Nonconformance from Insp on 860414-18 & 0714-18 ML20215A4901986-12-0303 December 1986 Notice of Nonconformance on 861027-30 ML20214Q3131986-11-28028 November 1986 Partially Deleted Notice of Nonconformance from Insp on 860714-18 (Ref 10CFR2.790) ML20214Q2361986-11-18018 November 1986 Notice of Nonconformance from Insp on 861020-24 ML20214A1991986-11-0707 November 1986 Notice of Nonconformance from Insp on 860714-16 ML20214A1191986-11-0707 November 1986 Notice of Nonconformance from Insp on 860922-26 ML20215N5641986-10-27027 October 1986 Notice of Nonconformance from Insp on 860825-29 ML20211D8481986-10-20020 October 1986 Notice of Nonconformance from Insp on 860915-18 ML20215J6821986-10-10010 October 1986 Notice of Nonconformance from Insp on 860519-23 ML20215F8671986-10-0303 October 1986 Notice of Nonconformance from Insp on 860623-27 ML20215B9491986-10-0202 October 1986 Notice of Nonconformance from Insp on 860728-0801 ML20215C9001986-10-0202 October 1986 Notice of Nonconformance from Insp on 860811 & 12 ML20210H0581986-09-24024 September 1986 Notice of Nonconformance from Insp on 860623-27 ML20210C9791986-09-16016 September 1986 Notice of Nonconformance from Insp on 860721-25 ML20214L7881986-09-0202 September 1986 Notice of Nonconformance from Insp on 860621-26 ML20212P7651986-08-28028 August 1986 Notice of Nonconformance from Insp on 860602-06 ML20206P5061986-08-21021 August 1986 Notice of Nonconformance from Insp on 860623-26 ML20214K3471986-08-14014 August 1986 Notice of Nonconformance from Insp on 860609-12 ML20203H9471986-08-0101 August 1986 Notice of Nonconformance from Insp on 860616-18 ML20207K9351986-07-28028 July 1986 Notice of Nonconformance from Insp on 860414-18 ML20203F1641986-07-28028 July 1986 Notice of Nonconformance from Insp on 860609-11 ML20204B3881986-07-28028 July 1986 Notice of Nonconformance from Insp on 860530-0604 ML20203F0631986-07-28028 July 1986 Notice of Nonconformance from Insp on 860414-30 ML20211P7341986-07-21021 July 1986 Notice of Nonconformance from Insp on 860422-25 ML20206J3161986-06-25025 June 1986 Notice of Nonconformance from Insp on 860512-16 ML20199C8821986-06-13013 June 1986 Notice of Nonconformance from Insp on 860324-27 ML20198J6571986-05-27027 May 1986 Notice of Nonconformance from Insp on 860211-13 ML20198D2151986-05-21021 May 1986 Notice of Nonconformance from Insp on 860317-21 ML20197E0211986-05-13013 May 1986 Notice of Nonconformance from Insp on 860127-31 ML20203H9401986-04-28028 April 1986 Notice of Nonconformance from Insp on 851209-13 ML20203D4001986-04-18018 April 1986 Notice of Nonconformance from Insp on 851021-23 ML20203A8591986-04-15015 April 1986 Notice of Nonconformance from Insp on 851217 & 31 ML20203A9051986-04-14014 April 1986 Notice of Nonconformance from Insp on 860127-31 ML20210G2281986-03-31031 March 1986 Notice of Nonconformance from Insp on 860210-14 ML20195B6951986-03-27027 March 1986 Notice of Nonconformance from Insp on 860317-19 ML20154N0201986-03-13013 March 1986 Notice of Nonconformance from Insp on 851120-22 ML20154B3661986-02-28028 February 1986 Notice of Nonconformance from Insp on 851104-08 ML20141M8431986-02-26026 February 1986 Notice of Nonconformance from Insp on 851220 ML20141G1661986-02-25025 February 1986 Notice of Nonconformance from Insp on 860106-10 ML20214C9651986-02-19019 February 1986 Notice of Nonconformance from Insp on 851112-15 ML20153C0541986-02-14014 February 1986 Notice of Nonconformance from Insp on 851209-13 1987-04-08
[Table view]Some use of "" in your query was not closed by a matching "". Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20215G9881987-04-10010 April 1987 Notice of Nonconformance from Insp on 870223-27 & 0324 ML20206D8851987-04-0808 April 1987 Notice of Nonconformance from Insp on 870309-11 IR 05000354/19870101987-04-0707 April 1987 Insp Rept 50-354/87-10 on 870316-20.No Violations Noted. Major Areas inspected:post-accident Monitoring Sys Conformance W/Rev 2 to Reg Guide 1.97.Open Item Identified Re Identification of Category 2 Equipment ML20206M7981987-04-0707 April 1987 Insp Rept 50-312/86-41 on 861201-870212.Unresolved & Open Items Identified.Major Areas Inspected:Activities Supporting Restart & Ensuring Safe Operation of Plant After Restart, Including Stated Phases of Sys Review & Test Program ML20206D8361987-04-0707 April 1987 Insp Rept 99900271/87-01 on 870127-29.No Violations, Nonconformances or Unresolved Items Noted.Major Areas Inspected:Corrective Action Re Intermittent Failures & Review of Test Results on Three Failed Transmitters ML20215G9961987-04-0606 April 1987 Insp Rept 99900383/87-01 on 870223-27.Nonconformance Noted: Pressure Gauge Not Calibr for Over 0-30 Psig Range & 30 Psig Pressure Test of O-ring Seals Failed Pressure Drop Requirement ML20206F9681987-04-0303 April 1987 EN-87-029:on 870408,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Will Be Issued.Action Based on Loss of Approx 141,000 Gallons of Water from Spent Fuel Pools Through Fuel Transfer Canal IR 05000327/19870051987-04-0303 April 1987 Insp Repts 50-327/87-05 & 50-328/87-05 on 870119-23.No Violations or Deviations Noted.Major Areas Inspected:Review & Evaluation of 13 Employee Concern Task Group Final Sequoyah Element Repts IR 05000327/19870061987-04-0303 April 1987 Design Calculation Review Insp Repts 50-327/87-06 & 50-328/87-06 on 870202-13.No Violations Noted.Major Areas Reviewed:Adequacy of Util Design Calculation Review Program & Extent Program Augments Design Baseline Re Restart ML20206E8121987-04-0101 April 1987 Insp Repts 50-445/86-26 & 50-446/86-22 on 860901-1031. Violations & Deviations Noted:Cable Pulling Ropes Left in Unit 1 Conduits & Cable Trays & Failure of Inspector to Write Memo Documenting Nonconforming Condition IR 05000445/19860261987-04-0101 April 1987 Insp Repts 50-445/86-26 & 50-446/86-22 on 860901-1031. Violations & Deviations Noted:Cable Pulling Ropes Left in Unit 1 Conduits & Cable Trays & Failure of Inspector to Write Memo Documenting Nonconforming Condition ML20206D9141987-04-0101 April 1987 Insp Rept 99901085/87-01 on 870309-11.Nonconformances Noted: Failure to Administer Exam by Level III Examiner or Designated Representative & 1986 Eye Exams for Listed Level II Examiners Missing IR 05000327/19860681987-03-31031 March 1987 Insp Repts 50-327/86-68 & 50-328/86-68 on 861201-12 & 870112-23.Violations Noted:Licensee Failed to Assure That Applicable ASME Code Requirements Included in Procurement of Specific safety-related Code Class Equipment ML20215E4831987-03-31031 March 1987 EN-87-026:on 870331,order Suspending Power Operation & Order to Show Cause Issued to Util Due to Discovery That Control Room Staff Have Been Sleeping During Various Shifts.Related Documents Encl ML20206D1901987-03-31031 March 1987 Insp Rept 99901088/87-01 on 870121.Major Areas Inspected: Corrective Action Taken Re 860917 Part 21 Rept Concerning Potential Problem in Pressure Transducers ML20205R4601987-03-30030 March 1987 Insp Rept 99900762/87-01 on 870203-04.No Noncompliances or Violations Noted.Major Areas Inspected:Allegations Re Use of Uncertified Welders & Possible Falsification of Welding Records.Two of Nine Allegations Substantiated IR 05000267/19870041987-03-27027 March 1987 Insp Rept 50-267/87-04 on 870126-30.No Violations Noted. Major Areas Inspected:Program to Maintain Qualification of Electrical Equipment Per 10CFR50.49.Potential Enforcement/ Unresolved Items & Open Items of Program Listed IR 05000277/19870061987-03-23023 March 1987 Fitness for Duty Program Insp Repts 50-277/87-06 & 50-278/87-06 on 870202-06.Observations Noted:Util Written Policies Do Not Address Features of Commission Policy Statement or EEI Guide & No Overall Audit Performed ML20205H3661987-03-23023 March 1987 EN-87-023:on 870326,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $50,000 Will Be Issued to Licensee.Action Based on Failure to Obtain Prior NRC Approval of Criteria Change for Reactor Coolant Flow ML20205H2411987-03-23023 March 1987 EN-87-022:on 870326,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $12,500 Will Be Issued to Licensee.Action Based on Numerous Violations of NRC Requirements Re Overexposure to Workers ML20207S2811987-03-17017 March 1987 Notice of Violation from Insp on 870126-30 ML20207S2921987-03-17017 March 1987 Notice of Nonconformance from Insp on 870126-30 IR 05000275/19860331987-03-17017 March 1987 Insp Repts 50-275/86-33 & 50-323/86-31 on 861215-19. Deficiencies Noted.Major Areas Inspected:Implementation Program for Establishing & Maintaining Environ Qualification of Electrical Equipment Important to Safety ML20205D2131987-03-16016 March 1987 Insp Repts 50-445/86-22 & 50-446/86-20 on 860701-0831. Violations & Deviations Noted:Stainless Steel & Carbon Steel Stored in Outside Areas W/Improper Protective End Coverings & Records of Heat Treatment Not Available for Disc Inserts ML20207R5751987-03-13013 March 1987 EN-86-074A:on 870313,order Issued Imposing Civil Penalties in Amount of $3,000 to Univ of Utah,Based on Transportation, Health Physics,Safeguards & Operations Violations Noted in 860930 Enforcement Notification EN-86-074 ML20207R3341987-03-11011 March 1987 EN-87-019:on 870311,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $50,000 Will Be Issued for Licenses.Action Based on Three Examples of Degraded Vital Area Barriers ML20207R4851987-03-0909 March 1987 EN-87-017:on 870312,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 Will Be Issued to Util Based on Failure to Provide Adequate Design Control to Ensure Emergency Feedwater Pump Operability ML20207R3701987-03-0909 March 1987 EN-87-015:on 870312,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $50,000 Will Be Issued for License.Action Based on Violation of Tech Spec Re ECCS Subsystems ML20207S3331987-03-0606 March 1987 Insp Rept 99901079/87-01 on 870126-30.Violation Noted:Two Nuclear Purchase Orders Accepted & Fulfilled W/O 10CFR21 Program in Effect.Nonconformance Noted:Master Ammeter Had No Sticker to Identify Calibr Status IR 05000327/19860701987-03-0303 March 1987 Insp Repts 50-327/86-70 & 50-328/86-70 on 861208-12.No Programmatic Deficiencies W/Regard to Facility Maint of Environmentally Qualified Equipment Identified.Major Areas Inspected:Maint Program & Previous Insp Items ML20207R0301987-03-0303 March 1987 EN-87-014:on 870306,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Issued to Licensee.Action Based on Failure to Establish & Maintain Operability of Nuclear Svc Water Sys ML20212F0181987-03-0202 March 1987 Notice of Violation from Insp on 870112-14 ML20212F0331987-02-27027 February 1987 Insp Rept 99901080/87-01 on 870112-14.Violation Noted: Failure to Adopt Procedure to Evaluate or Rept Defects Discovered in Motors Supplied to Customers Under Part 21 ML20212B1991987-02-26026 February 1987 EN-86-029A:on 870226,order Imposing Civil Monetary Penalty in Amount of $50,000 Issued to Licensee Based on Licensee 860703 Response to 860501 Notice of Violation & Proposed Imposition of Civil Penalty.Section I Violation Did Occur ML20212H0491987-02-26026 February 1987 EN-87-012:on 870303,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000 Will Be Issued Based on Violations in Areas of Facility Design,Maint & Mods IR 05000498/19860421987-02-20020 February 1987 Engineering Assurance Program Insp Repts 50-498/86-42 & 50-499/86-42 on 861215-19.Major Areas Inspected:Task 84-4, Separation & Fire Protection Criteria & Task 85-4, High Energy Line Break Analysis ML20211P4311987-02-19019 February 1987 EN-87-010:on 870224,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 Will Be Issued to Util Based on Multiple Violations Re Safeguards Info Protection Program ML20212E7581987-02-18018 February 1987 Insp Rept 99900507/86-01 on 861201-05.No Violations or Noncompliance Noted.Major Areas Inspected:Status of Previous Findings,Dedication of Commercial Grade Items Overview & 10CFR21 Evaluation & Reporting Review ML20211B8481987-02-13013 February 1987 Notice of Nonconformance from Insp on 870112-14 ML20211B8161987-02-13013 February 1987 Notice of Violation from Insp on 870112-14 ML20211B9021987-02-13013 February 1987 Insp Rept 99900816/87-01 on 870112-14.Violation Noted:Mfg Did Not Specify Application of Part 21 Requirements on Listed Purchase Orders.Nonconformances Noted:Quality Sys Program Not Invoked on Listed Orders & Order Data Differed ML20211B5511987-02-12012 February 1987 EN-85-084A:on 851213,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $900,000 Will Be Issued to Licensee.Action Based on 850609 Failure of Auxiliary Feedwater Sys to Perform Intended Function ML20210U0531987-02-10010 February 1987 Insp Rept 99901067/86-01 on 861103-07.Nonconformance Noted: NDE Technician Certified W/O Attaining Passing Grade on Magnetic Particle Exam,Per Procedure QC-2.Data Sheets Encl IR 05000321/19860351987-02-0707 February 1987 Equipment Qualification Insp Repts 50-321/86-35 & 50-366/86-35 on 861103-07.Major Areas Inspected:Program for Establishing & Maintaining Qualification of Electric Equipment Per 10CFR50.49.Five Deficiencies Noted ML20210E9371987-02-0606 February 1987 Insp Rept 99900015/86-01 on 861020-29.Noncomformance Noted: Mechanical & Chemical Testing Svc Performed by Outside Lab W/O Advising Lab of 10CFR21 Requirements & Incorrect Audits of Vendors ML20210E9201987-02-0606 February 1987 Notice of Nonconformance from Insp on 861020-24 IR 05000508/19860121987-02-0606 February 1987 Insp Rept 50-508/86-12 on 860915-1215.No Violations Noted. Major Areas Inspected:Readiness Review Program Module C3-01, Earthwork & Followup on Insp Repts 50-508/86-10 & 50-508/86-11 ML20210A9591987-02-0505 February 1987 Notice of Nonconformance from Insp on 861202-05 ML20210B0011987-02-0404 February 1987 Insp Rept 99900835/86-01 on 861203-05.Nonconformances Noted:Controls Necessary to Ensure Charging Motors Purchased from Subvendors Conform to Drawings Not Established ML20210P9041987-02-0303 February 1987 EN-87-005:on 870209,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Will Be Issued to Util Based on Ofc of Investigations Investigation Re Employment Termination of Technician 1987-04-08
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
_ _ _ _
APPENDIX B Conax Buffalo Corporation Docket No. 99900323/86-01
- NOTICE OF NONCONFORMANCE Based on the results of an NRC inspection conducted on April 14-30,1986, i t appears that certain of your activities were not conducted in accordance with NRC requirements. Nonconformances with these requirements are as follows:
A. Criterion I, " Organization," of Appendix B of 10 CFR Part 50 states, in
" ...the quality assurance functions are those of (a) assuring that part:
an appropriate quality assurance program is established and effectively executed and (b) verifying, such as by checking, auditing, and inspection, that activities affecting the safety-related functions have been correctly performed...."
Section 1.1, " Statement of Authority and Policy," of the Conax Buffalo Corporation (CBC) Nuclear Quality Assurance Manual (NQAM) states, in part:
"Conax Buffalo Corporation... pledges to continue to produce components and*
parts for nuclear power plants in accordance with the requirements of Section III, Division I, of the ASME Boiler and Pressure Vessel Code; Appendix B of 10 CFR Part 50; and ANSI N45.2. In order to meet these requirements, a nuclear quality assurance program is hereby established
...the quality of all products, and services whether manufactured by Conax or obtained from an outside supplier, shall be controlled at all points necessary to assure conformance within specification requirements...."
Contrary to the above, CBC failed to assure that an appropriate nuclear quality assurance program was established and effectively executed for the control of nuclear safety-related activities performed at the Conax Florida facility (approximate time period was between December 1983 until April 1986). These activities were in regard to the manufacture of Standby Liquid Control (SLC) squib valve components and included drawing changes, purchasing, fabricating, handling, shipping, storing, cleaning, inspecting, testing, and repairs (86-01-03).
B. Criterion II, " Quality Assurance Program," of Appendix B to 10 CFR Part 50
" ...The quality assurance program shall provide control states, in part:
over activities affecting the quality of the identified... systems and com-ponents, to an extent consistent with their importance to safety. Activities affecting quality shall be occomplished under suitably controlled condi-tions...The program shall take into account the need for special controls, processes...and skills to attain the required quality, and the need for
$7300089860728 99900h79ENVCONAX PDR
verification of quality by inspection and test. The program shall provide for indoctrination and training of personnel performing activities affec-ting qualitysas necessary... Management of other organizations...shall review the... adequacy...of the quality assurance program which they are executing." .
Contrary to the above, the CBC failed to assure that the Conax Florida facility personnel were indoctrinated in regard to the nuclear quality assurance requirements and codes, from December,1983 until April 22, 1986(86-01-04).
C. Criterion V, " Instructions, Procedures, and Drawings", of Appendix B to 10 CFR Part 50 states: " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings. Instructions, procedures, or draw-ings shall include appropriate cuantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished."
Contrary to the above, CBC has failed to establish adequate procedures, instructions, or drawings, delineating qualitative.or quantitative accep-."
tance criteria for determining that the squib valve explosive primer chamber " potting" process has been sat'sfactorily performed (86-01-05).
D. Criterion VII, " Control of Purchased Material, Equipment, and Services",
of Appendix B to 10 CFR Part 50 states, in part: " Measures shall be esta-blished to assure chat purchased material, equipment, and services, whether purchased direct 1 / or through contractors and subcontractors, conform to the procurement documents. These measures shall include provisions, as appropriate, for source evaluation and selection...The effectiveness of the control of quality by contractors and subcontractors shall be assessed by the applicant or designee at intervals consistent with the importance...."
Contrary to the above, CBC failed to perform source evaluations to establish the effectiveness of the control of quality activities at the Conax Florida facility in regard to the trigger and EPC assemblies (86-01-06).
E. Criterion IX, " Control of Special Processes," of Appendix B to 10 CFR Part 50 states: " Measures shall be established to assure that special processes, including welding, heat treating, and nondestructive testing, are controlled and accomplished by qualified personnel using qualified procedures in accordance with applicable codes, standards, specifica-tions, criteria, and other special requirements."
Contrary to the above, CBC has failed to establish a qualified " potting" procedure for the accomplishment of safety-related EPC activities at both Conax faciliYies (86-01-07).
F. Criterion XV, " Nonconforming Material, Parts, or Components" of Appendix B to 10 CFR Part 50 states, " Measures shall be established to control mate-rials, parts, or components which do not conform to requirements in order to prevent their inadvertent use or installation. These measures shall include, as appropriate, procedures for identification, documentation, segregation, disposition, and notification to affected organizations. Non-conforming items shall be reviewed and accepted, rejected, repaired or re-worked in accordance with documented procedures.
Contrary to the above, records were not in evidence' to assure that CBC adequately controlled a " potting" process deviation found in six of twelve EPC assemblies which were assembled and potted at the Conax Florida facility, shipped to CBC, and then shipped to the Susquehanna nuclear station (re-ference GE P0 #205-83L438, 10/20/83) (86-01-08). Specifically:
- 1. No nonconformance report or similar record was written to identify thd potting deviation. A January 31, 1984 Conax internal memo discusses the deviation and indicates that subsequent rework was !*
performed at the Buffalo facility.
- 2. No records were written to document the Buffalo facility rework and re-inspection of the six nonconforming EPC assemblies for the Susquehanna nuclear site.
G. Criterion XVI, " Corrective Action", of Appendix B to 10 CFR Part 50 states:
" Measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are prceptly identified and corrected.
In the case of significant conditions adverse to quality, the treasures shall assure that the cause of the condition is determined and corrective action taken to preclude repetition. The identification of the significant condition adverse to quality, the cause of the condition, and the corrective action taken shall be documented and reported to appropriate levels of management."
Contrary to the above, records were not in evidence to assure that CBC l adequately identified and corrected a " potting" process deviation found in six of twelve EPC assemblies which were assembled and potted at the Conax Florida facility, shipped to the CBC (where rework was performed),
and then shipped to the Susquehanna nuclear station (reference GE PO
- 205-83L438, 10/20/83) (86-01-09). Specifically:
- 1. No documents were written which would indicate that the significant condition adverse to cuality was reviewed for root cause and that actions were taken to preclude repetition.
1 -
_4_
- 2. No records were written which would indicate that corrective actions were performed and that appropriate levels of management were aware of the problem, with the exception of the Conax January 31, 1984 internal memo.
It should be noted 'that this deviation to the special " potting" process is significant to safety because the explosive power output is an inverse function of voids or gaps around the explosive primers.
O m